Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.7 CrAccepted-AOC A 1 1 BKTPP CHP AREA BKTPP BIRBHUM 731104 | BIRBHUM | BIRBHUM | WEST BENGAL | 731104 | L1 | Accepted-AOC L1 Bidder | |
| 2 | L2₹6.1 Cr+₹38.6 L (6.74%)Rejected-AOC 1ST FLOOR CHITRAKOOT 230 A A J C BOSE ROAD KOLKATA 700020 | KOLKATA | KOLKATA | WEST BENGAL | 700020 | L2 | Rejected-AOC L2 Bidder | |
| 3 | L3₹7.2 Cr+₹1.4 Cr (24.9%)Rejected-AOC | L3 | Rejected-AOC L3 Bidder | |
| 4 | Rejected-Technical MUTBABERIA SADAIPUR | SADAIPUR | BIRBHUM | WEST BENGAL | 731104 | - | Rejected-Technical NOT QUALIFIED |
Tender Value
Refer Docs
EMD Value
₹10 L
Closing Date
5 Sept 2020, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
The General Manager,BKTPP, WBPDCL,731104
The General Manager,BKTPP, WBPDCL,731104
ANNUAL RATE CONTRACT FOR COAL UNLOADING FROM WAGONS AT TRACK HOPPER 1 AND 2 AND WAGON TIPPLER OF BKTPP
2020_WBPDC_291904_1
WBPDCL/BKTPP/NIT/E1574/20-21
Open Tender
Support/Maintenance Service
Percentage
550 days
Bakreswar Thermal Power Plant
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹10 L
Yes
ONLINE- The office of Sr.Mgr.(CC), BKTPP, WBPDCL
6 Jan 2021
6 Aug 2020
10 Sept 2020
6 Aug 2020
5 Sept 2020
22 Aug 2020
20 Aug 2020
180 days
Amount
Unloading of Coal from BOBR type rake
Unloading of Coal from BOBR type sick rake
Cleaning of Track Hopper Grating and surrounding area etc. after unloading of one rake
Removal of Oversized Stone having size > 250 mm from Track Hopper Gratings to platform
Unloading of Coal from N-BOX type rake
Cleaning of Wagon Tippler and surrounding area etc. after unloading of one rake
Removal of Oversized Stone having size > 250 mm from Wagon Tippler gratings to platform.
Manual Unloading of N-BOX Wagon of any colliery at Track Hopper – I / II
Cleaning at beneath of tippling table.
Rail Track Cleaning (50-meter rail track from both end of TH and WT)
Cleaning of Platform of Track Hopper & Wagon Tippler by air
Poking at Paddle Feeders and Arch Breaking (for 8 hrs)
Man Power for Power Hammer Operation (for 08 hrs)
Arch Breaking at TH & WT Hopper and other miscellaneous job (for 08 hrs)
IMWB upper area cleaning (Per IMWB).
Loco Pilot for loco operation
02 Nos PWI for inspection of Rail track & super vision of rake and engine movement
Unloading of Cemented type coal wagon
GST as applicable will be paid extra on production of proper documents
AKA Logistics Private Limited
McNally Bharat Engineering Company Limited
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .