Loading…
Loading…
| # | Company | Offered Item | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹14.1 Cr Extra ordinary Repair of IBB Road in the stretch ID-113 BOP Beltoli, BP No. 2229/1-RI to BOP Hari, BP No. 2233/3-RI(Length-7 km), ID-113 (OP Banderkhub, BP No. 2224/1-RI to BOP NC Para, BP No. 2226/3-RI)(Length 4 km) and ID-114 BOP (From BOP Alindopara BP No. 2257/3-RI to BOP Chaplenchera, BP No. 2262/30-s) (Length 18.00KM) (total Length 29 Kms) in the state of Tripura along Indo Bangladesh Border(IBB)(Re-call) | Extra ordinary Repair of IBB Road in the stretch ID-113 BOP Beltoli, BP No. 2229/1-RI to BOP Hari, BP No. 2233/3-RI(Length-7 km), ID-113 (OP Banderkhub, BP No. 2224/1-RI to BOP NC Para, BP No. 2226/3-RI)(Length 4 km) and ID-114 BOP (From BOP Alindopara BP No. 2257/3-RI to BOP Chaplenchera, BP No. 2262/30-s) (Length 18.00KM) (total Length 29 Kms) in the state of Tripura along Indo Bangladesh Border(IBB)(Re-call) | ₹14.1 Cr | L1 | - |
| 2 | L2₹14.3 CrFinancial bid opened Extra ordinary Repair of IBB Road in the stretch ID-113 BOP Beltoli, BP No. 2229/1-RI to BOP Hari, BP No. 2233/3-RI(Length-7 km), ID-113 (OP Banderkhub, BP No. 2224/1-RI to BOP NC Para, BP No. 2226/3-RI)(Length 4 km) and ID-114 BOP (From BOP Alindopara BP No. 2257/3-RI to BOP Chaplenchera, BP No. 2262/30-s) (Length 18.00KM) (total Length 29 Kms) in the state of Tripura along Indo Bangladesh Border(IBB)(Re-call) | Extra ordinary Repair of IBB Road in the stretch ID-113 BOP Beltoli, BP No. 2229/1-RI to BOP Hari, BP No. 2233/3-RI(Length-7 km), ID-113 (OP Banderkhub, BP No. 2224/1-RI to BOP NC Para, BP No. 2226/3-RI)(Length 4 km) and ID-114 BOP (From BOP Alindopara BP No. 2257/3-RI to BOP Chaplenchera, BP No. 2262/30-s) (Length 18.00KM) (total Length 29 Kms) in the state of Tripura along Indo Bangladesh Border(IBB)(Re-call) | ₹14.3 Cr | L2 | Financial bid opened |
| 3 | - | - | - | - |
| Sl No | Description | Qty | Unit | M/s Surajit Saha L2 | Subash Chandra Malakar L1 |
|---|---|---|---|---|---|
| 1 | As per schedule of quantities
Page- 46 to 48 | - | - | 26.66 ₹14.3 Cr | 24.44 ₹14.1 Cr |
Tender Value
₹11.3 Cr
EMD Value
₹21.3 L
Closing Date
24 Mar 2026, 3:00 pmClosed
EE(C ), BFD-III, Agartala
Executive Engineer
9582749663
Office of The Executive Engineer Border Fencing Division-III
Extra ordinary Repair of IBB Road in the stretch ID-113 BOP Beltoli, BP No. 2229/1-RI to BOP Hari, BP No. 2233/3-RI(Length-7 km), ID-113 (OP Banderkhub, BP No. 2224/1-RI to BOP NC Para, BP No. 2226/3-RI)(Length 4 km) and ID-114 BOP (From BOP Alindopara BP No. 2257/3-RI to BOP Chaplenchera, BP No. 2262/30-s) (Length 18.00KM) (total Length 29 Kms) in the state of Tripura along Indo Bangladesh Border(IBB)(Re-call)
146329
11/NIT/CE/SE/EE/BFD-III/AGT/2025-26 - Recall 1
OPEN
Civil Works - Roads
330 days
West Tripura, Tripura
8 documents required · 8 mandatory
₹21.3 L
Not Applicable
10 Mar 2026
10 Mar 2026
24 Mar 2026
24 Mar 2026
23 Mar 2026
stage.html
html • 0.07 MB
boq_comp_chart.xls
xls
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
11NIT202526RECALL.pdf
document • 1.93 MB
Download all tender documents and submit your bid