Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.3 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | |
| 2 | L2₹2.4 L+₹13,215.06 (5.77%)Admitted-Fee/PreQual/Technical/Finance EDAMATTOM | L2 | Admitted-Fee/PreQual/Technical/Finance | |
| 3 | L3₹2.5 L+₹20,081.95 (8.76%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | Vazhayil Constructions L2 | Saji Abraham L1 | shibu abraham L3 |
|---|---|---|---|---|---|---|
| 1.00Maintenance | ||||||
| 1.00 | OD189985/2026-2027:Engaged man laber | 2 | each | 1,032.4 ₹2,064.8 | 976.12 ₹1,952.24 Lowest | 1,000 ₹2,000 |
| 1.00 | 50.4.1.1:Providing and laying in position cement concrete 1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 12.5 mm nominal size) up to floor five level excluding the cost of centering, shuttering, finishing for leveling coarse of floor and roof etc. | 5.79 | cum | 8,718.28 ₹50,478.84 | 8,243.07 ₹47,727.38 Lowest | 9,000 ₹52,110 |
| 1.00 | 16.78.1:Construction of granular sub- base by Providing close graded Material conforming to specifications, mixing in a mechanical mix plant at OMC, Carriage of mixed material by tippers to work site, for all leads & lifts, spreading in uniform layers of specified thickness with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per specifications and directions of Engineer-in- Charge.With Material conforming to Grade - I ( size range 75 mm to 0.075 mm) having CBR Value- 30 | 9.99 | cum | 3,179.95 ₹31,767.7 | 3,006.61 ₹30,036.03 | 2,950 ₹29,470.5 Lowest |
| 1.00 | OD189980/2026-2027:Providing and laying 100mm thick factory made concrete interlocking block of M 30 grade made by block making machine with strong vibratory compaction of approved size design & shape laid in required colour and pattern over and including 50mm thick compacted bed of coarse sand filling the joints with fine sand etc complete as per the direction of Engineer-in- charge | 133.2 | sqm | 1,186.96 ₹1,58,103.07 | 1,122.25 ₹1,49,483.7 Lowest | 1,244 ₹1,65,700.8 |
Tender Value
₹2.5 L
EMD Value
₹6,353
Closing Date
22 Sept 2026, 4:00 pmClosed
ASSISTANT ENGINEER
AE LID AND EW SECTION MANARACD GP
23/26-27-Providing and laying tiles around the MCF building
2026_LSGD_869179_1
23/AE/LIDANDEW/MNCD/26-27
Open Tender
Civil Works - Roads
Item Rate
180 days
AE LID AND EW SECTION MANARACD GP
Please refer Tender documents.
7 documents required · 7 mandatory
₹560
Yes
₹6,353
Yes
29 Sept 2026
11 Sept 2026
24 Sept 2026
11 Sept 2026
22 Sept 2026
11 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Maintenance | |||||
| 1.001 | OD189985/2026-2027:Engaged man laber | 2 | each | - | - |
| 1.002 | 50.4.1.1:Providing and laying in position cement concrete 1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 12.5 mm nominal size) up to floor five level excluding the cost of centering, shuttering, finishing for leveling coarse of floor and roof etc. | 5.79 | cum | - | - |
| 1.003 | 16.78.1:Construction of granular sub- base by Providing close graded Material conforming to specifications, mixing in a mechanical mix plant at OMC, Carriage of mixed material by tippers to work site, for all leads & lifts, spreading in uniform layers of specified thickness with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per specifications and directions of Engineer-in- Charge.With Material conforming to Grade - I ( size range 75 mm to 0.075 mm) having CBR Value- 30 | 9.99 | cum | - | - |
| 1.004 | OD189980/2026-2027:Providing and laying 100mm thick factory made concrete interlocking block of M 30 grade made by block making machine with strong vibratory compaction of approved size design & shape laid in required colour and pattern over and including 50mm thick compacted bed of coarse sand filling the joints with fine sand etc complete as per the direction of Engineer-in- charge | 133.2 | sqm | - | - |
stage.html
html • 0.02 MB
finance_1472313.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
Declarationbycontractors.pdf
Tender Documents • 0.12 MB
PreliminaryAgreement.pdf
Other Document • 0.02 MB
viewsbd23.pdf
Additional Documents • 1.85 MB
BOQ_1472313.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .