Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹4.2 L
EMD Value
₹10,547
Closing Date
27 Oct 2025, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Assistant Executive Engineer
O/o Assistant Executive Engineer Electrical Irrigation Sub Division Aluva
GENERAL-AMC 2025-26 Mamalassery, Kakkad and Kakkad Tail end-Fully Comprehensive Annual Maintenance of LIS Under Electrical Lift Irrigation Section Ramamangalam-General Electrical Work
2025_Irrig_811258_6
PWD/BLDG/10705/RLM/2025-2026
Open Tender
Electrical Works
Item Rate
365 days
Aluva
Please refer Tender documents.
9 documents required · 9 mandatory
₹930
₹10,547
17 Oct 2025
17 Oct 2025
29 Oct 2025
17 Oct 2025
27 Oct 2025
17 Oct 2025
Work Name:GENERAL-AMC 2025-26 Mamalassery, Kakkad and Kakkad Tail end-Fully Comprehensive Annual Maintenance of LIS Under Electrical Lift Irrigation Section Ramamangalam-General Electrical Work
rter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load KOD58454/2025-2026:Lowering down and erecting 30 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load KOD58453/2025-2026: Lowering down and erecting 90 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load KOD58455/2025-2026: Lowering down and erecting 100 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load LOD58456/2025-2026: Lowering down and erecting 110 HP motor, starter and other electrical accessories,( Accessories when necessary ) and erecting the motor on the base plate coupling with pump, erecting the starter regulator TP switch etc in position giving connections checking correct alignment and trial run on full load Consumables and Supplies~OD58437/20
灵汰⁹湡楦汬湩景琠慲獮潦浲牥漠汩漠潧摯焠慵楬祴琠桴牔湡晳牯敭猯慴瑲牥 敲畧慬潴瑥獡爠煥極敲դ楌牴牥䑏㠵㌴⼶〲㔲㈭㈰㨶匉灵汰⁹湡敲敮慷景琠敨䰠䑅䤠摮捩瑡潩慬灭湩瀠湡汥戠慯摲愠瑦牥搠獩慭瑮楬杮琠敨搠浡条摥漠敮<伀㕄㐸㠳㈯㈰ⴵ〲㘲区灵汰⁹湡湉瑳污楬杮㈠‰⁗䕌⁄畔敢氠杩瑨ꈮ䑏㠵㌴⼹〲㔲㈭㈰㨶畓灰祬愠摮爠湥睥污漠桔敲桐獡楤楧慴流敭整捡畣慲祣挠慬獳ㄠ椠慰敮潢牡晡整楤浳湡汴湩桴慤慭敧湯ⱥ䰠愦灭吻漠煥極慶敬瑮洠歡¤伀㕄㐸㈴㈯㈰ⴵ〲㘲区灵汰⁹湡敲敮慷景吠牨敥倠慨敳䐠杩瑩污嘠汯浴瑥牥愠捣牵捡⁹汣獡‱湩瀠湡汥戠慯摲愠瑦牥搠獩慭瑮楬杮琠敨搠浡条摥漠敮♌浡㭰⁔牯䔠畱癩污湥⁴慭敫�䑏㠵㌴⼵〲㔲㈭㈰㨶敒汰捡湩桴慤慭敧敢牡湩Ⱨ猠灵汰⁹湡楦楸杮渠睥椠摮獵牴慩祴数戠污敢牡湩㌶㘱Ⱐ匠䙋⼠䘠䝁漠煥極慶敬瑮畳瑩扡敬映牯ㄠ〱䠠⁐潭潴 異灭猠瑥愠数桴楤敲瑣潩景䐠灥牡浴湥慴瑳晡瑡猠瑩Û伀㕄㐸ㄴ㈯㈰ⴵ〲㘲刺灥慬楣杮琠敨搠浡条摥戠慥楲杮畳灰祬愠摮映硩湩敮⁷湩畤瑳楲污琠灹慢汬戠慥楲杮㘠ㄳ‴䭓⁆ 䅆⁇牯攠畱癩污湥ⱴ猠極慴汢潦〳䠠⁐潭潴 異灭猠瑥愠数桴楤敲瑣潩景䐠灥牡浴湥慴瑳晡瑡猠瑩Ö伀㕄㐸㌴㈯㈰ⴵ〲㘲刺灥慬楣杮琠敨搠浡条摥戠慥楲杮畳灰祬愠摮映硩湩敮⁷湩畤瑳楲污琠灹慢汬戠慥楲杮㘠〳‹䭓⁆ 䅆⁇牯攠畱癩污湥ⱴ猠極慴汢潦瀠浵⁰㔨ⴰ㈱‰偈 獡瀠牥琠敨搠物捥楴湯漠敄慰瑲敭瑮污猠慴晦愠⁴楳整म潍潴䵁陃䑏㠵㘴⼰〲㔲㈭㈰㨶畆汬⁹潃灭敲敨獮癩湁畮污䴠楡瑮湥湡散漠㔠䠠⁐慖畣浵洠瑯牯瀠浵⁰敳⁴⹄⹏⁌瑳牡整挬湯牴汯楬杮攠敬瑣楲慣捡散獳牯敩瑥潣灭敬整映牯愠瀠牥潩景ㄠ′潭瑮獨椠据畬楤杮愠瑴湥楤杮愠汬爠灥楡獲Ⱐ爠捥湯楤楴湯湩桴慤慭敧慰瑲ⱳ爠灥慬楣杮猠慰敲楷桴漠楲楧慮慭敫愠数慳灭敬楤浳湡汴湩湡敲楦瑴湩敲潭楶杮映牯楥湧戠摯敩敲敮慷景朠慬摮瀠捡楫杮Ⱐ朠獡敫⁴慰正湩畲扢牥瀠捡楫杮Ⱐ朠敲獡湩桴敢牡湩瑥獡愠摮眠敨敲畱物摥椠据畬楤杮漠敶桲畡楬杮漠異灭癯牥慨汵湩景琠敨洠瑯牯慭湩整慮据景洠瑯牯琠潨畲桧畯⁴桴䵁⁃数楲摯眠敨癮牥渠捥獥慳祲⠠硥汣摵湩敲楷摮湩⥧爠灥楡獲漠慶捣浵瀠灩楬敮瑳牡整Ⱳ瘠污敶汥捥牴捩污愠捣獥潳楲獥攠捴愠敲畱物摥挠浯汰瑥湩朠潯潷歲湩潣摮瑩潩湩汣摵湩慰湩楴杮琠敨洠瑯牯瀠浵獰瑥戠獡汰瑡污楴敭搠牵湩桴数楲摯漠潣瑮慲瑣愠摮琠敨映畡瑬桳畯摬戠敲瑣晩敩楷桴椠桴楴敭愠汬睯摥⠮潔慴″潍潴獲㈱洠湯桴潦慅档䴠瑯牯⸩䐀祡Ӗ伀㕄㐸ㄶ㈯㈰ⴵ〲㘲›畆汬⁹潃灭敲敨獮癩湁畮污䴠楡瑮湥湡散漠〳䠠⁐煳極牲汥挠条湩畤瑣潩潭潴楷桴猠汰瑩挠獡 湅畳瑣潩異灭猠瑥Ⱐ猠慴瑲牥潣瑮潲汬湩汥捥牴捩污愠捣獥潳楲獥Ⱐ瀠湡汥戠慯摲攬捴挠浯汰瑥潦数楲摯漠㈱洠湯桴湩汣摵湩瑡整摮湩污敲慰物漬敶桲畡楬杮☠浡㭰爠捥湯楤楴湯湩景猠慴瑲牥Ⱐ爠灥慬楣杮漠慤慭敧潣瑮捡獴潮瘠汯⁴敲敬敳挠楯ⱬ漠敶汲慯潣汩敲潣摮瑩潩楮杮愠摮爠晥汩漠汩癯牥慨汵湩景瀠湡汥戠慯摲戠⁹档捥楫杮琠敨眠物潣湮捥楴湯ⱳ挠湯牴汯眠物湩Ⱨ猠牥楶楣杮漠睳瑩档朠慥敲獡爠煥極敲Ɽ爠灥慬楣杮琠敨戠牵潮瑵映獵楬歮ⱳ爠灥楡桴慤慭敧楨杮獥爠灥慬楣杮眠牯潮瑵戠敥楤杮湩汣摵湩慰湩楴杮攠捴敲汰捡湩桴慤慭敧潣灵楬杮戠獵ⱨ愠摮挠畯汰湩潢瑬ⱳ传敶桲畡楬杮愠摮爠捥湯楤楴湯湩桴異灭敳⁴祢爠捥湯楤楴湯湩桴慤慭敧慰瑲敲汰捡湩灳牡獥眠瑩牯杩湩污洠歡獡瀠牥猠浡汰敲潭楶杮映牯楥湧戠摯敩敲敮慷景朠慬摮瀠捡楫杮Ⱐ朠獡敫⁴慰正湩畲扢牥瀠捡楫杮Ⱐ朠敲獡湩桴敢牡湩瑥獡愠摮眠敨敲畱物摥慰湩楴杮琠敨猠慴瑲牥慢敳瀠污整異灭敳⁴湡慭湩慴湩琠敨洠瑯牯瀠浵⁰敳獴猠慴瑲牥Ⱐ攠敬瑣楲慣捡散獳牯敩瑥潣灭敬整椠潧摯眠牯楫杮挠湯楤楴湯愠汬琠浩畤楲杮琠敨瀠牥潩景挠湯牴捡⁴湡桴慦汵獴猠潨汵敢爠捥楴楦摥眠瑩湩琠敨琠浩污潬敷മ☊畱瑯ऻउउउउउउഉ씊䑏㠵㔴⼸〲㔲㈭㈰㨶䘠汵祬䌠浯牰桥湥楳敶䄠湮慵慍湩整慮据景㤠‰偈猠畱物敲慣敧椠摮捵楴湯洠瑯牯眠瑩灳楬⁴慣敳⼠䔠摮猠捵楴湯瀠浵⁰敳⁴瑳牡整Ⱳ挠湯牴汯楬杮攠敬瑣楲慣捡散獳牯敩慰敮潢牡Ɽ瑥潣灭敬整映牯愠瀠牥潩景ㄠ′潭瑮獨椠据畬楤杮愠瑴湥楤杮愠汬爠灥楡獲Ⱐ癯牥慨汵湩愦灭※敲潣摮瑩潩楮杮漠瑳牡整敲汰捡湩景搠浡条摥挠湯慴瑣ⱳ渠潶瑬爠汥獥潣汩癯牥潬摡挠楯ⱬ爠捥湯楤楴湯湩湡敲楦楯ⱬ漠敶桲畡楬杮漠慰敮潢牡祢挠敨正湩桴楷敲挠湯敮瑣潩獮潣瑮潲楷楲杮敳癲捩湩景猠楷捴敧牡獥愠敲畱物摥敲汰捡湩桴畢湲畯⁴畦敳氠湩獫敲慰物琠敨搠浡条摥栠湩敧敲汰捡湩潷湲畯⁴敢摥湩獧椠据畬楤杮瀠楡瑮湩瑥爠灥慬楣杮琠敨搠浡条摥挠畯汰湩畢桳湡潣灵楬杮戠汯獴癏牥慨汵湩湡敲潣摮瑩潩楮杮琠敨瀠浵獰瑥戠⁹敲潣摮瑩潩楮杮琠敨搠浡条摥瀠牡獴Ⱐ爠灥慬楣杮猠慰敲楷桴漠楲楧慮慭敫愠数慳灭敬Ⱐ爠浥癯湩潦敲杩潢楤獥Ⱐ爠湥睥污漠汧湡慰正湩慧歳瑥瀠捡楫杮Ⱐ爠扵敢慰正湩牧慥楳杮琠敨戠慥楲杮攠捴愠湡桷湥爠煥極敲Ɽ瀠楡瑮湩桴瑳牡整Ⱳ戠獡慰瑬ⱥ瀠浵獰瑥愠摮洠楡瑮楡桴潭潴異灭猠瑥瑳牡整汥捥牴捩污愠捣獥潳楲獥攠捴挠浯汰瑥湩朠潯潷歲湩潣摮瑩潩污楴敭搠牵湩桴数楲摯漠潣瑮慲瑣愠摮琠敨映畡瑬桳畯摬戠敲瑣晩敩楷桴椠桴楴敭愠汬睯摥⸠उउउഉ젊䑏㠵㘴⼲〲㔲㈭㈰㨶䘠汵祬䌠浯牰桥湥楳敶䄠湮慵慍湩整慮据景ㄠ〰䠠⁐煳極牲汥挠条湩畤瑣潩潭潴楷桴猠汰瑩挠獡 湅畳瑣潩異灭猠瑥Ⱐ猠慴瑲牥潣瑮潲汬湩汥捥牴捩污愠捣獥潳楲獥Ⱐ瀠湡汥戠慯摲攬捴挠浯汰瑥潦数楲摯漠㈱洠湯桴湩汣摵湩瑡整摮湩污敲慰物漬敶桲畡楬杮☠浡㭰爠捥湯楤楴湯湩景猠慴瑲牥Ⱐ爠灥慬楣杮漠慤慭敧潣瑮捡獴潮瘠汯⁴敲敬敳挠楯ⱬ漠敶汲慯潣汩敲潣摮瑩潩楮杮愠摮爠晥汩漠汩癯牥慨汵湩景瀠湡汥戠慯摲戠⁹档捥楫杮琠敨眠物潣湮捥楴湯ⱳ挠湯牴汯眠物湩Ⱨ猠牥楶楣杮漠睳瑩档朠慥敲獡爠煥極敲Ɽ爠灥慬楣杮琠敨戠牵潮瑵映獵楬歮ⱳ爠灥楡桴慤慭敧楨杮獥爠灥慬楣杮眠牯潮瑵戠敥楤杮湩汣摵湩慰湩楴杮攠捴敲汰捡湩桴慤慭敧潣灵楬杮戠獵ⱨ愠摮挠畯汰湩潢瑬ⱳ传敶桲畡楬杮愠摮爠捥湯楤楴湯湩桴異灭敳⁴祢爠捥湯楤楴湯湩桴慤慭敧慰瑲敲汰捡湩灳牡獥眠瑩牯杩湩污洠歡獡瀠牥猠浡汰敲潭楶杮映牯楥湧戠摯敩敲敮慷景朠慬摮瀠捡楫杮Ⱐ朠獡敫⁴慰正湩畲扢牥瀠捡楫杮Ⱐ朠敲獡湩桴敢牡湩瑥獡愠摮眠敨敲畱物摥慰湩楴杮琠敨猠慴瑲牥慢敳瀠污整異灭敳⁴湡慭湩慴湩琠敨洠瑯牯瀠浵⁰敳獴猠慴瑲牥Ⱐ攠敬瑣楲慣捡散獳牯敩瑥潣灭敬整椠潧摯眠牯楫杮挠湯楤楴湯愠汬琠浩畤楲杮琠敨瀠牥潩景挠湯牴捡⁴湡桴慦汵獴猠潨汵敢爠捥楴楦摥眠瑩湩琠敨琠浩污潬敷മഊऊउउउӽ伀㕄㐸㜵㈯㈰ⴵ〲㘲›畆汬⁹潃灭敲敨獮癩湁畮污䴠楡瑮湥湡散漠㔲䠠⁐汓灩爠湩湩畤瑣潩潭潴眠瑩灳楬⁴慣敳⼠䔠摮猠捵楴湯瀠浵⁰敳⁴瑳牡整Ⱳ挠湯牴汯楬杮攠敬瑣楲慣捡散獳牯敩慰敮潢牡Ɽ瑥潣灭敬整映牯愠瀠牥潩景ㄠ′潭瑮獨椠据畬楤杮愠瑴湥楤杮愠汬爠灥楡獲Ⱐ癯牥慨汵湩愦灭※敲潣摮瑩潩楮杮漠瑳牡整敲汰捡湩景搠浡条摥挠湯慴瑣ⱳ渠潶瑬爠汥獥潣汩癯牥潬摡挠楯ⱬ爠捥湯楤楴湯湩湡敲楦楯ⱬ爠捥湯楤楴湯湩桴汳灩楲杮甠楮⁴獡爠煥極敲Ɽ†癯牥慨汵湩景瀠湡汥戠慯摲戠⁹档捥楫杮琠敨眠物潣湮捥楴湯ⱳ挠湯牴汯眠物湩Ⱨ猠牥楶楣杮漠睳瑩档朠慥敲獡爠煥極敲Ɽ爠灥慬楣杮琠敨戠牵潮瑵映獵楬歮ⱳ爠灥楡桴慤慭敧楨杮獥爠灥慬楣杮眠牯潮瑵戠敥楤杮湩汣摵湩慰湩楴杮攠捴敲汰捡湩桴慤慭敧潣灵楬杮戠獵ⱨ挠牡潢牢獵湡潣灵楬杮戠汯獴癏牥慨汵湩湡敲潣摮瑩潩楮杮琠敨瀠
mpset by reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required, painting the starter, base palte, pumpset and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed . +OD58459/2025-2026: Fully Comprehensive Annual Maintenance of 100 HP Slip ring induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board,etc complete for a period of 12 months including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged contacts, no volt relese coil, overload coil, reconditioning and refil oil, reconditioning the slipring unit as required, overhauling of panel board by checking the wire connections, control wiring, servicing of switch geares as required, replacing the burnout fuse links, repair the damaged hinges replacing wornout beedings including painting etc. replacing the damaged coupling bush, carbon brush and coupling bolts, Overhauling and reconditioning the pumpset by reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required, painting the starter, base palte, pumpset and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed .(Total 2 Motors, 12 months for Each Motor). ÿOD58463/2025-2026: Fully Comprehensive Annual Maintenance of 110 HP Slip ring induction motor with split case / End suction pump set , starter, controlling electrical accessories , panel board,etc complete for a period of 12 months including attending all repairs ,overhauling & reconditioning of starter , replacing of damaged contacts, no volt relese coil, overload coil, reconditioning and refil oil, reconditioning the slipring unit as required, overhauling of panel board by checking the wire connections, control wiring, servicing of switch geares as required, replacing the burnout fuse links, repair the damaged hinges replacing wornout beedings including painting etc. replacing the damaged coupling bush, carbon brush and coupling bolts, Overhauling and reconditioning the pumpset by reconditioning the damaged parts , replacing spares with original make as per sample , removing foreign bodies , renewal of gland packing , gasket packing , rubber packing , greasing the bearing etc as and when required, painting the starter, base palte, pumpset and maintain the motor pump sets starter , electrical accessories etc complete in good working condition all time during the period of contract and the faults should be rectified with in the time allowed . Motor Lifting WorksOD58465/2025-2026: Lifting the 5 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform. OD58466/2025-2026: Lifting the 25 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform. " OD58467/2025-2026: Lifting the 30 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform. " OD58464/2025-2026:Lifting the 90 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform. OD58469/2025-2026:Lifting the 100 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform. OD58468/2025-2026:Lifting the 110 HP motor after disconnecting the wire connection, decoupling the pump, detaching from the base plate, starters, TP switches etc. using chain block, rope, chain etc. and placing them conveniently on the platform. Rewinding of motorsãOD59665/2025-2026: Charges for rewinding the burnt rotor/stator - separate stator and rotor/stator, dismantling the damaged rotor/stator winding from the rotor/stator slots, cleaning the slots neatly, insulating the slots with correct class of insulating paper, winding the rotor/stator with good quality correct gauge of super enameled copper winding wires, closing the rotor/stator slots with fiber wedges, putting proper inter layer insulation, connecting the coil end connection, providing new rotor/stator lead wire, steel binding the overhang with proper insulation at both ends, heating the coils and varnishing with good quality insulation varnish, keep it for drying, reassembling and test running(Less scrap copper)kg·OD59666/2025-2026: Disconnect all electric connections from the motor , decoupling the motor from pump and remove the base bolts from motor and base plate and kept the motor at safe place , checking and testing the stator and rotor winding. power greater than 61 HP and up to 120 HP ,leading the motor to the nearest roadside using manpower, rope , chain, reaper etc. as required without getting damages to the motor, including loading into the vehicle and unloading at workshop for repairs and to and fro Conveyance., resetting the rewound motor, refitting the motor on the base plate, coupling with pump in correct alignment, given wire connection , taking trial run on full load.öOD59667/2025-2026:Disconnect all electric connections from the motor , decoupling the motor from pump and remove the base bolts from motor and base plate and kept the motor at safe place , checking and testing the stator and rotor winding. power up to 10 HP, leading the motor to the nearest roadside using manpower, rope , chain, reaper etc. as required without getting damages to the motor, including loading into the vehicle and unloading at workshop for repairs and to and fro conveyance.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.03 MB
Tendernotice_2.pdf
PDF • 0.10 MB
Tendernotice_3.pdf
PDF • 0.36 MB
BOQ_1354658.xls
BOQ • 0.34 MB
MAKE.pdf
Tender Documents • 0.29 MB
SBD.pdf
Tender Documents • 1.63 MB
NIT.pdf
Tender Documents • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .