Loading…
Loading…
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹4.5 Craccepted-aoc | ₹4.5 Cr | accepted-aoc |
Tender Value
₹4.3 Cr
EMD Value
₹6.5 L
Closing Date
25 May 2026, 5:30 pmClosed
Karnataka Urban Infrastructure Development and Finance Corporation Limited
KS Patil
Construction of Sewage Treatment Plant (STP) of 3.19 MLD capacity at Chincholi ULB of Kalburgi District along with 5 years Operation & Maintenance (including 1-year Defect liability period) under Swachh Bharat Mission (U)-2.0 fund through Design, Built, Operate and Transfer (DBOT) model.(Package-SBM/KLB-Pkg-9)
KUIDFC/2025-26/WT/WORK_INDENT122/CALL-3
KUIDFC/2025-26/WT/WORK_INDENT122/CALL-3
Open
Water /sewage treatment tanks
Two Tender Document System(Two Cover)
KUIDFC Managing Director Office Bengaluru
₹5,000
₹6.5 L
19 Sept 2026
16 May 2026
27 May 2026
20 May 2026
20 May 2026
Construction of Sewage Treatment Plant (STP) of 3.19 MLD capacity at Chincholi ULB of Kalburgi District along with 5 years Operation & Maintenance (including 1-year Defect liability period) under Swachh Bharat Mission (U)-2.0 fund through Design, Built, Operate and Transfer (DBOT) model.(Package-SBM/KLB-Pkg-9)
PART A: Construction of CAMUS/SBT Technology Sewage Treatment Plant including Electro mechanical works at Chincholi ULB of Kalburgi District: Design, supply, construction, installation, testing & comm...
PART B: Operation & Maintenance of the facility: Operation & Maintenance of Sewage Treatment Plant (STP) and all other supporting facilities/Infrastructure works built up under the package contract fo...
PART B-Operation & Maintenance of Sewage Treatment Plant (STP) and all other supporting facilities/ Infrastructure works built up under the package contract for 5 years excluding power charges, but in...
PART B: Operation & Maintenance of Sewage Treatment Plant (STP) and all other supporting facilities/ Infrastructure works built up under the package contract for 5 years excluding power charges, but i...
PART B: Operation & Maintenance of Sewage Treatment Plant (STP) and all other supporting facilities/ Infrastructure works built up under the package contract for 5 years excluding power charges, but i...
PART B:Operation & Maintenance of Sewage Treatment Plant (STP) and all other supporting facilities/ Infrastructure works built up under the package contract for 5 years excluding power charges, but in...
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
Chincholli Profile.pdf
Others - Drawings • 0.53 MB
Chincholli-Model.pdf
Others - Drawings • 4.98 MB
DTS_Pkg-9.docx
Tender Document • 2.04 MB
Chincholli Hydraulic Flow Daigram.pdf
Others - Drawings • 1.11 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .