Tender Value
₹38.4 L
EMD Value
₹76,817
Closing Date
1 Sept 2026, 6:00 pm4d left
Executive Engineer RnB kangan
Executive Engineer RnB kangan
Construction of Link road Khanan Nallah to Bonpora via Maqbooza Ahle Islam Phase I
2026_PWDJK_321863_1
ENIT 29
Open Tender
Civil Works
Percentage
90 days
Kangan
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,100
Executive Engineer RnB kangan
₹76,817
22 Aug 2026
22 Aug 2026
2 Sept 2026
22 Aug 2026
1 Sept 2026
22 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Part A (Tree Felling) | - | - | - | - |
| 2 | Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunk and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material. Beyond 30 cm girth upto and including 60 cm girth. | 5 | No. | 379.05 | ₹1,895.25 |
| 3 | Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunk and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material. Beyond 60 cm girth upto and including 120 cm girth. | 5 | No. | 1,683 | ₹8,415 |
| 4 | Part B (Earthwork) | - | - | - | - |
| 5 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil : | 2,339.94 | Cum | 187.3 | ₹4,38,270.76 |
| 6 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m | 459.48 | Cum | 218.4 | ₹1,00,350.43 |
| 7 | Part C (RCC Pipes) | - | - | - | - |
| 8 | Providing & Laying RCC Pipes of 18" dia in proper position incl excavation of trenches, ramming of bottom,dressing of sides providing required cushion over the pipes incl loading, unloading & carriage upto site of work complete. | 14.58 | Rm | 4,000 | ₹58,320 |
| 9 | Part D (B-Wall) | - | - | - | - |
| 10 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil : | 45 | Cum | 187.3 | ₹8,428.5 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.06 MB
BOQ_1076234.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].