Loading…
Loading…
28 results • Latest
Construction of Sewage Treatment Plant (STP) of 3.19 MLD capacity at Chincholi ULB of Kalburgi District along with 5 years Operation & Maintenance (including 1-year Defect liability period) under Swachh Bharat Mission (U)-2.0 fund through Design, Built, Operate and Transfer (DBOT) model.(Package-SBM/KLB-Pkg-9)
Construction of 200KLD Sewage Treatment Plant in Maddur Town under SBM (U)-2.0 fund in DBOT model
Construction of Various Capacities of Sewage Treatment Plant in Kinnigoli and Vittal towns under SBM (U)-2.0 fund in DBOT model. (Package - SBM-MYS-Pkg-1)
Hiring of Vehicle on Monthly basis for Mangalore, Udupi and Puttur for a period of one year
PROVIDING MANPOWER SERVICES (DATA ENTRY OPERATORS AND JUNIOR EXECUTIVE ASSISTANTS) ON OUTSOURCE BASIS TO KUIDFC FOR A PERIOD OF TWO YEARS
Construction of sewerage system in Malavalli town under NGT & SBM (U)-2.0 fund in DBOT model
Construction/upgration of sewerage system in Robertsonpet
Construction of Sewage Treatment Plants (STP) in varying capacities of 4.30 & 6.19 MLD in Shiggaon & Savanur ULBs of Haveri District with 5 years Operation and Maintenance (including 1-year Defect liability period) through Design, Built, Operate and Transfer (DBOT) model. (Package-SBM/BGM-Pkg-4)
Construction of Sewage Treatment Plants (STP) in varying capacities of 3.12 & 9.60 MLD in Yellapura & Sirsi ULBs of Uttra Kannada District with 5 years Operation and Maintenance (including 1-year Defect liability period) through Design, Built, Operate and Transfer (DBOT) model. (Package-SBM/BGM-Pkg-3)
Providing 6(Six) No. of Outsourced Manpower Service - Office Boy, House keeping & Security Guards service for the period of One Year
Construction of Sewage Treatment Plants (STP) of varying capacities of 1.83 to 3.78 MLD at Maski, Turavihala & Balaganur ULBs of Raichur District along with 5 years Operation & Maintenance (including 1-year Defect liability period) under Swachh Bharat Mission (U)-2.0 fund through Design, Built, Operate and Transfer (DBOT) model. (Package SBM/KLB/Pkg-14).
HIRING OF LIGHT COMMERCIAL PASSENGER VEHICLES (YELLOW BOARD) ON MONTHLY BASIS FOR A PERIOD OF TWO YEARS
Office boy services
Providing Comprehensive Annual Maintenance of HVAC (Heat Ventilation and Air - Conditioning) System for a period of 3 years Includes manpower, spare parts, equipment, tools, preventive, incidental and continues maintenance including any other and statutory requirements of all the equipment
Construction of Various Capacities of Sewage Treatment Plant in Arkalgud & Channarayapatna towns SBM(U) 2.0 fund in DBOT model (Package SBM-MYS-Pkg-4)
Construction of Sewerage Systems in Kanakapura City under NGT and SBM (U)-2.0 fund and Ramanagara City under NGT fund in DBOT model.
Construction of Sewage Treatment Plants (STPs) of capacities 4.80 mld & 2.71 ml at Karatagi & Kanakagiri ULBs of Koppal District along with 5 years Operation & Maintenance (including 1year Defect liability period) under Swachh Bharat Mission (U)-2.0 fund through Design, Built, Operate and Transfer (DBOT) model. (Package SBM/KLB/Pkg-11)
Construction of Various Capacities of Sewage Treatment Plant in Belur & Sakleshpura towns under SBM (U)-2.0 fund in DBOT model (Package SBM-MYS-Pkg-2)
Construction of Various Capacities of Sewage Treatment Plant in Bantwal & Kundapura towns under SBM (U)-2.0 fund in DBOT model (Package SBM-MYS-Pkg-5)
Construction of Various Capacities of Sewage Treatment Plant in Hanur, Kushalnagar & Virajpet towns under SBM (U)-2.0 fund in DBOT model (Package SBM-MYS-Pkg-3)
Construction of 3.50 MLD Sewage Treatment Plant in Birur town under SBM (U)-2.0 fund in DBOT model
Construction of Sewage Systems in Sagar (Phase-2) & Hosanagar towns along with 5 years Operation & Maintenance (including 1-year Defect liability period) under NGT Environmental & Compensation and SBM (U)-2.0 fund through Design, Built, Operate and Transfer (DBOT) model (Package SBM-BLR-Pkg-6)
Construction of 8.61 MLD Sewage Treatment Plant in Hiriyur town along with 5 years Operation & Maintenance (including 1-year Defect liability period) under SBM (U)-2.0 fund through Design, Built, Operate and Transfer (DBOT) model
Hiring of Housekeeping cum Office Attenders, Gardner Service for a period of two years from the reputed Manpower Agency
Construction of sewerage system in Tarikere town under NGT and SBM (U)-2.0 fund in DBOT model
Construction of Sewage Treatment Plants of 1.73 MLD in Soraba, Jog Kargal Towns in Shivamogga Dist. along with 5 years Operation & Maintenance (including 1-year Defect liability period) under Swachh Bharat Mission (U)-2.0 fund through Design, Built, Operate and Transfer (DBOT) model
Hiring of of an Agency for availing the services of Security Supervisor, Security Guard and Driver for a period of two years.
Comprehensive Annual Maintenance of 3 Nos Passenger Lifts of 13 persons / 884Kgs capacity for 3 years at Nagarabhivruddhi Bhavana KUIDFC, Indiranagar Bangalore-38