| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹26.7 LAccepted-AOC | ₹26.7 L | L1 | Accepted-AOC Lowest 1 |
| 2 | Rejected-Technical NEAR PWD GHAT CHAMOLI 246435 | CHAMOLI | UTTARAKHAND | 246435 | - | - | Rejected-Technical Because bidder is not Lowest 1 |
| 3 | Rejected-Technical | - | - | Rejected-Technical Because bidder is not Lowest 1 |
| 4 | Rejected-Technical | - | - | Rejected-Technical Because bidder is not Lowest 1 |
| Sl No | Description | Qty | Unit | SAI KRIPA TRADERS L4 | MAHIPAL SINGH L3 | Om Sai Infratech L2 | VIJAY KHANTWAL L1 |
|---|---|---|---|---|---|---|---|
| 1.00 | Construction of double Intake chamber having at tapping point of naugudan source,for collection of water including supply of all materials,labour, T&P etc. complete, As per direction of engineer in charge. | 1 | Nos. | 60,000 ₹60,000 | 59,280 ₹59,280 | 65,000 ₹65,000 | 55,281 ₹55,281 Lowest |
| 2.00Providing of all materials, carting from site store to site of work, laying & jointing of G.I. screwed pipes (including supply of all jointing materials like specials, white lead, hemp and oil etc.) in trenches with its cutting, threading and testing of pipe line etc complete. | |||||||
| 2.01 | 15mm dia | 350 | Rm. | 190 ₹66,500 | 180 ₹63,000 | 185 ₹64,750 | 175 ₹61,250 Lowest |
| 2.02 | 20mmdia | 650 | Rm. | 245 ₹1,59,250 | 240 ₹1,56,000 | 240 ₹1,56,000 | 231 ₹1,50,150 Lowest |
| 2.03 | 25mm dia | 4,369 | Rm. | 360 ₹15,72,840 | 340 ₹14,85,460 | 400 ₹17,47,600 | 330 ₹14,41,770 Lowest |
| 2.04 | 32 mm dia | 60 | Rm. | 390 ₹23,400 Lowest | 420 ₹25,200 | 420 ₹25,200 | 410 ₹24,600 |
| 3.00Excavation of earth for pipe line in following strata lift upto 1.5m. Lead upto 30m. Including refilling,watering,ramming of excavated earth into the trenches and removal of surplus earth upto adistance of 60m. Fromtrenches including supply of labour,T&P.etc complete. | |||||||
| 3.01 | Soil mixed with boulder and bajri | 969.38 | Cum | 350 ₹3,39,283 | 380 ₹3,68,364.4 | 150 ₹1,45,407 Lowest | 375 ₹3,63,517.5 |
| 3.02 | Soft rock | 276.97 | Cum | 450 ₹1,24,636.5 | 450 ₹1,24,636.5 | 250 ₹69,242.5 Lowest | 440 ₹1,21,866.8 |
| 4.00Cartage of following sizes of G.M. valves/Air valve upto site of work and fixing the same in water supply lines including cost of valves, specials, labour and T&P complete in all respect but excluding the cost of earth work and construction of chamber. G.M. Gate Valve IS 778 Class - I | |||||||
Tender Value
₹27.8 L
EMD Value
₹75,000
Closing Date
2 May 2023, 5:00 pmClosed
Executive Engineer
Office Of The Executive Engineer, Second Construction Division, Uttarakhand Peyjal Nigam, Kotdwar
Construction of source, CWR laying, jointing and testing of GI pipe line, providing FHTC and other appurtenant works in Bhandar water supply scheme Phase-II along with handing over the work after commissioning to maintenance agency under jjm.
2023_MDPEY_56606_2
34/NIVIDA/04 dt 21-03-2023
Open Tender
Civil Works - Water Works
Item Wise
270 days
Nainidanda
As per tender document
3 documents required · 3 mandatory
₹2,950
Executive Engineer, IInd UKPJN, Kotdwar
₹75,000
Yes
kotdwara
20 Aug 2025
19 Apr 2023
4 May 2023
19 Apr 2023
2 May 2023
21 Apr 2023
19 Apr 2023 - 20 Apr 2023
20 Apr 2023
Amount
Construction of double Intake chamber having at tapping point of naugudan source,for collection of water including supply of all materials,labour, T&P etc. complete, As per direction of engineer in charge.
Providing of all materials, carting from site store to site of work, laying & jointing of G.I. screwed pipes (including supply of all jointing materials like specials, white lead, hemp and oil etc.) in trenches with its cutting, threading and testing of pipe line etc complete.
15mm dia
20mmdia
25mm dia
32 mm dia
Excavation of earth for pipe line in following strata lift upto 1.5m. Lead upto 30m. Including refilling,watering,ramming of excavated earth into the trenches and removal of surplus earth upto adistance of 60m. Fromtrenches including supply of labour,T&P.etc complete.
Soil mixed with boulder and bajri
Soft rock
25mm dia
32mm dia
Supply of all materials, labours, T&P etc and construct gate valve chamber as per type design complete. As per direction of engineer in charge.
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - -All work upto plinth level 1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size).
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - -All work upto plinth level 1:2:4 (1 Cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size).
Supply of all materials, labour, T&P etc and construction of R.C.C. Sump / CWR of following capacities (KL) with M.S. ladder outside & inside of the tank, M.S.M.H. cover with locking arrangement, supply and fixing of chlorinator, cowl,outlet, over flow and wash out pipes with necessary sluice valves, pipe pieces (including cost of materials) flooring 0.60 M wide apron, painting with approved water proofing (apex) / enamal paint, testing, filling water for testing purpose etc. including supply of vertical pipes and specials, assuming bearing capacity as 8MT/M2 . As per direction of engineer in charge.
Making ferrule connection in the existing main of G.I. or any type of pressure mains with saddle piece, service connections, fittings and fixing of G.M. ferrule including tapping the main, but excluding the cost of earth work and cost of all materials.
Ferrule Connection (Labour cost only including index)
Providing and fixing brass bib cock of approved quality
Providing brass ferrule of approved quality
Installing Iron Board (4X3 Feet) Including painting and letter writing at site. As per direction of engineer in charge.
Random Rubble Stone Masonry laid in 1:6 cement and sand mortar, in breast walls, retaining walls, parapets, scuppers, etc. including supply of all material, labour, T&P and royaltiies etc. complete as per drawing and technical specifications.
Random Rubble Stone Masonry laid Dry, in breast walls, retaining walls, etc. including supply of all material, labour, T&P and royaltiies etc. complete as per drawing and technical specifications.
Om Sai Infratech
MAHIPAL SINGH
SAI KRIPA TRADERS
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_70331.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .