Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹23.1 Cr
EMD Value
₹23.5 L
Closing Date
30 Jun 2025, 11:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Karnataka Urban Infrastructure Development and Finance Corporation Limited
K S Patil
Construction/Upgradation of Sewerage system for Hospete town under National Green Tribunal Environmental Compensation Fund on DBOT model Call-2
KUIDFC/2025-26/WS/WORK_INDENT61/CALL-2
KUIDFC/2025-26/WS/WORK_INDENT61/CALL-2
Open
Water supply/sewage lines
Two Tender Document System(Two Cover)
KUIDFC Managing Director Office Bengaluru
9 documents required · 9 mandatory
Satisfactorily completed (at least 90% of the contract value), as prime contractor, at least one similar work such as UGD project /STP project/ water supply project/ Irrigation Projects /combined water supply & sewerage project/ combined water supply or Sewerage project with Road/ combined water supply or Sewerage project withLayout works/ combined water supply or Sewerage project with Building works of value not less than Rs 1133.00Lakh
Executed in any one year of the last five years (2019-20 to 2023-24) the following minimum quantities of works:(1)Earthwork excavation in all kinds of strata / embankment / Sub grade by mechanical / manual means46667 cum(2)PCC/RCC concrete1431 cum(3) Reinforcement Steel 21 MT(4) RCC NP3/ DI/ u-PVC/ Stone ware/ MS pipes/DWC/GSW/HDPE pipes of diameter in the range of 150 mm & above diameter22.53 km
The tenderer or his identified sub-contractor should possess required valid electrical license and should have executed similar electrical works totaling to Rs. 34.00 Lakh in any one year
Availability by owning at least 50% of the required/specified key and critical equipment for this work and (b) the remaining 50% can be deployed on lease /hire basis for all works provided, the relevant documents (commitment agreements etc.) for availability for this work are furnished
Liquid assets and/or availability of credit facilities of not less than Rs748.00Lakh(credit lines/letter of credit/Certificates from banks) for meeting the fund requirement etc., (equivalent of the estimated cash flow for 3 months in the peak construction period) in the form of unconditional credit lines/ letter of credit/ certificate from any Nationalized Banks/ Scheduled Banks as per the prescribed format.
Achieved in at least two financial years a minimum financial turnover (in all classes ofcivil engineering construction works only) of Rs 4530.00 Lakh
₹7,500
₹23.5 L
10 Jun 2025
10 Jun 2025
2 Jul 2025
23 Jun 2025
24 Jun 2025
Construction/Upgradation of Sewerage system for Hospete town under National Green Tribunal Environmental Compensation Fund on DBOT model
PART A: Network and HSCs: A-1: New Net works: a) Excavation in all kind of strata at varying depths for pipelines, road restoration and Machine holes. b) Providing, laying and jointing of Sewer Pipeli...
PART B: Construction of new wet well, Rising main and electromechanical works : B-1: Construction of new wet well and pump house: a) Excavation in all kind of strata at varying depths for wet well b) ...
PART C: Electrical works:
a) Providing 11 KV express feeder line & Sub-station, HT line & Sub-station, LT & APFC panel, Solar yard lighting and other required electrical works as per design and as di...
Part-D: O&M of new Wet well:
a)1st Year Operation & Maintenance of new Wet well for 5 years excluding power charges including Deflect Liability Period
Part-D: O&M of new Wet well: b)2nd Year Operation & Maintenance of new Wet well for 5 years excluding power charges including Deflect Liability Period
Part-D: O&M of new Wet well:
c) 3rd Year Operation & Maintenance of new Wet well for 5 years excluding power charges including Deflect Liability Period
Part-D: O&M of new Wet well:
d) 4th Year Operation & Maintenance of new Wet well for 5 years excluding power charges including Deflect Liability Period
Part-D: O&M of new Wet well:
e) 5th Year Operation & Maintenance of new Wet well for 5 years excluding power charges including Deflect Liability Period
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
HOSPET__WETWELL.pdf
Design Document • 0.47 MB
A1 DRAWING NETWORK 2.pdf
Design Document • 1.11 MB
Hospet_SECTION-7_Part-2_Technical_Specifications.docx
Technical Information / Worksheet • 0.90 MB
A2 KEY MAP.pdf
Design Document • 1.93 MB
DTS_Hospet_16042025.docx
Tender Document • 0.46 MB
A1 DRAWING NETWORK 1.pdf
Design Document • 1.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .