Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹287Admitted-Finance | ₹287 | L1 | Admitted-Finance |
| 2 | L2₹3.0 Cr+₹3.0 Cr (10348332.1%)Admitted-Finance | ₹3.0 Cr+₹3.0 Cr (10348332.1%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S V2 CONSTRUCTIONS L1 | M/S MALIK AND SONS PROP. MOHAMMAD MAQBOOL MALIK L2 |
|---|---|---|---|---|---|
| 1.00 | Design, Construction, successful testing & Commissioning of 0.15 MGD Rapid Sand Filtration Plant incl. Flash mixer, Clorifloclator with Construction of Pump House cum Operator’s Quarter , Pre-settling Tank near existing water Treatment Plant at Manigam , 0.75 lac Gallons RCC Service Reservoir, 0.45 lac Gallon Capacity Clear Water Sump,4No’s Sluice Chambers, Chemical Shed, Chain link fencing around various structures, Anchor /Saddle Blocks along Rising main, levelling terracing , platform cutting , providing Mild steel angle iron Truss to 0.15MGD Water treatment Plant & existing staff quarter at Manigam and Laying fitting of pipe network both DI/GI in Mains , sub Mains & distribution system with Trial run for 06 months after completion of the Construction work and maintenance for a period of five years for all including other Structures like SR, WTP & RWM on TURNKEY BASIS for WSS Whatshun Manigam under JKIDFC including Conducting complete necessary soil tests as required at selected site, as per the Parameters/ Specification mentioned in the tender document”. Architectural aesthetics shall also be kept in consideration to make the structures appealing. (LUP – 2344) | 1 | Complete job | - | - |
| 2.00Maintenance for five years | |||||
| 3.00 | AMC for 1st Year | 1 | No. | - | - |
| 4.00 | AMC for 2nd Year | 1 | No. | - | - |
| 5.00 | AMC for 3rd Year | 1 | No. | - | - |
| 6.00 | AMC for 4th Year | 1 | No. | - | - |
| 7.00 | AMC for 5th Year | 1 | No. | - | - |
Tender Value
₹2.6 Cr
EMD Value
₹5.3 L
Closing Date
25 Jul 2020, 4:00 pmClosed
ER M A ZARGAR EXEN PHE RWSD GBL/SGR
OFFICE OF THE EXEN PHE RWSD GBL/SGR H.Q. CHEKI DUDERHAMA GBL
WSS WHATSHAN MANIGAM (UNDER JKIDFC) FOR FULL DESCRIPTION REFER TO TD/WORK NO 01 OF E NIT NO 09 OF 2020-21 (TURNKEY)
2020_PHE_97202_1
E NIT NO 09/PHED/RWSD/CIVIL OF 2020-21
Open Tender
Civil Works - Water Works
Turn-key
230 days
WATSHAN MANIGAM GANDERBAL
Please refer Tender documents.
7 documents required · 7 mandatory
₹4,000
Yes
EXEN PHE RWSD GBL/SGR
₹5.3 L
Yes
OFFICE OF THE SE HYD CIRCLE SGR/GBL HQ RAJBAGH SGR
18 Sept 2020
23 May 2020
27 Jul 2020
26 May 2020
25 Jul 2020
26 May 2020
10 Jun 2020
Amount
Maintenance for five years
AMC for 1st Year
AMC for 2nd Year
AMC for 3rd Year
AMC for 4th Year
AMC for 5th Year
M/S MALIK AND SONS PROP. MOHAMMAD MAQBOOL MALIK
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.24 MB
Tendernotice_2.pdf
PDF • 4.81 MB
BOQ_184468.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .