Tender ID
Tender Value
₹83.6 L
EMD Value
₹83,600
Closing Date
9 Mar 2026, 6:00 pmClosed
Executive Engineer, Saurashtra Branch Canal Division No.6/1,Morbi
Maintenance & Repair of Morbi Branch Canal between Chainage (-)0.570 km to 15.350 km for Financial Year (2026-27)
277296
05/2025-26
Open
Civil Works - Canal
Works
Morbi
7 documents required · 7 mandatory
₹2,832
Yes
Executive Engineer SBC Dn No. 6/1, Morbi
₹83,600
Yes
16 Feb 2026
16 Feb 2026
16 Feb 2026
9 Mar 2026
16 Feb 2026
BILL OF QUANTITIES
BILL OF QUANTITIES
1. The bill of Quantities shall be read in conjunction with the Instructions to Bidder,
Conditions of Contract, Technical Specifications and Drawings.
2. The quantities given in the Bill of Quantities are estimated and provisional and are
given to provide a common basis for bidding. The basis of payment will be the
actual quantities of work ordered and carried out, as measured by the Contractor
and verified by the Engineer and valued at the rates and prices tendered in the
priced Bill of Quantities, where applicable, and otherwise at such rates and prices
as the Engineer may fix within the terms of the Contract.
3. The rates and prices tendered in the priced Bill of Quantities shall, except in so far
as it is otherwise provided under the Contract, include all constructional plant,
layout, supervision, materials, erection, maintenance, insurance, profit, taxes and
duties, together with all general risks, liabilities and obligations set out or implied
in the Contract.
4. The rates and prices shall be quoted entirely in Indian Currency.
5. A rate or prices shall be entered against each item in the Bill Quantities, whether
quantities are stated or not. The cost of Items against which Contractor has failed
to enter a rate or price shall be deemed to be covered by other rates and prices
entered in the Bill of Quantities (in case of Item rate contract).
6. The whole cost of complying with the provisions of the Contract shall be included
in the items provided in the priced Bill of Quantities, and where no Items are
provided the cost shall be deemed to be distributed among the rates and prices
entered for the related items of Work.
7. General direction and descriptions of work and materials are not necessarily
repeated or summarized in the Bill of Quantities. References to the relevant
sections of the contract documentation shall be made before entering rates or
prices against each item in the Bill of Quantities.
8. The method of completed work of payment shall be in accordance with the
specification for Canal work Road and Bridge works. For building works
specifications for building are to be followed work.
9. Errors will be corrected by the Employer for any arithmetic error pursuant to
Clause 29 of the Instructions to Bidder.
10. Rock is defined as all materials which, in the opinion of the Engineer, required
blasting, or the use of metal wedges and sledgehammers, or the use of compressed
air drilling for its removal, and which cannot be extracted by ripping with a tractor
of at least 150 KW with a single rear mounted heavy duty ripper.
BILL OF QUANTITIES
(A) Percentage Rate Tender (Up to INR 50 Cr.)
Name of Division: Executive Engineer, S.B.C. Dn. No. 6/1, Morbi
Name of Work: - Maintenance & Repair of Morbi Branch Canal between Chainage (-)0.570
km to 15.350 km for Financial Year (2026-27)
Description of Item Quantity Unit Amount in Rs.
Earthwork / Back filling with selected
earth brought from out side borrow area
or from excavated useful material incl.
watering ramming, Compaction with
pneumatic temping and all lead and lift
Dismantalling the C.C. lining including
including disposing off the dismentalled
materials as directed etc. complete.
(A) 10.0 Cm Lining in Bed & Slope
Providing and Laying in position
Controlled Plain/Reinforced Cement
Concrete Lining of M-15 grade in Bed,
Side Slopes and curvature including
batching, mixing, transporting, placing,
vibrating, smooth finishing, membrane
curing (by curing compound only) &
providing bitumen joints at specified
interval incl. minor filling/depression
with murrum / earth / soil as per site
condition to correct profile, watering,
compaction, trimming etc. to provide
(C)10.0 Cm Lining in Bed & Slope
Clearing the silt from canal /drain bed by
digging the same to the required bed
level and gradient including depositing
the excavated earth regularly on spoil
bank for utilizing the same for preparing
the bund after bracking the clods as and
where directed for lead upto 30 mt and
lift as under(A) Depth 3.0 to 6.0 mt
Dewatering for earthen dam and allied
works,foundation areas,pits,trenches etc
incl cost of pumping machineries, pipe Hp-
lines ,labours diesel/electricity/Dgset, Hrs
etc complete. (As per S&K SOR 2024-
25 Chepter 1 Item 30)
Desilting of various structures of canal
and distribution system including
6 depositing the same as directed with all 2751.00 Cum 296.00
lift and lead for canal syphone,air
vent,Turn Out Kundies etc complete.
I/We am/are willing to carry out the work at… ..................... %above/below percent (Should
be written in figures and words) of the estimated rate mentioned above. Amount of my /our
tender works out as under.
Estimated amount put to tender Estimated amount put to tender
Deduct………%below Add………%Above
In words In words
(B) For Item Rate Tender (ForaboveINR50Cr.):
Item Description of Quantity Unit Rate Amount
No Item(with brief
specification and In In
reference to book of figures Words
specifications)
(A)Total Tendered Amount
(B)Rebate on above tendered amount (if any) % (in figure) ……………………………
(C)Net Tendered Amount (A-B) (in figure) …………………………
1 The Contractor shall exhibit a board with detailed specification and details of work as
directed by the Engineer-In-Charge for which no extra payment shall be made.
2 The labour cess will be deducted as per prevailing rules i.e. 1%of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
4 In all P.C.C./R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken
as per vernacular office letter no. 04 of 2024, Dt. 20/01/2024 of The Chief Engineer,
Quality Control (SSNNL) as stated in S.O.R. therefore in P.C.C./R.C.C. items where there is
a change as per Actual mix design the cost of difference of cement consumption have been
deducted from the rate of original item at the rate of input rate (i.e. 5448.53 Rs / MT for
OPC) mentioned in all the tender
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
sbd62abranch.pdf
notice62A.pdf
boq 62a.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .