Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹58.5 L
EMD Value
₹59,000
Closing Date
12 Nov 2026, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer, Rajkot Irrigation Division, Rajkot.
BHADAR-1 IRRIGATION SCHEME. Drilling of Foundation Drainage holes at Bhadar-1 dam Site
360551
SBD-22 of 2026-27
Open
Civil - All
Works
Rajkot
11 documents required · 11 mandatory
₹2,400
Executive Engineer, Rajkot Irrigation Division Rajkot
₹59,000
28 Oct 2026
28 Oct 2026
28 Oct 2026
12 Nov 2026
28 Oct 2026
120 days
NAME OF WORK :-
Drilling of Foundation Drainage holes at Bhadar-1 dam Site.
BILL OF QUANTITIES (SCHEDULE - B)
(A) Percentage Rate Tender (Upto Rs. 50 Crore)
Item Description of Item Quantity Unit Estimated Rate Amount
No. (with brief specification and reference to book of specifications) In Figure In words
1 Reaming, Cleaning, Redrilling, Flushing foundation Drainage holes 564.00 Rmt. 8500.00 Rupees: Eight
with electrically operated hydraulic feed diamond core drilling Thousand Five
machine & electrical operated high speed Flaxi shaft machine in Hundred Only.
foundation Gallery of dam incl.all (As directed by Engineer-In-
2 Carrying out packer permeability test/ Uplift pressure 222.00 Nos. 4750.00 Rupees: Four
measurement with inflatable packers in 3 mtrs stage at regular Thousand Seven
interval with high pressure pump,pipe accessories, bourden gauge Hundred Fifty Only.
etc in foundation gallery of dam.as per engineer in charge
Rupees: Fifty Eight Lacs Forty Eight Thousand Five Hundred Only.
I/We are willing to carry out the work at …………………………………………………………...% above/below percent (should be written in figure and words) of the
estimated rates mentioned above. The amount of my/our tender works out as under;
*Estimated amount put to tender Rs. ……………… *Estimated amount put to tender Rs. ………………
Deduct : ……… % below Rs. ………………. Add : ……… % above Rs. ……………….
Net : Rs. ……………… Total : Rs. ………………
In words : Rupees ………………………………………………………………………… In words : Rupees………………………………………………………
1 The Contractor shall exhibit a board with detailed specification and details of work as directed by the Engineer-In-Charge for which no extra payment shall be
The labour cess will be deducted as per prevailing rules i.e.1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt.G.R.:PRC-10/2017 Cement Consumption/16/C
Date:11/05/2017 as stated in S.O.R.thereforeinR.C.C.items where there is a change as per actual mix design the cost of difference of cement consumption
have been deducted from the rate of original item at the rate of input rate mentioned in all the tender.
Executive Engineer
Signature of contractor. Rajkot Irrigation Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1 Tender P I to XIV.pdf
2- SBD Drilling of Foundation- Bhadar-1 P 1 to 132.pdf
3 Sch B - Drilling of Foundation - Bhadar-1 P 130 to 133.pdf
Corrigendum -1 Drilling.pdf
CORRIGENDUM
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .