Loading…
Loading…
Tender Value
₹1.4 L
EMD Value
₹2,800
Closing Date
8 Sept 2026, 4:00 pm5d left
EXECUTIVE ENGINEER REW RAJOURI
OFFICE OF THE EXECUTIVE ENGINEER REW RAJOURI
PLEASE REFER NIT
2026_RDPR_322110_12
e-NIT No. 61 REW Rajouri of 2026 Dated 21-08-2026
Open Tender
Civil Works
Percentage
120 days
REW OFFICE RAJOURI
Please refer Tender documents.
2 documents required · 2 mandatory
₹300
REVENUE HEAD
₹2,800
Yes
26 Aug 2026
26 Aug 2026
9 Sept 2026
26 Aug 2026
8 Sept 2026
26 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in bulk excavation by manual means in trenches for foundations, drains, pipes, cable etc. (not exceeding 1.5 in width) and for shafts, wells, cesspits and the like not exceeding 10 Sqm on plan, depth upto 1.5 Mtr including disposal of excavated earth upto 1 Mtr from cutting edge, disposed earth is to be levelled and neatly dressed 30% OR and 70% AKS | 9 | Cum | 479 | ₹4,311 |
| 2 | P/laying 1:1.5:3 mix with cement concrete (Caping) including curing but excluding the cost of centring and shuttering. | 0.5 | cum | 9,821.1 | ₹4,910.55 |
| 3 | Providing and laying Reinforcement of RCC work including supplying , handling ,rehandling, cutting ,filling and cost of pipes all complete. | 80 | kg | 123 | ₹9,840 |
| 4 | (a) P/laying (1:3:6 )mix cement concrete with 80%PCC and 20% stone quntity including curing but excluding the cost of centring and shuttering. | 16.2 | Cum | 5,733.6 | ₹92,884.32 |
| 5 | (b) 20% stone quntity | 5 | cum | 556 | ₹2,780 |
| 6 | centring and shuttring (Form work) of Ordinary timber planks all complete job | 9.7 | Sqm | 286.35 | ₹2,777.6 |
| 7 | Carriage of fine sand/Aggragate from 38 KM by MT and 600 mtr by H/L | 20 | Cum | 850 | ₹17,000 |
| 8 | Carriage of cement /steel from 10 KM by MT and 600 mtr by H/L | 3 | MT | 517.19 | ₹1,551.57 |
| 9 | Add 2% of contigencies | 1 | No | 2,000 | ₹2,000 |
| 10 | Add cost of sign board | 1 | No | 2,000 | ₹2,000 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.91 MB
BOQ_1081391.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].