Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Opening company profile
Loading company metrics, contact preview, and tender history.
Public records across all portals
Design manufacturing supply errection testing & commissioning of 0.047or more cumecs discharge for Hoskera melina kere of capacity 6.5 Mcft for filling in 90 days twelve hours run by lifting water from SBC main canal at Ch23.100 Km consisting of RCC sump pump house MS raising main for 2.50 Km length of required diameter and 5mm thickness and one coat of 40 micron thick zinc rich epoxy primer paint and 3 coats of 100 micron thick each coat coal tar epoxy paint for inner surface and one coat of 40 micron thick zinc rich epoxy primer paint and two coat of 100 micron thick each coat coal tar epoxy paint for outer surface Intake pipe of RCC NP3 pipe of 600 mm dia with RCC head wall and control gate at canal side pumping machinery and delivery chamber RCC 2 numbers of submerssible pumps each carrying discharge capacity of 0.042 or more with pump head of arround 30 meters including pressure gauge level gauge delivery pipes with butterfly valves nonreturn valves scour valves kinetic air valves pannel boardstar delta starter earthings LTcapacitors to improve power factor UG cable from Transformer to motors starters capacitors obtaining necessary approval from GESCOM and other governement agencies for commssioning Manifold Electrical cables of1amps/sqmm current density complete asper specification and as directed by the Engineer incharge including operation and maintenance for a period of five years on Turnkey basis and Including Bund strengthing , Bund pitching works for for Hosekera meline kere on Turnkey basis
Design manufacturing supply errection testing & commissioning of 0.047or more cumecs discharge for Hoskera melina kere of capacity 6.5 Mcft for filling in 90 days twelve hours run by lifting water from SBC main canal at Ch23.100 Km consisting of RCC sump pump house MS raising main for 2.50 Km length of required diameter and 5mm thickness and one coat of 40 micron thick zinc rich epoxy primer paint and 3 coats of 100 micron thick each coat coal tar epoxy paint for inner surface and one coat of 40 micron thick zinc rich epoxy primer paint and two coat of 100 micron thick each coat coal tar epoxy paint for outer surface Intake pipe of RCC NP3 pipe of 600 mm dia with RCC head wall and control gate at canal side pumping machinery and delivery chamber RCC 2 numbers of submerssible pumps each carrying discharge capacity of 0.042 or more with pump head of arround 30 meters including pressure gauge level gauge delivery pipes with butterfly valves nonreturn valves scour valves kinetic air valves pannel boardstar delta starter earthings LTcapacitors to improve power factor UG cable from Transformer to motors starters capacitors obtaining necessary approval from GESCOM and other governement agencies for commssioning Manifold Electrical cables of1amps/sqmm current density complete asper specification and as directed by the Engineer incharge including operation and maintenance for a period of five years on Turnkey basis and Including Bund strengthing , Bund pitching works for for Hosekera meline kere on Turnkey basis
5 more tenders are hidden. Create a free account to unlock the full tender history, filters, and exports.
This profile is built from what portals disclose publicly. Since several states never release bidder lists or quoted prices, it likely understates the company’s true footprint. A tender is counted as won when the company either received the award or stood L1 at financial bid opening, even if the formal award is still pending. TenderKart compiles these public records independently and has no association with any government portal, buyer, or bidder.