Dy. Municipal Commissioner ( East Zone) Ahmedabad Municipal Corporation
Providing and Laying Sewerage Network in TP-111, 505, 414 & 415 including Kathwada Gamtal with Trunkmain from TP-414 to 1800 mm dia existing Trunkmain near Odhav Vepari Mahamandal in East Zone of AMC area ( Re-Invite)
285029
EZ 31-2025-26
Open
Miscellaneous Works
Works
Ahmedabad
3 documents required · 3 mandatory
₹18,000
Yes
Municipal Commissioner, Ahmedabad
₹59.7 L
Yes
10 Mar 2026
10 Mar 2026
10 Mar 2026
18 Mar 2026
10 Mar 2026
Providing and Laying Sewerage Network in TP-111,
414 & 415 including Kathwada Gamtal with Trunkmain
from TP-414 to 1800 mm dia existing Trunkmain near
Odhav Vepari Mahamandal in East Zone of AMC area
Volume II :- Financial Bid
Schedule of Quantities & Rates
(1) Date of download : www.tender.nprocure.com
(2) Last date of online Tender Submission : 18/03/2026 Upto 18.00 hours
(3) Last of Date of Submission of Tender Fees, : 19/03/2026 Upto 16.00 hours.
EMD & Other documents in hard copy at
AMC office by Speed Post or Registered
Post AD or Courier
(4) Date of Tender (Technical Bid) Opening : 19/03/2026 Upto 17.00 hours
Municipal Commissioner Multi Media Consultants Pvt. Ltd.
Ahmedabad Municipal Corporation 401, Shivalik Shilp,
Sardar Patel Bhavan Iskcon Cross Roads, S. G. Highway,
Ahmedabad – 380 001 Ahmedabad - 380
Gujarat (INDIA) Phone : (079)- 40399079 /
e-mail : [email protected],
website : mmcpl.co.in
AHMEDABAD MUNICIPAL CORPORATION
BILL OF QUANTITIES
A. General I nstruction for the BOQ
1. The Bill of Quantities shall be reading conjunction with the Instruction to Bidders,
Conditions of Contract, Technical Specifications.
2. The bidder is advised to visit and examine the Site of Works and its surroundings and
obtain for itself on its own responsibility all information that may be necessary for
preparing the bid and entering into a contract for construction of the Works. The costs
of visiting the Site shall be at the bidders own expense. No claim in future for
unknown with the site by the bidder shall be granted in any case.
3. The quantities given in the Bill of Quantities are estimated and provisional and are
given to provide a common basis for bidding. The basis of payment will be the actual
quantities of work ordered and carried out, as measured by the Contractor and verified
by the Engineer and valued at the rates and prices bid in the priced Bill of Quantities,
where applicable, and otherwise at such rates and prices as the Engineer may fix
within the terms of the Contract. Contractor shall not raise any claim for too less
or too more quantities executed by him. Quantity may vary with respect to BOQ
as well as place of work also may change cited in the tender.
4. The rates and prices Bid in the priced Bill of Quantities, except in so far as it is
otherwise, provided under the Contract, include all constructional plant, labour,
supervisions, materials, all temporary works and false works, erection, maintenance,
establishment and overhead charges, profit, any taxation and levies, octroi and other
charges together with all general risks, liabilities and obligations set out or implied in
the Contract and including remedy of any defects during the Defects Liability Period.
5. The stipulated rates in BOQ are entirely in India Rupee Currency.
6. Rates shall be entered both in figures and words against total amount of Bill of
6. Rates shall be entered both in figures and words against total amount of Bill of
Quantities. However, Items (for which rate has been provided) against which no
quantity is entered will be paid for by the Employer on actual measurement onsite
7. The whole cost of complying with the provisions of the Contract shall be deemed to
have been included in the items provided in the priced Bill of Quantities.
8. General directions and descriptions of work and materials are not necessarily repeated
or summarized in the Bill of Quantities. Reference to the relevant sections of the
contract documentation shall be made before quoting the bid against each item in the
Bill of Quantities.
9. The method of measurement of completed work for payment shall be in accordance
with the requirement as stated in the individual sections of the Technical
Specifications.
10. Contractor shall credit the material dismantled during the work in progress in AMC
store suggested by Engineer in charge of the work.
11. AMC reserves the right to decrease the scope of work or to incase of any condition.
AMC may start it after approval of competent authority.
Detailed technical specification for all the Items above shall be relevant to PWD manual
general material specification there in during the construction period of the contract.
Contractor should adhere to the specifications and same shall be considered as the tender
Incase of any discrepancy the decision of engineer in-charge shall be considered as final.
In case of any dispute the decision of City Engineer shall be considered as final.
Seal and Signature of the Bidder Additional City Engineer
Date: Ahmedabad Municipal Corporation
Providing and Laying Sewerage Network in TP-111, 505, 414 &
including Kathwada Gamtal with Trunkmain from TP-414 to 1800 mm
dia existing Trunkmain near Odhav Vepari Mahamandal in East Zone of
PRICE QUOTATION SHEET
Earnest Money Paid Rs. : Rs. 59,69,867/-
Date of Opening of Tender :
Quoted Price in Rs. 59,69,86,761/-
I / We am / are willing to carry out work at _____________________ % above / below* percent (should be written in figures and
words) of the estimated cost, as mentioned above. Amount of my / our tender works out for Rs. ________________ (in figures)
Estimated amount put to tender Rs. Estimated amount put to tender Rs.
Add ________ % above Rs. __________ Deduct ________ % below Rs. ___________
Total Rs. __________ Net Rs. ___________
Signature of Contractor Additonal City Engineer (East Zone)
Name : Ahmedabad Municipal Corporation
Company's Seal :
PROVIDING AND LAYING SEWERAGE NETWORK IN TP-111, 505, 414 &
INCLUDING KATHWADA GAMTAL WITH TRUNKMAIN FROM TP-414 TO
MM DIA EXISTING TRUNKMAIN NEAR ODHAV VEPARI MAHAMANDAL IN EAST
ZONE OF AMC AREA
Sr. No. Component Amount (Rs.)
(1) Sewerage Network Scheme in TP-111, 505, 414 & 415
(Kathwada) in East Zone of AMC Area (Length-43.5 Km)
(2) Sewerage Trunkmain from TP-414 to 1800 mm dia Existing
Trunkmain near Odhav Vepari Mahamandal
(i) Sewerage Trunkmain from TP-414 to 1800 mm dia Existing
Trunkmain near Odhav Vepari Mahamandal (Length-9.2 Km.)
(ii) Pipe Pushing work for crossing 900 mm dia RCC NP4 pipe
by 1600 mm dia RCC NP4 pipe under Canal at two locations
(iii) Pipe Pushing work for crossing 900 mm dia RCC NP4 pipe
by 1600 mm dia RCC NP4 pipe under ONGC Line
(iv) Pipe Pushing work for Crossing 1200 mm dia RCC NP4 pipe
by 2000 mm dia RCC NP4 pipe for 36 mt. wide road
(v) 2700 mm dia 32 mm Plate thickness MS pipe pushing work
for Crossing 1800 mm dia RCC NP4 pipe by under
Ahmedabad-Kathalal NH-59
(3) Shifting of Utilities
(4) Providing & laying Sewerage Network in Kathwada Gamtal
and Tebli Para in East Zone of AMC area
Total Cost (1+2+3+4)
Signature of Contractor Addl. City Engineer (East Zone)
Name Ahmedabad Municipal Corporation
SCHEDULE OF QUANTITIES AND RATES
PROVIDING & LAYING SEWERAGE NETWORK SCHEME IN TP-111, 505, 415 & 415 (KATHWADA) IN EAST
ZONE OF AMC AREA
Item Description Qty Rate in Rs. Unit Amount
1 Excavation for pipe line trenches etc. for all with shoring and strutting if
required as per required gradient and line including safety provisions
using site rails and stacking excavated stuff including up to all required
lead cleaning the site etc. complete for all lifts and strata as specified.
In all sort of soils and soft murrum
2 Providing bedding incl. ramming, watering,levelling,consolidating etc. 3925.00 329.00 m 3
as per standard and instruction of engineer incharge . As above with
required quality Sand brought from Outside including all lead
3 Extra rate over item of excavation of earth if excavation is to be done in 111055.00 18.04 m3
wet condition without resorting to pumping out incl. of bailing out of
4 Manufacturing, testing, supplying, loading, transporting to worksite,
unloading. RCC pipe in SRC Cement of following class with Socket and
spigot joints as per IS 458 -2021 including EPDM Rubber ring as per IS
5382-1985 etc. comp. As Directed by Engineering in charge.
5 Lowering, laying and jointing R. C. C. pipes of following diameters in
proper position, grade and alignment at all level as directed by
Engineer-in-charge including conveyance from stores to site of work,
labour, giving hydraulic testing as per ISI code.
R.C.C. PIPES (At any Depth)
Item Description Qty Rate in Rs. Unit Amount
6 Providing & Constructing Precast RCC Manhole in RCC M-40 grade
Controlled concrete as per drawing, in OPC including excavation,
mm thick P.C.C. in M-15, Reinforcement in TMT-500, PVC Foot steps,
Providing & fixing FRC Manhole frame & cover including inside epoxy
paint complete etc.
For 300, 450 & 600 dia. Pipe(upto 4 m. depth)
(i) 1.2 dia x 3.0m Depth 280.00 51514.00 No
For 300,450 & 600 dia. Pipe (More than 4.0 mt. depth) & for 900 mm
dia.pipe for any depth
(i) 1.5 dia x 2.0m Depth 30.00 50843.00 No
(i) 1.5 dia x 3.0m Depth 11.00 69438.00 No
(i) 1.5 dia x 4.0m Depth 3.00 69388.00 No
7 Constructing Scrapper Slab Type M.H. Chamber of following size incl.
excavation, refilling, brick bats cement concrete (1:5:10) of thickness
C.M., C.C. channel (1:2:4) of thickness 10 C.M., finished 15 mm thick
cement plaster inside & outside (only for shaft) in C.M.1:3, finishing
with cement slurry, P/F 4 mm dia M.S Steel HDPE coated steps 35 cm
c/c at 35 cm staggered Masonry in C.M. 1:5, RCC slab in CC 1 : 1.5 :
of thickness 23 C.M, including Cantering & reinforcement (double jalli
at 15 C.M c/c bothway 12 mm dia.) but excluding the cost of Manhole
seat cover etc. completed (Inside Clear, M.H. length should be parallel
<= 1200 mm dia.
<= 1400 mm dia.
8 Providing and fixing F.R.C. MH seat cover incl. carting to the work site 12.00 2146.25 No.
etc. comp. Directed. F.R.C. Extra Heavy Duty (EHD-35) Manhole Covers
& Frames Cover: 728mmø & 100 mm thick circular cover, 35.00MT load
design,100 x 2mm MS flat all round,16mm øplain round bar for lifting
the cover & should be fitted with plastic cups. Frame:560mm ø clear
opening, -888 x 888 x 175mm. On the upper periphery off rame 25x3
mm wide MS flat should be well embed in concrete to protect the
edges off rame. FRCE.H.D.-35 manhole cover & frame described as
9 Providing and casting in situ C.C. in grade M-20 (proportions as per mix 700.00 5520.00 m3
design or as per table9 of IS456 2000 in masses by weigh batching )
using granite, quartzite trap metal of size 6 mm to 20 mm for RCC work,
including scaffolding centering, formwork, needle vibrated
consolidation, curing complete up to 6 meter depth or height
(excluding cost of reinforcement and neat finishing) with centering and
shuttering/deshuttering etc. complete for structure other than water
Item Description Qty Rate in Rs. Unit Amount
10 Supplying cutting, bending, binding and placing in position steel as per 42.00 77504.00 MT
plan and design and as per ISS 2502 including cost of steel and binding
wire for reservoirs/structures. Do-deformed (TMT) bars confirming to
relevant IS Fe-500 grade for all diameters.
11 Extra rate over item of excavation of earth for excavation of asphalt
pavement/RCC of thickness upto 0.2 mt. including demolishing the
asphalt carpet, metal, solling/cutting reinforcement etc. complete with
stacking the material as directed.
a) Upto 0.2 meter thickness (By Manual) 18120.00 72.14 Smt.
12 Extra rate over item of excavation of earth for excavation of asphalt 7765.00 180.36 Smt.
pavement/RCC of thickness upto 0.3 mt. (By any type of breaker
machine of RCC Cutter machine including cost of operator, fuel,
&transportation etc complete).
13 Providing, laying, spreading and compacting graded stone aggregate to 6475.00 1146.95 m3
wet mix macadam specification including premixing the Material with
water at OMC in mechanical mix plant carriage of mixed Material by
tipper to site, laying in uniform layers in subbase/ base course on well
prepared surface and compacting with vibratory roller to achieve the
desired density as per MoRTH clause
14 Dismentaling of the existing structure including removing and stacking 360.00 886.05 m3
the dismentelled materials as and where directed (a) R.C.C Work
15 Construction of 150 mm thick un-reinforced plain cement concrete 1195.00 928.00 Sq.m
pavement with M - 25 grade of concrete including provision of
contraction, construction and longitudinal joints, joint filler, , sealant
primer, joint sealant, finishing to lines and grades as per drawing as per
MoRTH clause 602 over a 100 mm thick WMM with necessary
excavation/loosening and recompacting ground as per respective
MoRTH specification and as directed by engineerin charge
16 Refilling the pipeline trenches incl. ramming, watering, consolidating 353045.00 22.00 m3
disposal of surplus stuff as directed within a radius of 3 km.
17 Providing and erecting steel ventilating columns of 12.0 mt. height & 15 22.00 17278.21 No.
cms. With C.I. ornamental cap safely with the help of required capacity
of hydra crane or any type of required capacity of crane and base fixed
firmly with necessary foundation with one coat of red lead oxide paint
and one coat of any approved color with 15 cms. dia. stoneware or
R.C.C. pipe connection with M.H. including excavation and jointing as
required etc. complete
18 Shoring or timbering for trench with 50 mm thick planks and suitable 1320.00 71.00 Sq.m
size truts etc. complete.
19 Dewatering by pumping set of required capacity including temporary 27300.00 18.32 HP/hr
platform carting pumping at site and fixing the same in position
including all accessories, and fuel and labour etc. complete.
20 Conveyance charge of earth, lime, murrum, building 'rubbish, manual
garbage, sludge, excavated rock, fly ash,'aggregate of any kind etc.
Item Description Qty Rate in Rs. Unit Amount
21 Carting and recarting of materials such as murum, earth, kapchi, gravel,
brick bats, kankar, sand, debris etc. from the site to approved location,
including loading, unloading, stacking and spreading etc. complete.
22 Making connection to the ex. M.H. in running sewer incl. Dewatering
and other required machinery etc. of following dia pipes at any
convenient time. All damaged work shall be well repaired as per
instructions.etc. complete.
23 Dnlling of 900mm dia Horizontal borehole for watermain pipeline
crossing under the road incl in all strata with requried length incl fixing
of 800mm dia RCC casing pipe with pushing etc complete for 300 mm
Dia (For crossing ONGC pipeline)
Without Water main & with RCC Casing Pipe 90.00 17385.00 Rmt.
24 Drilling of 1300mm dia Horizontal borehole for water main pipeline
crossing under the road incl in all strata with required length incl
fixing of 1200 mm dia RCC casing pipe with pushing etc complete for
Without Water main & with RCC Casing Pipe 60.00 30143.00 Rmt.
Signature of Contractor Addl. City Engineer (East Zone)
Name Ahmedabad Municipal Corporation
Schedule of Quantities and Rates
Sewerage Trunkmain from TP-414 to 1800 mm dia Existing Trunkmain near Odhav Vepari Mahamandal
in East zone of AMC Area
Item Description Qty Rate in Rs. Unit Amount
01 Excavation for pipe line trenches etc. for all with shoring and
strutting if required as per required gradient and line including safety
provisions using site rails and stacking excavated stuff including up to
all required lead cleaning the site etc. complete for all lifts and strata
as specified. In all sort of soils and soft murrum
02 Providing bedding incl. ramming, watering, levelling, consolidating 3390.00 329.00 m
etc. as per standard and instruction of engineer In charge . As above
with required quality Sand brought from Outside including all lead
03 Providing and casting situ cement concrete (1:4:8) bedding using 1235.00 3393.00 m
granite quartizite trap metal of size 25 mm to 40 mm including
consolidation, curing etc. complete.
04 Extra rate over item of excavation of earth if excavation is to be done 105005.00 18.04 m
in wet condition without resorting to pumping out incl. of bailing out
05 Manufacturing, testing, supplying, loading, transporting to worksite,
unloading. RCC pipe in OPC Cement of following class with Socket
and spigot joints as per IS 458 -2021 including EPDM Rubber ring as
per IS 5382-1985 etc. comp. As Directed by Engineering in charge.
06 Manufacturing, testing, supplying, loading, transporting to worksite,
unloading. RCC pipe in SRC Cement of following class with Socket and
spigot joints as per IS 458 -2021 including EPDM Rubber ring as per IS
5382-1985 etc. comp. As Directed by Engineering in charge.
07 Extra rate in above item for 3.0 mm thick T-rib type HDPE Lining to
be installed in the RCC pipe during manufacturing of RCC pipe by
vertical vibration casting process. The rate includes manufacturing,
supplying to factory site of RCC Pipe, installing in mould of RCC Pipe
including field jointing of liner as per specification. Liner should be
jointed and installed to correct line in the pipe as per direction and
guideline prescribed by manufacturer.
Item Description Qty Rate in Rs. Unit Amount
08 Lowering, laying and jointing R. C. C. pipes of following diameters in
proper position, grade and alignment at all level as directed by
Engineer-in-charge including conveyance from stores to site of work,
labour, giving hydraulic testing as per ISI code.
R.C.C. PIPES (At any Depth)
09 Providing & Constructing Precast RCC Manhole in RCC M-40 grade
Controlled concrete as per drawing, in OPC including excavation,
mm thick P.C.C. in M-15, Reinforcement in TMT-500, PVC Foot steps,
Providing & fixing FRC Manhole frame & cover including inside epoxy
paint complete etc.
For 300, 450 dia. Pipe(upto 4 m. depth)
(i) 1.2 dia x 2.0m Depth 5.00 39937.00 No
(ii) 1.2 dia - 2.01 to 2.99 m Depth 5.00 9034.00 Rmt.
(i) 1.2 dia x 3.0m Depth 14.00 51514.00 No
For 900 mm dia.pipe for any depth
(i) 1.5 dia x 2.0m Depth 4.00 50843.00 No
(i) 1.5 dia x 3.0m Depth 12.00 69438.00 No
(i) 1.5 dia x 4.0m Depth 42.00 69388.00 No
(i) 1.5 dia x 5.0m Depth 29.00 86302.00 No
(i) 1.5 dia x 6.0m Depth 1.00 98679.00 No
For 1200 mm dia.pipe for any depth
(i) 2.0 dia x 4.0m Depth 18.00 118741.00 No
(i) 2.0 dia x 5.0m Depth 10.00 120497.00 No
(i) 2.0 dia x 6.0m Depth 6.00 132989.00 No
(i) 2.0 dia x 7.0m Depth 36.00 152150.00 No
10 Providing and casting in situ C.C. in grade M-20 (proportions as per 70.00 5520.00 m
mix design or as per table9 of IS456 2000 in masses by weigh
batching ) using granite, quartzite trap metal of size 6 mm to 20 mm
for RCC work, including scaffolding centering, formwork, needle
vibrated consolidation, curing complete up to 6 meter depth or
height (excluding cost of reinforcement and neat finishing) with
centering and shuttering/deshuttering etc. complete for structure
other than water retaining
Item Description Qty Rate in Rs. Unit Amount
11 Supplying cutting, bending, binding and placing in position steel as 5.00 77504.00 MT
per plan and design and as per ISS 2502 including cost of steel and
binding wire for reservoirs/structures. Do-deformed (TMT) bars
confirming to relevant IS Fe-500 grade for all diameters.
12 Extra rate over item of excavation of earth for excavation of asphalt
pavement/RCC of thickness upto 0.2 mt. including demolishing the
asphalt carpet, metal, solling/cutting reinforcement etc. complete
with stacking the material as directed.
a) Upto 0.2 meter thickness (By Manual) 31450.00 72.14 Smt.
13 Extra rate over item of excavation of earth for excavation of asphalt 13480.00 180.36 Smt.
pavement/RCC of thickness upto 0.3 mt. (By any type of breaker
machine of RCC Cutter machine including cost of operator, fuel &
transportation etc complete).
14 Providing, laying, spreading and compacting graded stone aggregate 11235.00 1146.95 m
to wet mix macadam specification including premixing the Material
with water at OMC in mechanical mix plant carriage of mixed
Material by tipper to site, laying in uniform layers in subbase / base
course on well prepared surface and compacting with vibratory
roller to achieve the desired density as per MoRTH clause
15 Refilling the pipeline trenches incl. ramming, watering, 328950.00 22.00 m3
consolidating disposal of surplus stuff as directed within a radius of
16 Providing and erecting steel ventilating columns of 12.0 mt. height & 41.00 17278.21 No.
15 cms. With C.I. ornamental cap safely with the help of required
capacity of hydra crane or any type of required capacity of crane and
base fixed firmly with necessary foundation with one coat of red lead
oxide paint and one coat of any approved color with 15 cms. dia.
stoneware or R.C.C. pipe connection with M.H. including excavation
and jointing as required etc. complete
17 Shoring or timbering for trench with 50 mm thick planks and suitable 116035.00 71.00 Sq.m
size truts etc. complete.
18 Construction of Cast in situ RCC Chamber in M 40 grade concrete
including Reinforcement of size 2.8 mt. x 2.8 mt. for 3.5 mt. height
from bottom of shaft & 1.5 mt. dia. Precast RCC machinehole in M-
40 grade concrete above Cast in situ chamber upto ground level
inculding excavation, refilling, transportation, providing & fixing
mm dia. extra heavy duty machinehole frame & cover ,inside zinc
epoxy paint , providing & fixing PVC foot steps etc. complete
Cast-in Situ RCC Chamber for 3.5 mt. heigth from Bottom of shaft
Item Description Qty Rate in Rs. Unit Amount
a) Base slab 330.00 8407.00 mt
c) Top slab 129.00 8407.00 mt3
(v) PVC Foot step 420.00 87.00 No.
(vi) Epoxy paint 1650.00 90.00 m
(vii) C.C (M-15) for Benching 90.00 4906.00 m
(viii) Refilling 4866.00 22.00 m3
Precast RCC Machinehole above Cast in situ chamber upto ground
(i) Conical Slab 21.00 8407.00 mt3
(ii) Precast RCC Panel 48.00 8277.00 mt3
(iii) TMT Fe-500D 8.00 77504.00 MT
(iv) Epoxy paint 494.00 90.00 m
(v) Hiring charges of Crane & labour for Pre cast Panel 30.00 2250.00 Nos.
(vii) FRC machinehole Frame and cover 30.00 2146.25 Nos.
(viii) PVC Foot step 381.00 87.00 Nos.
19 Conveyance charge of earth, lime, murrum, building 'rubbish, manual
garbage, sludge, excavated rock, fly ash,'aggregate of any kind etc.
20 Carting and recarting of materials such as murum, earth, kapchi,
gravel, brick bats, kankar, sand, debris etc. from the site to approved
location, including loading, unloading, stacking and spreading etc.
(ii) 5 to 10 Km lead 500.00 459.26 m
21 Dewatering by pumping set of required capacity including temporary 27300.00 18.32 HP/hr
platform carting pumping at site and fixing the same in position
including all accessories and fuel and labour etc. complete.
22 Making connection to the ex. M.H. in running sewer incl. Dewatering
and other required machinery etc. of following dia pipes at any
convenient time. All damaged work shall be well repaired as per
instructions.etc. complete.
Signature of Contractor Addl. City Engineer (East Zone)
Name Ahmedabad Municipal Corporation
Schedule of Quantities and Rates
Pipe Pushing work for crossing 900 mm dia RCC NP4 pipe by 1600 mm dia RCC NP4 pipe
under Canal at Two locations
Item Description Qty. Rate in Rs. Unit Amount
01 Laying 1.6 m. dia. RCC NP4 pipe (by Pushing method) 30.00 122985.00 Rmt.
of required length including open excavation for thrust
bed necessary form work, concreting, curing, vibrating
pushing etc. complete as per contractor's own design
approved by competent authority based on approved
GAD by competent authority.
The item includes
(a) Providing and laying M-25 grade for cast in situ
thrust bed and thrust wall with necessary
excavation with shoring and strutting, formwork,
curing, vibrating as per contractor's own design
approved by Authority.
(b) Providing and fixing TMT-Fe-500 bars including
thrust bed and thrust wall including supplying,
cleaning, cutting, bending and placing in position,
lapping, binding with 16 SWG soft iron wire
irrespective of locations and levels
(c) Providing front shield, intermediate shield,
jointing, jacking rigs, sliding channels spacers etc.
All the structural steel used except intermediate
shields will be ownership of contractor after
pushing work is completed.
(d) Pushing with hydraulic jack without disturbance
to pavement including all necessary excavation for
thrust bed and thrust wall, necessary shoring and
strutting required, necessary dewatering required
if any, excavation within the Pipe with all
necessary refilling upto ground level after pushing
work completed including carting of extra earth
upto a lead of 5 Kms. This also includes necessary
labour cost for pushing and including necessary
cost of hydraulic pipe and oil for hydraulic jacks
including necessary depreciation cost of jack.
(e) Applying 2 coats of approved quality epoxy
painting on precast units after casting work
completed including necessary grouting with
cement between two precast units after pushing
work is completed.
Item Description Qty. Rate in Rs. Unit Amount
02 Excavation for trenches with shoring & strutting if
required as per required gradient and line including all
safety provision using site rails and stacking excavated
stuff including up to all required lead cleaning the site
etc. complete for all lift and strata as specified. In all sorts
of Soil and soft murrum.
03 Construction of chambers built in RCC M30 with OPC
cement with TMT Fe-500 reinforcement,PCC150 mm
thick in M 15,RCC M30 for wall, base slab and top 'slab,
including formwork etc. complete. Concrete 'work should
be fair finish.
i) Top Slab 14.00 8213.00 m3
ii) Bottom Slab 14.00 8213.00 m3
iii) Wall 71.00 8083.00 m3
c) Reinforcement TMT Fe-500 12.38 77504.00 MT
04 Providing and applying Epoxy paint of approved make to 240.00 90.00 m2
concrete surface for RCC work or any other structure
including cleaning the surface by scrapping and air
blowers to the satisfaction of Engineer-in-charge
necessary scaffolding etc. complete with all leads and lifts
and giving satisfactory hydraulic test for water tightness
as per IS codes.
For new surface- Two coats
05 RCC precast M.H. Frame & Cover Manufacture, supply 4.00 2146.25 No.
& Delivery at site of work precast RCC M.200 Frame &
cover suitable to drainage M.H. and as per type design
& Drawing including cost of reinforcement M.S. Angles
or Flat, curing mold work etc.
Heavy Duty Frame & cover suitable for 560 mm
06 Providing and fixing water tight construction or 23.00 330.00 Rmt
expansion joints 150 mm. dia. Wide thin ribbed PVC
07 Extra rate over item of excavation of earth for excavation 60.00 72.14 Sq.m.
of asphalt pavement/RCC of thickness upto 0.2 mt.
including demolishing the asphalt carpet, metal,
solling/cutting reinforcement etc. complete with stacking
the material as directed. a) Upto 0.2 meter thickness (By
Item Description Qty. Rate in Rs. Unit Amount
08 Providing and supplying lSI Standard R.C.C. pipes(of
OPC) in standard lengths of following class and diameter
suitable Socket and Spigot joints including EPDM
Rubber Ring as per IS 5382-1985 including all taxes,
insurance, transportation, freight charges, octroi,
inspection charges, loading, unloading, conveyance to
departmental stores, stacking etc. complete. (IS - 458 -
RCC NP4 Pipe (with OPC Cement)
09 Manufacturing, testing, supplying, loading,transporting to
worksite,unloading, lowering , laying & jointing RCC
NP4 pipe with Socket and spigot joints with ISI mark of
IS 458-2021 including EPDM Rubber ring as per IS 5382-
1985 etc.comp.As Directed by Engineering in charge
RCC NP4 Pipe (with OPC Cement)
10 Extra rate in above item for 3.0 mm thick T-rib type
HDPE Lining to be installed in the RCC pipe during
manufacturing of RCC pipe by vertical vibration casting
process. The rate includes manufacturing, supplying to
factory site of RCC Pipe, installing in mould of RCC Pipe
including field jointing of liner as per specification. Liner
should be jointed and installed to correct line in the pipe
as per direction and guideline prescribed by
RCC NP4 Pipe (OPC Cement)
11 Refilling the trenches incl. ramming, watering, 148.00 22.00 m3
consolidating desposal of surplus stuff as directed within
a radius of 3 km.
12 Providing and fixing plastic moulded reinforced steps 80.00 87.00 No.
'with 10 mm TOR steel bar with plastic polyproclene
(P.P.) material (vergin)etc complete.
Item Description Qty. Rate in Rs. Unit Amount
13 Conveyance charge of earth, lime, murrum, building
'rubbish, manual garbage, sludge, excavated rock, fly
ash,'aggregate of any kind etc. complete.
(ii) 5 to 10 Km lead 98.00 459.26 m3
Signature of Contractor Addl. City Engineer (East Zone)
Company’s seal Ahmedabad Municipal Corporation
Schedule of Quantities and Rates
Pipe Pushing work for crossing 900 mm dia RCC NP4 pipe by 1600 mm dia RCC NP4 pipe
under ONGC Line
Item Description Qty. Rate in Rs. Unit Amount
01 Laying 1.6 m. dia. RCC NP4 pipe (by Pushing method) 25.00 71690.00 Rmt.
of required length including open excavation for thrust
bed necessary form work, concreting, curing, vibrating
pushing etc. complete as per contractor's own design
approved by competent authority based on approved
GAD by competent authority.
The item includes
(a) Providing and laying M-25 grade for cast in situ
thrust bed and thrust wall with necessary
excavation with shoring and strutting, formwork,
curing, vibrating as per contractor's own design
approved by Authority.
(b) Providing and fixing TMT-Fe-500 bars including
thrust bed and thrust wall including supplying,
cleaning, cutting, bending and placing in position,
lapping, binding with 16 SWG soft iron wire
irrespective of locations and levels
(c) Providing front shield, intermediate shield,
jointing, jacking rigs, sliding channels spacers etc.
All the structural steel used except intermediate
shields will be ownership of contractor after
pushing work is completed.
(d) Pushing with hydraulic jack without disturbance
to pavement including all necessary excavation for
thrust bed and thrust wall, necessary shoring and
strutting required, necessary dewatering required
if any, excavation within the Pipe with all
necessary refilling upto ground level after pushing
work completed including carting of extra earth
upto a lead of 5 Kms. This also includes necessary
labour cost for pushing and including necessary
cost of hydraulic pipe and oil for hydraulic jacks
including necessary depreciation cost of jack.
(e) Applying 2 coats of approved quality epoxy
painting on precast units after casting work
completed including necessary grouting with
cement between two precast units after pushing
work is completed.
Item Description Qty. Rate in Rs. Unit Amount
02 Excavation for trenches with shoring & strutting if
required as per required gradient and line including all
safety provision using site rails and stacking excavated
stuff including up to all required lead cleaning the site
etc. complete for all lift and strata as specified. In all sorts
of Soil and soft murrum.
03 Construction of chambers built in RCC M30 with OPC
cement with TMT Fe-500 reinforcement,PCC150 mm
thick in M 15,RCC M30 for wall, base slab and top 'slab,
including formwork etc. complete. Concrete 'work should
be fair finish.
i) Top Slab 7.00 8213.00 m3
ii) Bottom Slab 7.00 8213.00 m3
iii) Wall 36.00 8083.00 m3
c) Reinforcement TMT Fe-500 6.25 77504.00 MT
04 Providing and applying Epoxy paint of approved make to 120.00 90.00 m2
concrete surface for RCC work or any other structure
including cleaning the surface by scrapping and air
blowers to the satisfaction of Engineer-in-charge
necessary scaffolding etc. complete with all leads and lifts
and giving satisfactory hydraulic test for water tightness
as per IS codes.
For new surface- Two coats
05 RCC precast M.H. Frame & Cover Manufacture, supply 2.00 2146.25 No.
& Delivery at site of work precast RCC M.200 Frame &
cover suitable to drainage M.H. and as per type design
& Drawing including cost of reinforcement M.S. Angles
or Flat, curing mold work etc.
Heavy Duty Frame & cover suitable for 560 mm
06 Providing and fixing water tight construction or 23.00 330.00 Rmt
expansion joints 150 mm. dia. Wide thin ribbed PVC
07 Extra rate over item of excavation of earth for excavation 30.00 72.14 Sq.m.
of asphalt pavement/RCC of thickness upto 0.2 mt.
including demolishing the asphalt carpet, metal,
solling/cutting reinforcement etc. complete with stacking
the material as directed. a) Upto 0.2 meter thickness (By
Item Description Qty. Rate in Rs. Unit Amount
08 Providing and supplying lSI Standard R.C.C. pipes(of
OPC) in standard lengths of following class and diameter
suitable Socket and Spigot joints including EPDM
Rubber Ring as per IS 5382-1985 including all taxes,
insurance, transportation, freight charges, octroi,
inspection charges, loading, unloading, conveyance to
departmental stores, stacking etc. complete. (IS - 458 -
RCC NP4 Pipe (with OPC Cement)
09 Manufacturing, testing, supplying, loading,transporting to
worksite,unloading, lowering , laying & jointing RCC
NP4 pipe with Socket and spigot joints with ISI mark of
IS 458-2021 including EPDM Rubber ring as per IS 5382-
1985 etc.comp.As Directed by Engineering in charge
RCC NP4 Pipe (with OPC Cement)
10 Extra rate in above item for 3.0 mm thick T-rib type
HDPE Lining to be installed in the RCC pipe during
manufacturing of RCC pipe by vertical vibration casting
process. The rate includes manufacturing, supplying to
factory site of RCC Pipe, installing in mould of RCC Pipe
including field jointing of liner as per specification. Liner
should be jointed and installed to correct line in the pipe
as per direction and guideline prescribed by
RCC NP4 Pipe (OPC Cement)
11 Refilling the trenches incl. ramming, watering, 83.00 22.00 m3
consolidating desposal of surplus stuff as directed within
a radius of 3 km.
12 Providing and fixing plastic moulded reinforced steps 40.00 87.00 No.
'with 10 mm TOR steel bar with plastic polyproclene
(P.P.) material (vergin)etc complete.
Item Description Qty. Rate in Rs. Unit Amount
13 Conveyance charge of earth, lime, murrum, building
'rubbish, manual garbage, sludge, excavated rock, fly
ash,'aggregate of any kind etc. complete.
(ii) 5 to 10 Km lead 56.00 459.26 m3
Signature of Contractor Addl. City Engineer (East Zone)
Company’s seal Ahmedabad Municipal Corporation
Schedule of Quantities and Rates
Pipe Pushing work for crossing 1200 mm dia RCC NP4 pipe by 2000 mm dia RCC NP4 pipe
for 36 mt. wide road
Item Description Qty. Rate in Rs. Unit Amount
01 Laying 2.0 m. dia. RCC NP4 pipe (by Pushing method) 36.00 60620.00 Rmt.
of required length including open excavation for thrust
bed necessary form work, concreting, curing, vibrating
pushing etc. complete as per contractor's own design
approved by competent authority based on approved
GAD by competent authority.
The item includes
(a) Providing and laying M-25 grade for cast in situ
thrust bed and thrust wall with necessary
excavation with shoring and strutting, formwork,
curing, vibrating as per contractor's own design
approved by Authority.
(b) Providing and fixing TMT-Fe-500 bars including
thrust bed and thrust wall including supplying,
cleaning, cutting, bending and placing in position,
lapping, binding with 16 SWG soft iron wire
irrespective of locations and levels
(c) Providing front shield, intermediate shield,
jointing, jacking rigs, sliding channels spacers etc.
All the structural steel used except intermediate
shields will be ownership of contractor after
pushing work is completed.
(d) Pushing with hydraulic jack without disturbance
to pavement including all necessary excavation for
thrust bed and thrust wall, necessary shoring and
strutting required, necessary dewatering required
if any, excavation within the Pipe with all
necessary refilling upto ground level after pushing
work completed including carting of extra earth
upto a lead of 5 Kms. This also includes necessary
labour cost for pushing and including necessary
cost of hydraulic pipe and oil for hydraulic jacks
including necessary depreciation cost of jack.
(e) Applying 2 coats of approved quality epoxy
painting on precast units after casting work
completed including necessary grouting with
cement between two precast units after pushing
work is completed.
Item Description Qty. Rate in Rs. Unit Amount
02 Excavation for trenches with shoring & strutting if
required as per required gradient and line including all
safety provision using site rails and stacking excavated
stuff including up to all required lead cleaning the site
etc. complete for all lift and strata as specified. In all sorts
of Soil and soft murrum.
03 Construction of chambers built in RCC M30 with OPC
cement with TMT Fe-500 reinforcement,PCC150 mm
thick in M 15,RCC M30 for wall, base slab and top 'slab,
including formwork etc. complete. Concrete 'work should
be fair finish.
i) Top Slab 10.00 8213.00 m3
ii) Bottom Slab 10.00 8213.00 m3
iii) Wall 42.00 8083.00 m3
c) Reinforcement TMT Fe-500 7.75 77504.00 MT
04 Providing and applying Epoxy paint of approved make to 150.00 90.00 m2
concrete surface for RCC work or any other structure
including cleaning the surface by scrapping and air
blowers to the satisfaction of Engineer-in-charge
necessary scaffolding etc. complete with all leads and lifts
and giving satisfactory hydraulic test for water tightness
as per IS codes.
For new surface- Two coats
05 RCC precast M.H. Frame & Cover Manufacture, supply 2.00 2146.25 No.
& Delivery at site of work precast RCC M.200 Frame &
cover suitable to drainage M.H. and as per type design
& Drawing including cost of reinforcement M.S. Angles
or Flat, curing mold work etc.
Heavy Duty Frame & cover suitable for 560 mm
06 Providing and fixing water tight construction or 27.00 330.00 Rmt
expansion joints 150 mm. dia. Wide thin ribbed PVC
07 Extra rate over item of excavation of earth for excavation 40.00 72.14 Sq.m.
of asphalt pavement/RCC of thickness upto 0.2 mt.
including demolishing the asphalt carpet, metal,
solling/cutting reinforcement etc. complete with stacking
the material as directed. a) Upto 0.2 meter thickness (By
Item Description Qty. Rate in Rs. Unit Amount
08 Providing and supplying lSI Standard R.C.C. pipes(of
OPC) in standard lengths of following class and diameter
suitable Socket and Spigot joints including EPDM
Rubber Ring as per IS 5382-1985 including all taxes,
insurance, transportation, freight charges, octroi,
inspection charges, loading, unloading, conveyance to
departmental stores, stacking etc. complete. (IS - 458 -
RCC NP4 Pipe (with OPC Cement)
09 Manufacturing, testing, supplying, loading,transporting to
worksite,unloading, lowering , laying & jointing RCC
NP4 pipe with Socket and spigot joints with ISI mark of
IS 458-2021 including EPDM Rubber ring as per IS 5382-
1985 etc.comp.As Directed by Engineering in charge
RCC NP4 Pipe (with OPC Cement)
10 Extra rate in above item for 3.0 mm thick T-rib type
HDPE Lining to be installed in the RCC pipe during
manufacturing of RCC pipe by vertical vibration casting
process. The rate includes manufacturing, supplying to
factory site of RCC Pipe, installing in mould of RCC Pipe
including field jointing of liner as per specification. Liner
should be jointed and installed to correct line in the pipe
as per direction and guideline prescribed by
RCC NP4 Pipe (OPC Cement)
11 Refilling the trenches incl. ramming, watering, 106.00 22.00 m3
consolidating desposal of surplus stuff as directed within
a radius of 3 km.
12 Providing and fixing plastic moulded reinforced steps 40.00 87.00 No.
'with 10 mm TOR steel bar with plastic polyproclene
(P.P.) material (vergin)etc complete.
Item Description Qty. Rate in Rs. Unit Amount
13 Conveyance charge of earth, lime, murrum, building
'rubbish, manual garbage, sludge, excavated rock, fly
ash,'aggregate of any kind etc. complete.
(ii) 5 to 10 Km lead 69.00 459.26 m3
Signature of Contractor Addl. City Engineer (East Zone)
Company’s seal Ahmedabad Municipal Corporation
Schedule of Quantities and Rates
2700 mm dia 32 mm Plate thickness MS pipe pushing work for Crossing 1800 mm dia RCC
NP4 pipe by under Ahmedabad-Kathalal NH-59
Item Description Qty. Rate in Rs. Unit Amount
01 Laying 2.7 m. dia. 32 mm plate thickness MS Pipe (by 55.00 53070.00 Rmt.
Pushing method) of required length including open
excavation for thrust bed necessary form work,
concreting, curing, vibrating , pushing etc. complete as
per contractor's own design approved by competent
authority based on approved GAD by competent
The item includes
(a) Providing and laying M-25 grade for cast in situ
thrust bed and thrust wall with necessary
excavation with shoring and strutting, formwork,
curing, vibrating as per contractor's own design
approved by Authority.
(b) Providing and fixing TMT-Fe-500 bars including
thrust bed and thrust wall including supplying,
cleaning, cutting, bending and placing in position,
lapping, binding with 16 SWG soft iron wire
irrespective of locations and levels
(c) Providing front shield, intermediate shield,
jointing, jacking rigs, sliding channels spacers etc.
All the structural steel used except intermediate
shields will be ownership of contractor after
pushing work is completed.
(d) Pushing with hydraulic jack without disturbance
to pavement including all necessary excavation for
thrust bed and thrust wall, necessary shoring and
strutting required, necessary dewatering required
if any, excavation within the Pipe with all
necessary refilling upto ground level after pushing
work completed including carting of extra earth
upto a lead of 5 Kms. This also includes necessary
labour cost for pushing and including necessary
cost of hydraulic pipe and oil for hydraulic jacks
including necessary depreciation cost of jack.
(e) Applying 2 coats of approved quality epoxy
painting on precast units after casting work
completed including necessary grouting with
cement between two precast units after pushing
work is completed.
Item Description Qty. Rate in Rs. Unit Amount
02 Excavation for trenches with shoring & strutting if
required as per required gradient and line including all
safety provision using site rails and stacking excavated
stuff including up to all required lead cleaning the site
etc. complete for all lift and strata as specified. In all sorts
of Soil and soft murrum.
03 Construction of chambers built in RCC M30 with OPC
cement with TMT Fe-500 reinforcement,PCC150 mm
thick in M 15,RCC M30 for wall, base slab and top 'slab,
including formwork etc. complete. Concrete 'work should
be fair finish.
i) Top Slab 13.00 8213.00 m3
ii) Bottom Slab 13.00 8213.00 m3
iii) Wall 81.00 8083.00 m3
c) Reinforcement TMT Fe-500 13.375 77504.00 MT
04 Providing and applying Epoxy paint of approved make to 240.00 90.00 m2
concrete surface for RCC work or any other structure
including cleaning the surface by scrapping and air
blowers to the satisfaction of Engineer-in-charge
necessary scaffolding etc. complete with all leads and lifts
and giving satisfactory hydraulic test for water tightness
as per IS codes.
For new surface- Two coats
05 RCC precast M.H. Frame & Cover Manufacture, supply 2.00 2146.25 No.
& Delivery at site of work precast RCC M.200 Frame &
cover suitable to drainage M.H. and as per type design
& Drawing including cost of reinforcement M.S. Angles
or Flat, curing mold work etc.
Heavy Duty Frame & cover suitable for 560 mm
06 Providing and fixing water tight construction or 39.00 330.00 Rmt
expansion joints 150 mm. dia. Wide thin ribbed PVC
07 Extra rate over item of excavation of earth for excavation 50.00 72.14 Sq.m.
of asphalt pavement/RCC of thickness upto 0.2 mt.
including demolishing the asphalt carpet, metal,
solling/cutting reinforcement etc. complete with stacking
the material as directed. a) Upto 0.2 meter thickness (By
Item Description Qty. Rate in Rs. Unit Amount
08 Designing, Manufacturing MS pipe as well as MS
specials in accordance of IS:5822-1994 or its latest
edition in suitable lengths from MS plates (plates shall be
as per IS : 2062-1992 or its latest edition of Grade 'B'-Fe
410), as per IS : 3589-1991 or its latest edition including
cutting, bending of plates to the required shapes, welding
by Metal arc Welding, having joints with bevelled ends
including ultrasonic and Radiographic at random
including inside & outside zinc epoxy paint in two coats
including hydraulic testing and tolerances for outside
diameter of pipe shell. Circularity test as per IS : 3589-
1991 and all other required tests, carting to the site of
coating and unloading, stacking, etc. including all taxes,
duties, local taxes etc. complete, as required.
(i) 2700 mm finished Inside Diameter (FID) 32 mm thick 55.00 159220.00 Rmt.
09 Manufacturing, testing, supplying, loading,transporting to
worksite,unloading, lowering , laying & jointing RCC
NP4 pipe with Socket and spigot joints with ISI mark of
IS 458-2021 including EPDM Rubber ring as per IS 5382-
1985 etc.comp.As Directed by Engineering in charge
RCC NP4 Pipe (with OPC Cement)
10 Extra rate in above item for 3.0 mm thick T-rib type
HDPE Lining to be installed in the RCC pipe during
manufacturing of RCC pipe by vertical vibration casting
process. The rate includes manufacturing, supplying to
factory site of RCC Pipe, installing in mould of RCC Pipe
including field jointing of liner as per specification. Liner
should be jointed and installed to correct line in the pipe
as per direction and guideline prescribed by
RCC NP4 Pipe (OPC Cement)
11 Refilling the trenches incl. ramming, watering, 190.00 22.00 m3
consolidating desposal of surplus stuff as directed within
a radius of 3 km.
12 Providing and fixing plastic moulded reinforced steps 55.00 87.00 No.
'with 10 mm TOR steel bar with plastic polyproclene
(P.P.) material (vergin)etc complete.
Item Description Qty. Rate in Rs. Unit Amount
13 Conveyance charge of earth, lime, murrum, building
'rubbish, manual garbage, sludge, excavated rock, fly
ash,'aggregate of any kind etc. complete.
Signature of Contractor Addl. City Engineer (East Zone)
Company’s seal Ahmedabad Municipal Corporation
Schedule of Quantities and Rates
Shifting of Utilities
Item Description Qty Rate in Rs. Unit Amount
1 Providing And Jointing Stoneware Pipes Incl. Excavation
Up to 2 Mt. Refilling, Transporting Pipes To Work
Site, Unloading, Lowering In Trench, jointing material
Such As Cement, sand, Hemp Bitumen As Directed, Incl.
Watering The Trenches Spreading And Carting away Of
Surplus material as directed by engineer in charge.
2 Constructing B. P. type catchpit of size 0.6x0.6 depth up to 30.00 1220.00 No
0.75 mt including excavation, BBCC (1:5:10) 23mm thick
brick wall in CM (1:6) with 5 mm thick cement plaster
inside the catchpit in the proportion of CM (1:3) without
jali etc. complete.
3 P/F with lead joints the CI/MS fitting over cut ends of
existing C.I/M.S. Pipes by prior jute caulking pouring lead
and caulking against to finish properly
4 Connecting the collapsed water supply pipe line of
following diameter as soon as possible bases, recovery
including all allied works like carting necessary pipe pieces
from owner stors, cutting the fractured ends to proper
shape, pumping out water working in wet condition,
working in at an instructured specific time of day or night
etc. complete in any length.
Item Description Qty Rate in Rs. Unit Amount
5 Labours charges for collecting specials from Municipals 500.00 21.64 Kg
store loading , transportation, unloading to the site, laying
and fixing CI specials inclusive of all jointing materials like
lead, spun etc. and labour, excavation re-filling and nece.
dewatering as per instrucation of engg. In charge.
6 P/F hanging by any means to proper gradient to keep the
temporary PVC lines (6kg/Sq.cm) flowing the following
sizes of PVC pipes to maintain the drainage coming from
distant bunglows to the chamber which is open from all
sides causing collapse of flowing existing drainage
incoming line to MH and keeping the pit free from rubbish.
7 Transporting from AMC store and laying spigot and
socket New DI pipe line DI-K-9 pipe of various classes
with CI/DI/MS specials of following diameters. Rate
includes excavation up to minimum 1.0 mt. depth from top
of pipe/as per requirement in any soil, refilling after laying
pipe, covering and temptation of carting surplus earth up to
30 mt. lead and watering and compaction. Clearing the site.
All Joint shall be made tight & leak free etc.comp.
8 Only Removing & Recover of existing CI/DI pipe line &
specials, removing any type of joint, carting it to the muni.
Stores as & where directed as per instruction of Engg. In
charge with excavation & refilling.
9 Removing silt from existing drainage line of any dia. meter 200.00 283.00 Cmt
in running water and carting the same up to all lead and lift
as mention below etc. complete as per instruction of
engineer in charge.
Item Description Qty Rate in Rs. Unit Amount
10 Repairing damaged M.H. and rasing M.H. up to road level
incl. removing damaged brick work and repairing by brick
masonry in C.M. 1:5 and plaster in C.M. 1:3 and fixing C.I.
steps and existing MH sheet cover, removing the
debris from MH and carting the same as directed.
a) upto 0.15 mt (@ Two Coarse) 15.00 739.46 No
b) upto 0.35 mt (@ Four Coarse) 15.00 1172.32 No
11 Dismentaling of tiled of Stonre flooring laid in mortar 200.00 47.72 m2
including stacking of servicable material with all leadand
12 Providing and casting in situ C.C. in grade M-20
(proportions as per mix design or as per table9 of IS456
2000 in masses by weigh batching ) using granite,
quartzite trap metal of size 6 mm to 20 mm for RCC work,
including scaffolding centering, formwork, needle vibrated
consolidation, curing complete up to 6 meter depth or
height (excluding cost of reinforcement and neat finishing)
with centering and shuttering/deshuttering etc. complete for
structure other than water retaining (Below G.L)
(i) RCC Slab 100.00 5520.00 m3
(ii) RCC wall 100.00 6779.00 m3
13 Demolition and disposal of unserviceable materials with all 500.00 609.26 mt3
lead and lift. (i) Unreinforcement cement concrete
14 Demolition of Brick work and stone masonry including 200.00 550.40 mt3
stacking of serviceable materilas and disposal of
unserviceable materials with all lead and lift. (i) In cement
15 Demolition including stacking of serviceable materials and
disposal of unserviceable materials with all lead and lift
i) R.C.C Work 200.00 1057.85 mt3
Signature of Contractor Addl. City Engineer (East Zone)
Name Ahmedabad Municipal Corporation
Schedule of Quantities and Rates
Providing & laying Sewerage Network in Kathwada Gamtal and Tebli Para in East Zone of AMC area
Item Description Qty. Rate Unit Amount
1 Excavation for pipe line trenches etc. for all with shoring and strutting if
required as per required gradient and line including safety provisions
using site rails and stacking excavated stuff including up to all required
lead cleaning the site etc. complete for all lifts and strata as specified. In
all sort of soils and soft murrum
2 Providing bedding incl. ramming, watering, levelling, consolidating etc. 2980.00 329.00 m3
as per standard and instruction of engineer in charge . As above with
required quality Sand brought from Outside including all lead
3 Extra rate over item of excavation of earth if excavation is to be done in 1770.00 18.04 m3
wet condition without resorting to pumping out incl. of bailing out of
4 Shoring or timbering for trench with 50 mm thick planks and suitable 15010.00 71.00 Sq.m
size truts etc. complete.
5 Providing and supplying of Class SN8 Structured Wall polyethelene
Piping systems (Pipe with online/offline coupler and elastomeric sealing
ring) with non-smooth External Annular Corrugated and Smooth
Internal Surfaces (Double Wall) for non-pressure underground
Sewerage & Drainage application as per EN:13476-3 (manufacture
with Anti-roadent Chemical) including all local and central taxes,
transportation, freight charges, octroi, inspection charges, loading,
unloading,conveyance to the departmental stores etc. complete. (ID Dia)
6 Lowering, laying and jointing of class SN 8 structured wall ( External
Annular Corrugated & Smooth Internal surface) Polyethylene Piping
and fittings with the help of coupler ( on line / off line ) attached with
one end of pipes, sliding over the elastomeric sealing rubber ring placed
on the specified valley of the corrugation at the spigot end, lowering the
same into the trench, laying on the lower bedding (constructed at
bottom of trenches) at prescribed gradient, depth & alignment, testing
the water tightness of the joints, ensuring the continuity tests of
specified pipe segments etc. complete as per drawing, specifications &
detailed engineering, including carriage of pipes & fittings from site
stacks to the place of laying etc. as per direction of Engineer-in-charge.
7 Manufacturing, testing, supplying, loading, transporting to worksite,
unloading. RCC pipe in SRC Cement of following class with Socket
and spigot joints as per IS 458 -2021 including EPDM Rubber ring as
per IS 5382-1985 etc. comp. As Directed by Engineering in charge.
Item Description Qty. Rate Unit Amount
8 Lowering, laying and jointing R. C. C. pipes of following diameters in
proper position, grade and alignment at all level as directed by
Engineer-in-charge including conveyance from stores to site of work,
labour, giving hydraulic testing as per ISI code.
R.C.C. PIPES (At any Depth)
9 Providing & Constructing Precast RCC Machinehole in RCC M-40
grade Controlled concrete as per drawing, in OPC including excavation,
80 mm thick P.C.C. in M-15, Reinforcement in TMT-500, PVC Foot
steps, Providing & fixing FRC Manhole frame & cover including inside
epoxy paint complete etc.
For 200 & 250 dia. Pipe (upto 3 m. depth)
(i) 0.9 dia x 2.0m Depth 14.00 36170.00 No
(ii) 0.9 dia - 2.01 to 2.99 m Depth 5.00 8208.00 Rmt.
For 300 & 450 dia. Pipe (upto 4 m. depth)
(i) 1.2 dia x 2.0m Depth 152.00 39704.00 No
10 Constructing Scrapper Slab Type M.H. Chamber of following size incl.
excavation, refilling, brick bats cement concrete (1:5:10) of thickness
C.M., C.C. channel (1:2:4) of thickness 10 C.M., finished 15 mm thick
cement plaster inside & outside (only for shaft) in C.M.1:3, finishing
with cement slurry, P/F 4 mm dia M.S Steel HDPE coated steps 35 cm
c/c at 35 cm staggered Masonry in C.M. 1:5, RCC slab in CC 1 : 1.5 :
3 of thickness 23 C.M, including Cantering & reinforcement (double
jali at 15 C.M c/c both way 12 mm dia.) but excluding the cost of
Manhole seat cover etc. completed (Inside Clear, M.H. length should be
parallel to the flow
<= 1000 mm dia.
11 Providing and fixing F.R.C. MH seat cover incl. carting to the work site 10.00 2146.25 No.
etc. comp. Directed. F.R.C. Extra Heavy Duty (EHD-35) Manhole
Covers & Frames Cover: 728mmø & 100 mm thick circular cover,
35.00MT load design,100 x 2mm MS flat all round,16mm øplain round
bar for lifting the cover & should be fitted with plastic cups.
Frame:560mm ø clear opening, -888 x 888 x 175mm. On the upper
periphery off rame 25x3 mm wide MS flat should be well embed in
concrete to protect the edges off rame. FRCE.H.D.-35 manhole cover &
frame described as above.
12 Providing and casting in situ C.C. in grade M-20 (proportions as per 315.00 5520.00 m3
mix design or as per table9 of IS456 2000 in masses by weigh batching
) using granite, quartzite trap metal of size 6 mm to 20 mm for RCC
work, including scaffolding centering, formwork, needle vibrated
consolidation, curing complete up to 6 meter depth or height (excluding
cost of reinforcement and neat finishing) with centering and
shuttering/deshuttering etc. complete for structure other than water
13 Supplying cutting, bending, binding and placing in position steel as per 19.00 77504.00 MT
plan and design and as per ISS 2502 including cost of steel and binding
wire for reservoirs/structures. Do-deformed (TMT) bars confirming to
relevant IS Fe-500 grade for all diameters.
Item Description Qty. Rate Unit Amount
14 Dismantling of the existing structure including removing and stacking 185.00 294.11 m3
the dismantled materials as and where directed (a) Stone Pavement
15 Providing and Laying of Rubber Moulded Paver Block Grey/Coloured 615.00 501.60 Smt
60 mm thick, M-35 Grade of any size ;shape (Usually Uni-Paver
Blocks) using black trap good quality aggragate of 20 mm nominal size
for footpath,parking areas, service lanes and other areas as mentioned in
the drawing / instruction of engineer in charge. Cost includes
formworks using rubber mould, Rate providing and laying paver blocks
as per required grading and specification. The paver block shall be
mechanically compacted. The work of paving blocks shall be executed
in line and level by skill mason of flooring work only. It should be laid
in such a way that the no cutting of the paver block to be necessary. if
cutting of paver block necessary then it should be cut by machine only
and carting. The finished surface of the paver block shall have
resonably good, plain finished.Paver blocks shall be compacted and
shall be relaid if necessary. Gravel or such type of materials shall not be
allowed for production. Laying on 5 cms thick sand bedding.
16 Extra rate over item of excavation of earth for excavation of asphalt
pavement/RCC of thickness upto 0.2 mt. including demolishing the
asphalt carpet, metal, solling/cutting reinforcement etc. complete with
stacking the material as directed.
a) Upto 0.2 meter thickness (By Manual) 2575.00 72.14 Smt.
17 Extra rate over item of excavation of earth for excavation of asphalt 1105.00 180.36 Smt.
pavement/RCC of thickness upto 0.3 mt. (By any type of breaker
machine of RCC Cutter machine including cost of operator, fuel,
&transportation etc complete).
18 Providing, laying, spreading and compacting graded stone aggregate to 4785.00 1146.95 m3
wet mix macadam specification including premixing the Material with
water at OMC in mechanical mix plant carriage of mixed Material by
tipper to site, laying in uniform layers in subbase / base course on well
prepared surface and compacting with vibratory roller to achieve the
desired density as per MoRTH clause
19 Dismentaling of the existing structure including removing and stacking 5470.00 886.05 m3
the dismentelled materials as and where directed (a) R.C.C Work
20 Construction of 150 mm thick un-reinforced plain cement concrete 18235.00 928.00 Sq.m
pavement with M - 25 grade of concrete including provision of
contraction, construction and longitudinal joints, joint filler, , sealant
primer, joint sealant, finishing to lines and grades as per drawing as per
MoRTH clause 602 over a 100 mm thick WMM with necessary
excavation/loosening and recompacting ground as per respective
MoRTH specification and as directed by engineerin charge
21 Refilling the pipeline trenches incl. ramming, watering, consolidating 13905.00 22.00 m3
desposal of surplus stuff as directed within a radius of 3 km.
22 Demoliton and disposal of unserviceable materials with all lead and lift
i) Unreinforced cement concrete 500.00 609.26 m3
23 Demolition of following including stacking of serviceable material and
disposal of unserviceable materials with all lead and lift
i) Brick Work (Cement Mortar) 500.00 550.40 m3
Item Description Qty. Rate Unit Amount
24 Removing of existing pipeline incl. removal of specials, valves jointing
material including carting and stacking of removed materials from site
of work to the department store as directed excl. excavtion and
refilling.(PVC Pipe)
25 Removing of existing pipeline incl. removal of specials, valves jointing
material including carting and stacking of removed material from site of
work to the department store as directed excl. excavation and refilling.
26 Dismentling C.I. pipes, G.S.W. pipes and A.C. rainwater pipes with 50.00 74.77 Rmt.
fittings and clamps including stacking the materials with all lead and lift
(for any dia. of pipe)
27 Making connection to the ex. M.H. in running sewer incl. Dewatering
and other required machinery etc. of following dia pipe at any
convenient time. All damaged work shall be well repaired as per
instructions etc. complete.
(i) 150 mm to 300 mm dia. pipe 25.00 1352.68 No.
(ii) 400 mm to 600 mm dia. pipe 5.00 2254.46 No.
(iii) 700 mm to 900 mm dia. pipe 5.00 3156.25 No.
28 Dewatering by pumping set of required capacity including temporary 5460.00 18.32 HP/H
platform carting pumping at site and fixing the same in position r.
including all accessories, and fuel and labour etc. complete.
29 Conveyance charge of earth, lime, murrum, building 'rubbish, manual
garbage, sludge, excavated rock, fly ash,'aggregate of any kind etc.
30 Carting and recarting of materials such as murum, earth, kapchi, gravel,
brick bats, kankar, sand, debris etc. from the site to approved location,
including loading, unloading, stacking and spreading etc. complete.
31 Providing and operation dewatering Pump including fuel charges & 100.00 541.07 Shift
operator Charges etc. as directed etc. comp. (Shift for Eight Hour)
(For Each Pump Set, No payment should be allowed for non working
condition of machinery )
Signature of Contractor Addl. City Engineer (East Zone)
Name Ahmedabad Municipal Corporation
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Technical bid.pdf
Technical specification.pdf
Financial bid.pdf
01.Kathwada Sewerage.pdf
02. KATHAWADA TPS117 GAMTAL F.pdf
03. 01 Precast Manhole.bak.pdf
03. 02 Precast Manhole.bak.pdf
03. 03 Precast Manhole.bak.pdf
04. 01 Precast Manhole.bak.pdf
05 01 Scrapper Machine Hole.pdf
05 02 Scrapper Machine Hole.pdf
05 03 Scrapper Machine Hole.pdf
06. 01 Scrapper Machine Hole-1.80m x 1.80m.pdf
06. 02 Scrapper Machine Hole-1.80m x 1.80m.pdf
07. Pipe Trench.pdf
08. Pipe Trench-DWC-Sewerage.pdf
09. Pipe Trench-Rcc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .