Tender Value
₹12.7 Cr
EMD Value
₹13 L
Closing Date
9 Jun 2026, 11:00 pm2d left
Karnataka Urban Infrastructure Development and Finance Corporation Limited
Construction of Sewage Treatment Plants (STP) of varying capacities of 1.83 to 3.78 MLD at Maski, Turavihala & Balaganur ULBs of Raichur District along with 5 years Operation & Maintenance (including 1-year Defect liability period) under Swachh Bharat Mission (U)-2.0 fund through Design, Built, Operate and Transfer (DBOT) model. (Package SBM/KLB/Pkg-14).
302682
KUIDFC/2026-27/WT/WORK_INDENT131/CALL-2
Open
Water /sewage treatment tanks
KUIDFC Managing Director Office Bengaluru
9 documents required · 9 mandatory
Satisfactorily completed (at least 90% of the contract value), as prime contractor, at least one similar work such as UGD project /STP project/water supply project/Irrigation Projects /combined water supply & sewerage project/combined water supply or Sewerage project with Road/combined water supply or Sewerage project with Layout works/combined water supply or Sewerage project with Building works of value not less than Rs 637.00Lakh
Executed in any one year of the last five years (2021-22 to 2025-26) the following minimum quantities of works:(1)Earthwork excavation in all kinds of strata / embankment / Sub grade by mechanical / manual means-6252 cum(2)PCC/RCC concrete-2782cum (3) Reinforcement Steel-133 MT
The tenderer or his identified sub-contractor should possess required valid electrical license and should have executed similar electrical works totaling to Rs. 91 Lakh in any one year
The tenderer or his identified subcontractor should possess experience in Construction of SBR/FAL/HAAF/CAMUS/NEBR/ETP/equivalent Type STP/WTP with minimum of 1.30 MLD Capacity in last five years in single work
Availability by owning at least 50% of the required/specified key and critical equipment for this work and (b) the remaining 50% can be deployed on lease /hire basis for all works provided, the relevant documents (commitment agreements etc.) for availability for this work are furnished
Liquid assets and/or availability of credit facilities of not less than Rs 420.00 Lakh (credit lines /letter of credit/Certificates from banks) for meeting the fund requirement etc., (equivalent of the estimated cash flow for 3 months in the peak construction period) in the form of unconditional credit lines/ letter of credit/ certificate from any Nationalized Banks/ Scheduled Banks as per the prescribed format
Achieved in at least two financial years a minimum financial turnover (in all classes of civil engineering construction works only) of Individual- Rs 2545.00 Lakh Joint Venture- Lead Member- Not less than Rs.1297.95 Lakh
₹7,500
₹13 L
1 Jun 2026
1 Jun 2026
11 Jun 2026
4 Jun 2026
4 Jun 2026
Construction of Sewage Treatment Plants (STP) of varying capacities of 1.83 to 3.78 MLD at Maski, Turavihala & Balaganur ULBs of Raichur District along with 5 years Operation & Maintenance (including 1-year Defect liability period) under Swachh Bharat Mission (U)-2.0 fund through Design, Built, Operate and Transfer (DBOT) model. (Package SBM/KLB/Pkg-14).
PART A: Construction of 1 Nos of SBT/CAMUS Technology Sewage Treatment Plants including Electro mechanical works at Maski ULBs of Raichur District: a) Design, supply, construction, installation, testi...
PART A: Construction of 1 Nos of SBT/CAMUS Technology Sewage Treatment Plants including Electro mechanical works at Balaganur ULBs of Raichur District: a) Design, supply, construction, installation, t...
PART A: Construction of 1 Nos of SBT/CAMUS Technology Sewage Treatment Plants including Electro mechanical works at Turavihala ULBs of Raichur District: a) Design, supply, construction, installation, ...
PART B: Operation & Maintenance of the facility: Operation & Maintenance of Sewage Treatment Plants (STPs) and all other supporting facilities/Infrastructure works built up under the package contract ...
PART B: Operation & Maintenance of the facility: Operation & Maintenance of Sewage Treatment Plants (STPs) and all other supporting facilities/Infrastructure works built up under the package contract ...
PART B: Operation & Maintenance of the facility: Operation & Maintenance of Sewage Treatment Plants (STPs) and all other supporting facilities/Infrastructure works built up under the package contract ...
PART B: Operation & Maintenance of the facility: Operation & Maintenance of Sewage Treatment Plants (STPs) and all other supporting facilities/Infrastructure works built up under the package contract ...
PART B: Operation & Maintenance of the facility: Operation & Maintenance of Sewage Treatment Plants (STPs) and all other supporting facilities/Infrastructure works built up under the package contract ...
PART B: Operation & Maintenance of the facility: Operation & Maintenance of Sewage Treatment Plants (STPs) and all other supporting facilities/Infrastructure works built up under the package contract ...
PART B: Operation & Maintenance of the facility: Operation & Maintenance of Sewage Treatment Plants (STPs) and all other supporting facilities/Infrastructure works built up under the package contract ...
PART B: Operation & Maintenance of the facility: Operation & Maintenance of Sewage Treatment Plants (STPs) and all other supporting facilities/Infrastructure works built up under the package contract ...
PART B: Operation & Maintenance of the facility: Operation & Maintenance of Sewage Treatment Plants (STPs) and all other supporting facilities/Infrastructure works built up under the package contract ...
PART B: Operation & Maintenance of the facility: Operation & Maintenance of Sewage Treatment Plants (STPs) and all other supporting facilities/Infrastructure works built up under the package contract ...
PART B: Operation & Maintenance of the facility: Operation & Maintenance of Sewage Treatment Plants (STPs) and all other supporting facilities/Infrastructure works built up under the package contract ...
PART B: Operation & Maintenance of the facility: Operation & Maintenance of Sewage Treatment Plants (STPs) and all other supporting facilities/Infrastructure works built up under the package contract ...
PART B: Operation & Maintenance of the facility: Operation & Maintenance of Sewage Treatment Plants (STPs) and all other supporting facilities/Infrastructure works built up under the package contract ...
PART B: Operation & Maintenance of the facility: Operation & Maintenance of Sewage Treatment Plants (STPs) and all other supporting facilities/Infrastructure works built up under the package contract ...
PART B: Operation & Maintenance of the facility: Operation & Maintenance of Sewage Treatment Plants (STPs) and all other supporting facilities/Infrastructure works built up under the package contract ...
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
Maski.zip
Design Document • 8.93 MB
Balaganur.zip
Design Document • 7.06 MB
DTS_Pkg-14_MTB.docx
Tender Document • 2.12 MB
Turvihal.zip
Design Document • 8.28 MB
Download all tender documents and submit your bid