Loading…
Loading…
Tender Value
₹47.8 L
EMD Value
₹48,000
Closing Date
17 Jun 2026, 6:00 pm
Executive Engineer, Sujlam Suflam Division No.2 Visnagar
Third Party Inspection And Project Management Consultancy for EPC contract for Tank Filling Pipeline Network For Patan, Saraswati, Harij Taluka Villages Of Patan District Offtaking From Kasara-Dantiwada Pipeline (Ch.5700 mt)
310796
05/2026-2027
Open
Consultancy Services
Mehsana
17 documents required · 17 mandatory
₹1,500
EXECUTIVE ENGINEER SUJALAM SUFALAM DIVISION NO 2 VISNAGAR
₹48,000
2 Jun 2026
2 Jun 2026
2 Jun 2026
17 Jun 2026
2 Jun 2026
Third Party Inspection And Project Management Consultancy for EPC contract for
Tank Filling Pipeline Network For Patan, Saraswati, Harij Taluka Villages Of Patan
District Offtaking From Kasara-Dantiwada Pipeline (Ch.5700 mt)
Item Estimated Particulars of item Estimated Rate Unit Amount
No. quantity In figure Rs. In according to
but may Ps. words estimated
be more quantity
1 1.00 Providing Third Party Rs.47,80,351.00/- Rupees Job Rs.47,80,351.00/-
Inspection Services Forty
including Contract Seven
Management, Progress Lakh
Monitoring, Inspection and
testing of materials,100 %
Check ,verify and certify of
Survey work, Levels, survey Three
books, including checks on Hundred
setting out and completed Fifty One
work,Work records, such as Only
measurement, level,
dimension, as built
drawings and material
testing onsite/offsite,
machineries and
equipment delivery notes..
machineries and
Equipments, Review and
Approval of documents,
Scrutiny with alignment and
with revenue records. Field
verification and
Finalizations of Land
acquisition proposal/ROU
proposal submitted by
contractor. Quality
Surveillance, , Supervision
of Construction,
Measurement Certification
& Settlement of claims and
financial control, Reporting
and Co-ordination, Defect
Correction Supervision, Post
Contract Work etc.
Rupees Forty Seven Lakh Eighty Thousand Three Hundred Fifty One
I / we am/are willing to carry out the work at % above
/ below (Percent should be written in figure and words) of the
estimated rates mentioned above. Amount of my/our tender
works out as under.
Estimated Amount put to tender Estimated Amount put to tender
Deduct % below ` Add % Above `
Net Amount ` Total Amount `
In Words In Words
Note : 1 : All works shall be carried out as per Public Works Department Handbook
and specifications of Division or as directed by supervisory staff.
Note : 2 : The persons of firm submitting the tender should see that the columns in the
schedule are filled up by the Engineer-in-charge of the issue of the from
prior submission of the tender.
Note : 3 : Rates quoted including clearing of site /prior to commencement of work
at its close in all respect and held good for work under all conditions
moisture, weather etc.
Note : 4 : The meaning of abbreviations used in units are as under.
CM-Cubic Meter/SM = Square Meter/RMT = Running Meter No. = Numbers
Signature of the Contractor Executive Engineer
Sujalam Sufalam Division No-2,
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1.Letter Nivida No.5 of 2026-27.pdf
2.Detail Nivida.pdf
3.Nivida 5 of 2026-27 guj and eng.pdf
4.TPI DTP PIPELINE PROJECT R-3.pdf
5.Schedule B.pdf
Download all tender documents and submit your bid