Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.4 LAccepted-AOC | 1 | Accepted-AOC Lowest | |
| 2 | 2₹1.5 L+₹10,827.84 (7.92%)Rejected-AOC PALAKEEZHI HOUSE MUNDUR P O PALAKKAD DISTRICT | PALAKKAD | KERALA | 678001 | 2 | Rejected-AOC second |
| Sl No | Description | Qty | Unit | SHAMSUDHEEN .T.U L1 | VASUDEVAN P C L2 |
|---|---|---|---|---|---|
| 1.00Maintenance Work | |||||
| 1.00 | OD6900/2026-2027:Engaging man mazdoor for various works as directed by the departmental officers in charge. | 60 | Day | 887.39 ₹53,243.4 Lowest | 942.58 ₹56,554.8 |
| 1.00 | OD8956/2026-2027:Supplying and stacking Earth filled empty Cement bags | 30 | each | 92.55 ₹2,776.5 Lowest | 98.31 ₹2,949.3 |
| 1.00 | 60.2.1:EARTH WORK FILLING- Supplying contractors own earth including cost of conveyance and royalty and filling (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 10.48 | cum | 598.1 ₹6,271.08 Lowest | 635.3 ₹6,661.12 |
| 1.00 | OD6899/2026-2027:Engaging hydraulic excavator (3D) as per DSR with Driver and Fuel. | 10 | hour | 1,203.81 ₹12,038.1 Lowest | 1,278.68 ₹12,786.8 |
| 1.00 | 50.2.33.5:Cutting branches of trees overhanging above any structures of girth between 40cm to 60cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. | 8 | each | 309.67 ₹2,477.36 Lowest | 328.93 ₹2,631.44 |
| 1.01 | 50.2.33.6:Cutting branches of trees overhanging above any structures of girth between 60cm to 90cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete | 8 | each | 554.3 ₹4,434.4 Lowest | 588.78 ₹4,710.24 |
| 1.01 | 50.2.33.7:Cutting branches of trees overhanging above any structures of girth between 90cm to 120cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. | 8 | each | 753.65 ₹6,029.2 Lowest | 800.53 ₹6,404.24 |
| 1.01 | 50.2.33.8:Cutting branches of trees overhanging above any structures of girth beyond 120cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. | 8 | each | 1,019.87 ₹8,158.96 Lowest | 1,083.3 ₹8,666.4 |
| 1.01 | 2.33.2:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 60 cm girth up to and including 120 cm girth | 3 | each | 2,012.54 ₹6,037.62 Lowest | 2,137.71 ₹6,413.13 |
Tender Value
₹1.7 L
EMD Value
₹4,234
Closing Date
22 Jun 2026, 11:00 amClosed
Assistant Executive Engineer
Head Works Sub-Division Malampuzha Irrigation
This works entails cutting of trees and removing obstructions canals under C B section Malampuzha endangering public life during upcoming monsoon period . During heavy rains, uprooting and falling of trees on Residences, electric line
2026_Irrig_855707_1
IRR/PI/TR/3296/2026_5_1_1/1
Open Tender
Civil Works - Others
Item Rate
90 days
Malampuzha
Please refer Tender Document
5 documents required · 5 mandatory
₹555
Yes
₹4,234
Yes
3 Jul 2026
12 Jun 2026
23 Jun 2026
12 Jun 2026
22 Jun 2026
12 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Maintenance Work | |||||
| 1.001 | OD6900/2026-2027:Engaging man mazdoor for various works as directed by the departmental officers in charge. | - | Day | - | - |
| 1.002 | OD8956/2026-2027:Supplying and stacking Earth filled empty Cement bags | - | each | - | - |
| 1.003 | 60.2.1:EARTH WORK FILLING- Supplying contractors own earth including cost of conveyance and royalty and filling (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 1 | cum | - | - |
| 1.004 | OD6899/2026-2027:Engaging hydraulic excavator (3D) as per DSR with Driver and Fuel. | - | hour | - | - |
| 1.005 | 50.2.33.5:Cutting branches of trees overhanging above any structures of girth between 40cm to 60cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. | - | each | - | - |
| 1.006 | 50.2.33.6:Cutting branches of trees overhanging above any structures of girth between 60cm to 90cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete | - | each | - | - |
| 1.007 | 50.2.33.7:Cutting branches of trees overhanging above any structures of girth between 90cm to 120cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. | - | each | - | - |
| 1.008 | 50.2.33.8:Cutting branches of trees overhanging above any structures of girth beyond 120cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. | - | each | - | - |
| 1.009 | 2.33.2:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 60 cm girth up to and including 120 cm girth | - | each | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1446196.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BD.pdf
Tender Documents • 1.63 MB
BOQ_1446196.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .