| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.8 CrAccepted-AOC | ₹9.8 Cr Quoted ₹9.1 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹10.2 CrRejected-Finance 35 WARD NO 02 ISLAMNAGAR DISTT BUDAUN | BUDAUN | UTTAR PRADESH | 110025 | ₹10.2 Cr | L2 | Rejected-Finance BEINGH HEIGHER RATE |
| 3 | L3₹10.4 CrRejected-Finance NAHAR KHAN SARAI BADAUN | BADAUN | BUDAUN | UTTAR PRADESH | ₹10.4 Cr | L3 | Rejected-Finance BEINGH HEIGHER RATE |
| Sl No | Description | Qty | Unit | M/S A B INFRAZONE PRIVATE LIMITED L2 | R H Construction L3 | AMBE INFRAPROJECTS PRIVATE LIMITED L1 |
|---|---|---|---|---|---|---|
| 1.00 | Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and removing of tree roots (which was left after cutting of trees side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m including supply of all meterial T&P, labour and all taxes etc. But excluding GST for proper completion of the work as per direction of Engineer in charge. (Exculding Royalty.) | 11,796.8 | Cum | 57 ₹6.7 L | 59 ₹7.0 L | 60 ₹7.1 L |
| 2.00 | Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. including supply of all meterial T&P, labour and all taxes etc. But excluding GST for proper completion of the work as per direction of Engineer in charge. (Exculding Royalty.) | 17,250.6 | Cum | 126.6 ₹21.8 L | 129 ₹22.3 L | 160 ₹27.6 L |
| 3.00 | Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 including supply of all meterial T&P, labour and all taxes etc. But excluding GST for proper completion of the work as per direction of Engineer in charge. (Exculding Royalty.) | 10,851.6 | Cum | 133 ₹14.4 L | 139 ₹15.1 L | 160 ₹17.4 L |
| 4.00 | Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 including supply of all meterial T&P, labour and all taxes , royalty etc. But excluding GST for proper completion of the work as per direction of Engineer in charge. | 2,638.4 | Cum | 4,326 ₹1.1 Cr | 4,348 ₹1.1 Cr | 3,400 ₹89.7 L |
| 5.00 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. including supply of all meterial T&P, labour and all taxes , royalty etc. But excluding GST for proper completion of the work as per direction of Engineer in charge. | 1,253 | Cum | 4,674 ₹58.6 L | 4,690 ₹58.8 L | 3,800 ₹47.6 L |
| 6.00 | Providing and applying primer coat with SS2 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 to 1.00 kg/sqm using mechanical means.including supply of all meterial T&P, labour and all taxes , ISTP, royalty etc. But excluding GST for proper completion of the work as per direction of Engineer in charge. (Including cost of Emulsion). | 12,530 | cum | 44 ₹5.5 L | 49 ₹6.1 L | 30 ₹3.8 L |
| 7.00 | Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.0 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. including supply of all meterial T&P, labour and all taxes , ISTP, royalty etc. But excluding GST for proper completion of the work as per direction of Engineer in charge. (Including cost of Bitumen). | 524.2 | Cum | 10,277 ₹53.9 L | 10,277 ₹53.9 L | 10,400 ₹54.5 L |
| 8.00 | Providing and applying tack coat with bitumen VG-10 using Bitumen pressure distributor at the rate of 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. including supply of all meterial T&P, labour and all taxes , ISTP, royalty etc. But excluding GST for proper completion of the work as per direction of Engineer in charge. (Including cost of Bitumen). | 69,895 | sqm | 15 ₹10.5 L | 19 ₹13.3 L | 10 ₹7.0 L |
| 9.00 | Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. including supply of all meterial T&P, labour and all taxes , ISTP, royalty etc. But excluding GST for proper completion of the work as per direction of Engineer in charge. (Including cost of Bitumen). | 393.15 | Cum | 10,702 ₹42.1 L | 10,742 ₹42.2 L | 10,900 ₹42.9 L |
| 10.00 | Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder @ 5.2 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects including supply of all meterial T&P, labour and all taxes , ISTP, royalty etc. But excluding GST for proper completion of the work as per direction of Engineer in charge. (Including cost of Bitumen). | 2,868.25 | Cum | 11,850 ₹3.4 Cr | 12,102 ₹3.5 Cr | 11,000 ₹3.2 Cr |
Tender Value
₹10.2 Cr
EMD Value
₹20.6 L
Closing Date
5 Jan 2026, 12:00 pmClosed
S.E.
OFFICE OF SE BLY CIRCLE BLY
WIDENING AND STRENGTHENING WORK IN AONLA BADAUN ROAD(O.D.R.) IN KM. 1.00 TO 8.00 IN DISTT. BAREILLY FIN. YEAR 2025-26(WITH 05 YEARS MAINTENANCE)
2025_CEBLY_1102666_1
12184/453C(E-Tender)- 3/ 2025-26 dated 17-12-2025
Open Tender
Civil Works - Roads
270 days
BAREILLY
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,725
₹20.6 L
OFFICE OF SE BLY CIRCLE BLY
6 Mar 2026
29 Dec 2025
5 Jan 2026
29 Dec 2025
5 Jan 2026
29 Dec 2025
31 Dec 2025
Amount
Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and removing of tree roots (which was left after cutting of trees side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m including supply of all meterial T&P, labour and all taxes etc. But excluding GST for proper completion of the work as per direction of Engineer in charge. (Exculding Royalty.)
Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. including supply of all meterial T&P, labour and all taxes etc. But excluding GST for proper completion of the work as per direction of Engineer in charge. (Exculding Royalty.)
Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 including supply of all meterial T&P, labour and all taxes etc. But excluding GST for proper completion of the work as per direction of Engineer in charge. (Exculding Royalty.)
Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 including supply of all meterial T&P, labour and all taxes , royalty etc. But excluding GST for proper completion of the work as per direction of Engineer in charge.
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. including supply of all meterial T&P, labour and all taxes , royalty etc. But excluding GST for proper completion of the work as per direction of Engineer in charge.
Providing and applying primer coat with SS2 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 to 1.00 kg/sqm using mechanical means.including supply of all meterial T&P, labour and all taxes , ISTP, royalty etc. But excluding GST for proper completion of the work as per direction of Engineer in charge. (Including cost of Emulsion).
Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.0 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. including supply of all meterial T&P, labour and all taxes , ISTP, royalty etc. But excluding GST for proper completion of the work as per direction of Engineer in charge. (Including cost of Bitumen).
Providing and applying tack coat with bitumen VG-10 using Bitumen pressure distributor at the rate of 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. including supply of all meterial T&P, labour and all taxes , ISTP, royalty etc. But excluding GST for proper completion of the work as per direction of Engineer in charge. (Including cost of Bitumen).
Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. including supply of all meterial T&P, labour and all taxes , ISTP, royalty etc. But excluding GST for proper completion of the work as per direction of Engineer in charge. (Including cost of Bitumen).
Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder @ 5.2 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects including supply of all meterial T&P, labour and all taxes , ISTP, royalty etc. But excluding GST for proper completion of the work as per direction of Engineer in charge. (Including cost of Bitumen).
Providing and laying of factory made 80 mm thick Interlocking cement concrete tiles (30mpa) including 25mm thick compacted bed of fine sand compacting and proper embedding/ laying of Interlocking tiles leveling and dressing of surface to required level and slope, filling joints with fine sand including the cost of material, labour T&P etc.required for proper completion of work as directed by Engineer-in-Charge.
Relaying of Interlocking Concrete Block Pavements having thickness 80 mm as per drawings and Technical Specification Clause 1504.
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. (Mechanical Means) including supply of all meterial T&P, labour and all taxes etc. But excluding GST for proper completion of the work as per direction of Engineer in charge. (Exculding Royalty.)
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. including supply of all meterial T&P, labour and all taxes , royalty etc. But excluding GST for proper completion of the work as per direction of Engineer in charge.
Brick Masonry Work in Cement Mortar 1:3 in Foundation complete excluding Pointing and Plastering, as per Drawing and Technical Specifications. including supply of all meterial T&P, labour and all taxes , royalty etc. But excluding GST for proper completion of the work as per direction of Engineer in charge.
PCC Grade M20 using batching plant transit mixer & manual placing including supply of all meterial T&P, labour and all taxes , royalty etc. But excluding GST for proper completion of the work as per direction of Engineer in charge.
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia PVC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications. (SI.No. Ch. 1 - 24)
RCC Grade M25 using batching plant transit mixer & manual placing including supply of all meterial T&P, labour and all taxes , royalty etc. But excluding GST for proper completion of the work as per direction of Engineer in charge.
Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications. But excluding GST for proper completion of the work as per direction of Engineer in charge.
Pointing with cement mortar (1:3 ) on brick work in substructure as per Technical Specifications including supply of all meterial T&P, labour and all taxes , royalty etc. But excluding GST for proper completion of the work as per direction of Engineer in charge.
Providing and laying reinforced cement concrete 1000mm dia NP3 Class Spigot Hume Pipe for culverts on first class bedding of granular material in Single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry including supply of all meterial T&P, labour and all taxes , royalty etc. But excluding GST for proper completion of the work as per direction of Engineer in charge.
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. (For Box Culvert)
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. including supply of all meterial T&P, labour and all taxes , royalty etc. But excluding GST for proper completion of the work as per direction of Engineer in charge. (For Box Culvert)
RCC Grade M30 using batching plant transit mixer & & Concrete pump including supply of all meterial T&P, labour and all taxes , royalty etc. But excluding GST for proper completion of the work as per direction of Engineer in charge.
Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Sub-Structure complete as per Drawing and Technical Specifications. But excluding GST for proper completion of the work as per direction of Engineer in charge. (For Box Culvert)
RCC Grade M25 using batching plant transit mixer & manual placing (Super structure) including supply of all meterial T&P, labour and all taxes , royalty etc. But excluding GST for proper completion of the work as per direction of Engineer in charge.
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications
Providing and laying boulders apron on river bed for protection against scour with stone boulders weighing not less than 40 kg each complete as per drawing and Technical specification including supply of all meterial T&P, labour and all taxes , royalty etc. But excluding GST for proper completion of the work as per direction of Engineer in charge.
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical Specification including supply of all meterial T&P, labour and all taxes , royalty etc. But excluding GST for proper completion of the work as per direction of Engineer in charge.
Dismantling brick work or stone work in lime or cement mortar and including stacking of materials as directed by the Engineer-in-charge within a distance of 60 m (200ft.) (s.i.No.692)
Dismantling reinforced cement concrete or reinforced brick work, including stacking of dismantled materials as directed by the Engineer-in-charge within a distance of 60 m. (s.i.No.694)
M/S A B INFRAZONE PRIVATE LIMITED (BID ID -5786716)
R H Construction (BID ID -5787737)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.39 MB
BOQ_2033186.xls
BOQ • 0.25 MB
05.pdf
Tender Documents • 0.19 MB
SBD1.pdf
Tender Documents • 25.09 MB
SBD2.pdf
Tender Documents • 8.81 MB
ADDENDUM.pdf
Additional Documents • 1.60 MB
Download all tender documents and submit your bid