Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.9 LAccepted-Finance | L1 | Accepted-Finance Bid is L1 | |
| 2 | L2₹4.2 L+₹30,900 (7.89%)Rejected-Finance | L2 | Rejected-Finance Bid is Not L1 | |
| 3 | L3₹4.7 L+₹82,400 (21.1%)Rejected-Finance | L3 | Rejected-Finance Bid is not L1 |
| Sl No | Description | Qty | Unit | Rooj Consultancy Services L1 | Pal Precision Survey L3 | SADHANA CONSULTANT L2 |
|---|---|---|---|---|---|---|
| 1.00 | “Preparation of Detailed Project Report (DPR) and PPT and other necessary field works & calculations, Structural evaluation of Pavement by cutting pit with photograph (and filling of the excavated pit), Conducting traffic census for a continuous period of 7 days (7 x 24 hrs), Axle Load Survey in connection with “KAMARPARA KURMAIL CHINGISPUR Road from 0.00 kmp to 10.300 km, strengthening work including culvert, drain, Paver Block, Embankment protection etc. under Balurghat Highway Sub Division Under Dakshin Dinajpur Highway Division during the year 2026-2027." | 10.3 | Km | 38,000 ₹3,91,400 Lowest | 46,000 ₹4,73,800 | 41,000 ₹4,22,300 |
Tender Value
Refer Docs
EMD Value
₹5,000
Closing Date
17 Jul 2026, 6:55 pmClosed
AE, BHSD
Beltalapark, Balurghat, Dakshin Dinajpur
Preparation of Detailed Project Report DPR and PPT and other necessary field works Axle Load Survey in connection with KAMARPARA KURMAIL CHINGISPUR Road from 0.00 kmp to 10.300 km strengthening work including culvert drain Paver Block etc.....
2026_WBPWD_5016345_1
WBPWRD/AE/BHSD/NIeQ-05/26-27
Open Tender
CIVIL WORKS
Item Rate
Balurghat
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,000
23 Jul 2026
3 Jul 2026
20 Jul 2026
3 Jul 2026
17 Jul 2026
3 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | “Preparation of Detailed Project Report (DPR) and PPT and other necessary field works & calculations, Structural evaluation of Pavement by cutting pit with photograph (and filling of the excavated pit), Conducting traffic census for a continuous period of 7 days (7 x 24 hrs), Axle Load Survey in connection with “KAMARPARA KURMAIL CHINGISPUR Road from 0.00 kmp to 10.300 km, strengthening work including culvert, drain, Paver Block, Embankment protection etc. under Balurghat Highway Sub Division Under Dakshin Dinajpur Highway Division during the year 2026-2027." | - | Km | 100 | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.59 MB
Tendernotice_2.pdf
PDF • 0.31 MB
BOQ_5085748.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .