Loading…
Loading…
| # | Company | Offered Item | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹14.1 Cr Extra ordinary Repair of IBB Road in the stretch ID-113 BOP Beltoli, BP No. 2229/1-RI to BOP Hari, BP No. 2233/3-RI(Length-7 km), ID-113 (OP Banderkhub, BP No. 2224/1-RI to BOP NC Para, BP No. 2226/3-RI)(Length 4 km) and ID-114 BOP (From BOP Alindopara BP No. 2257/3-RI to BOP Chaplenchera, BP No. 2262/30-s) (Length 18.00KM) (total Length 29 Kms) in the state of Tripura along Indo Bangladesh Border(IBB)(Re-call) | Extra ordinary Repair of IBB Road in the stretch ID-113 BOP Beltoli, BP No. 2229/1-RI to BOP Hari, BP No. 2233/3-RI(Length-7 km), ID-113 (OP Banderkhub, BP No. 2224/1-RI to BOP NC Para, BP No. 2226/3-RI)(Length 4 km) and ID-114 BOP (From BOP Alindopara BP No. 2257/3-RI to BOP Chaplenchera, BP No. 2262/30-s) (Length 18.00KM) (total Length 29 Kms) in the state of Tripura along Indo Bangladesh Border(IBB)(Re-call) | ₹14.1 Cr | L1 | - |
| 2 | L2₹14.3 Cr+₹25.1 L (1.78%)Financial bid opened Extra ordinary Repair of IBB Road in the stretch ID-113 BOP Beltoli, BP No. 2229/1-RI to BOP Hari, BP No. 2233/3-RI(Length-7 km), ID-113 (OP Banderkhub, BP No. 2224/1-RI to BOP NC Para, BP No. 2226/3-RI)(Length 4 km) and ID-114 BOP (From BOP Alindopara BP No. 2257/3-RI to BOP Chaplenchera, BP No. 2262/30-s) (Length 18.00KM) (total Length 29 Kms) in the state of Tripura along Indo Bangladesh Border(IBB)(Re-call) | Extra ordinary Repair of IBB Road in the stretch ID-113 BOP Beltoli, BP No. 2229/1-RI to BOP Hari, BP No. 2233/3-RI(Length-7 km), ID-113 (OP Banderkhub, BP No. 2224/1-RI to BOP NC Para, BP No. 2226/3-RI)(Length 4 km) and ID-114 BOP (From BOP Alindopara BP No. 2257/3-RI to BOP Chaplenchera, BP No. 2262/30-s) (Length 18.00KM) (total Length 29 Kms) in the state of Tripura along Indo Bangladesh Border(IBB)(Re-call) | ₹14.3 Cr+₹25.1 L (1.78%) | L2 | Financial bid opened |
| 3 | - | - | - | - |
| Sl No | Description | Qty | Unit | M/s Surajit Saha L2 | Subash Chandra Malakar L1 |
|---|---|---|---|---|---|
| 1 | As per schedule of quantities
Page- 46 to 48 | - | - | 26.66 ₹14,32,27,929.76 | 24.44 ₹14,07,17,539.71 Lowest |
Tender Value
₹11.3 Cr
EMD Value
₹21.3 L
Closing Date
24 Mar 2026, 3:00 pmClosed
EE(C ), BFD-III, Agartala
Executive Engineer
Office of The Executive Engineer Border Fencing Division-III
Extra ordinary Repair of IBB Road in the stretch ID-113 BOP Beltoli, BP No. 2229/1-RI to BOP Hari, BP No. 2233/3-RI(Length-7 km), ID-113 (OP Banderkhub, BP No. 2224/1-RI to BOP NC Para, BP No. 2226/3-RI)(Length 4 km) and ID-114 BOP (From BOP Alindopara BP No. 2257/3-RI to BOP Chaplenchera, BP No. 2262/30-s) (Length 18.00KM) (total Length 29 Kms) in the state of Tripura along Indo Bangladesh Border(IBB)(Re-call)
146329
11/NIT/CE/SE/EE/BFD-III/AGT/2025-26 - Recall 1
OPEN
Civil Works - Roads
NCB
330 days
West Tripura, Tripura
8 documents required · 8 mandatory
₹21.3 L
Not Applicable
24 Mar 2026
10 Mar 2026
24 Mar 2026
24 Mar 2026
23 Mar 2026
stage.html
html • 0.07 MB
boq_comp_chart.xls
xls
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
11NIT202526RECALL.pdf
document • 1.93 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .