₹21.6 Cr
EMD Value
₹22 L
Closing Date
27 Feb 2026, 11:00 pmClosed
Karnataka Urban Infrastructure Development and Finance Corporation Limited
Construction of Sewage Treatment Plants (STP) of varying capacities of 2.34 to 2.79 MLD at Kamatagi, Shirur, Belagali and Lokapur ULBs of Bagalkot District and varying capacities of 0.60 to 2.65 MLD at Thikota, Managuli & Devarahipparagi ULBs of Vijayapura District along with 5 years Operation & Maintenance (including 1-year Defect liability period) under Swachh Bharat Mission (U)-2.0 fund through Design, Built, Operate and Transfer (DBOT) model. (Package- SBM-BGM-Pkg-7)
KUIDFC/2025-26/WT/WORK_INDENT100/CALL-2
KUIDFC/2025-26/WT/WORK_INDENT100/CALL-2
Open
Water /sewage treatment tanks
KUIDFC Task Manager UWM Bengaluru
5 documents required · 5 mandatory
3.2 c) Executed in any one year of the last five years (2020-21 to 2024-25) the following minimum quantities of works.1. Earthwork excavation in all kinds of strata/ embankment/Sub grade by mechanical/manual means 14346 cum 2. PCC/RCC concrete-4332 cum 3. Reinforcement Steel-179 MT. If the bid is submitted as joint venture, then any one partner/jointly should meet the requirement in the same financial year
3.2 d) The tenderer or his identified sub-contractor should possess required valid electrical license and should have executed similar electrical works totaling to Rs. 110.00 Lakh in any one year. If the bid is submitted as joint venture, then any one partner should meet the requirement
3.2 e) The tenderer or his identified subcontractor should possess experience in Construction of minimum of HAAF/CAMUS/NEBR/equivalent Type STP/WTP with minimum 1.25 MLD Capacity in last five years. If the bid is submitted as joint venture, then any one partner should meet the requirement
3.2 b) Satisfactorily completed (at least 90% of the contract value), as prime contractor, at least one similar work such as UGD project /STP project/ water supply project/ Irrigation Projects /combined water supply & sewerage project/ combined water supply or Sewerage project with Road/ combined water supply or Sewerage project with Layout works/ combined water supply or Sewerage project with Building works of value not less than Rs.1078.00 Lakh. If the bid is submitted as joint venture, then any one partner should meet the requirement.
3.3 a) availability by owning at least 50% of the required/specified key and critical equipment for this work and (b) the remaining 50% can be deployed on lease /hire basis for all works provided, the relevant documents (commitment agreements etc.) for availability for this work are furnished.1.Excavators-Owned-2,Hired-2Total-4, 2.Tippers-Owned-4,Hired-3Total-7, 3.Self-loading Concrete mixer-Owned-4,Hired-3Total-7
3.2 a) Achieved in at least two financial years a minimum financial turnover (in all classes of civil engineering construction works only) of Rs.4312.00 Lakh. If the bid is submitted as JV, then the requirement of minimum financial turnover shall be considered on the basis of combined resources. The lead partner should have an annual financial turnover of not less than 51% of total turnover indicated above in any two financial years during last 5 financial years (2020-21 to 2024-25). All document/certificates issued by a Charted Accountant should have a UDIN (unique document Identification Number) generated through the ICAI (The Institute of chartered Accountants of India) Portal. Certificate without UDIN the documents uploaded will be considered and treated as invalid document Note: In case of JV, Joint venture partnership deed shall be submitted as per section 10 format for Joint Venture along with the other documents through KPP Portal 1. Individual Rs. 4312.00 Lakh 2. Joint Venture-Lead Member Not less than Rs.2199.12 Lakh
3.3 b) Liquid assets and/or availability of credit facilities of not less than Rs.712.00 Lakh (credit lines/letter of credit/Certificates from banks) for meeting the fund requirement etc., (equivalent of the estimated cash flow for 3 months in the peak construction period) in the form of unconditional credit lines/ letter of credit/ certificate from any Nationalized Banks/ Scheduled Banks, Karnataka, India as per the format below. If the bid is submitted as joint venture, then any one partner should meet the requirement
₹7,500
₹22 L
16 Feb 2026
16 Feb 2026
2 Mar 2026
19 Feb 2026
19 Feb 2026
Construction of Sewage Treatment Plants (STP) of varying capacities of 2.34 to 2.79 MLD at Kamatagi, Shirur, Belagali and Lokapur ULBs of Bagalkot District and varying capacities of 0.60 to 2.65 MLD at Thikota, Managuli & Devarahipparagi ULBs of Vijayapura District along with 5 years Operation & Maintenance (including 1-year Defect liability period) under Swachh Bharat Mission (U)-2.0 fund through Design, Built, Operate and Transfer (DBOT) model. (Package- SBM-BGM-Pkg-7)
PART A: Construction of 3 Nos of HAAF (Hybrid Anaerobic-Aerobic-Floating wetlands) Technology Sewage Treatment Plants including Electro mechanical works at Belagali ULB of Bagalkot District and Devara...
PART A: Construction of 1 Nos of HAAF (Hybrid Anaerobic-Aerobic-Floating wetlands) Technology Sewage Treatment Plants including Electro mechanical works at Belagali ULB of Bagalkot District and Devara...
PART A: Construction of 1 Nos of HAAF (Hybrid Anaerobic-Aerobic-Floating wetlands) Technology Sewage Treatment Plants including Electro mechanical works at Belagali ULB of Bagalkot District and Devara...
PART B :Construction of 1 Nos of CAMUS/SBT Technology Sewage Treatment Plants including Electro mechanical works at Shirur ULBs of Bagalkot District a) Design, supply, construction, installation, tes...
PART B :Construction of 1 Nos of CAMUS/SBT Technology Sewage Treatment Plants including Electro mechanical works at Kamatagi ULBs of Bagalkot District a) Design, supply, construction, installation, t...
PART B :Construction of 1 Nos of CAMUS/SBT Technology Sewage Treatment Plants including Electro mechanical works at Thikota ULB of Vijayapura District:
a) Design, supply, construction, installation, ...
PART B :Construction of 1 Nos of CAMUS/SBT Technology Sewage Treatment Plants including Electro mechanical works at Lokapur ULBs of Bagalkot District
a) Design, supply, construction, installation, t...
PART C: Operation & Maintenance of the facility:
Operation & Maintenance of Sewage Treatment Plants (STPs) and all other supporting facilities/ Infrastructure works built up under the package contrac...
PART C: Operation & Maintenance of the facility:
Operation & Maintenance of Sewage Treatment Plants (STPs) and all other supporting facilities/ Infrastructure works built up under the package contrac...
PART C: Operation & Maintenance of the facility:
Operation & Maintenance of Sewage Treatment Plants (STPs) and all other supporting facilities/ Infrastructure works built up under the package contrac...
PART C: Operation & Maintenance of the facility:
Operation & Maintenance of Sewage Treatment Plants (STPs) and all other supporting facilities/ Infrastructure works built up under the package contrac...
PART C: Operation & Maintenance of the facility:
Operation & Maintenance of Sewage Treatment Plants (STPs) and all other supporting facilities/ Infrastructure works built up under the package contrac...
PART C: Operation & Maintenance of the facility:
Operation & Maintenance of Sewage Treatment Plants (STPs) and all other supporting facilities/ Infrastructure works built up under the package contrac...
PART C: Operation & Maintenance of the facility:
Operation & Maintenance of Sewage Treatment Plants (STPs) and all other supporting facilities/ Infrastructure works built up under the package contrac...
PART C: Operation & Maintenance of the facility: Operation & Maintenance of Sewage Treatment Plants (STPs) and all other supporting facilities/ Infrastructure works built up under the package contrac...
PART C: Operation & Maintenance of the facility: Operation & Maintenance of Sewage Treatment Plants (STPs) and all other supporting facilities/ Infrastructure works built up under the package contrac...
PART C: Operation & Maintenance of the facility: Operation & Maintenance of Sewage Treatment Plants (STPs) and all other supporting facilities/ Infrastructure works built up under the package contrac...
PART C: Operation & Maintenance of the facility: Operation & Maintenance of Sewage Treatment Plants (STPs) and all other supporting facilities/ Infrastructure works built up under the package contrac...
PART C: Operation & Maintenance of the facility: Operation & Maintenance of Sewage Treatment Plants (STPs) and all other supporting facilities/ Infrastructure works built up under the package contrac...
PART C: Operation & Maintenance of the facility: Operation & Maintenance of Sewage Treatment Plants (STPs) and all other supporting facilities/ Infrastructure works built up under the package contrac...
PART C: Operation & Maintenance of the facility: Operation & Maintenance of Sewage Treatment Plants (STPs) and all other supporting facilities/ Infrastructure works built up under the package contrac...
PART C: Operation & Maintenance of the facility: Operation & Maintenance of Sewage Treatment Plants (STPs) and all other supporting facilities/ Infrastructure works built up under the package contrac...
PART C: Operation & Maintenance of the facility: Operation & Maintenance of Sewage Treatment Plants (STPs) and all other supporting facilities/ Infrastructure works built up under the package contrac...
PART C: Operation & Maintenance of the facility: Operation & Maintenance of Sewage Treatment Plants (STPs) and all other supporting facilities/ Infrastructure works built up under the package contrac...
PART C: Operation & Maintenance of the facility: Operation & Maintenance of Sewage Treatment Plants (STPs) and all other supporting facilities/ Infrastructure works built up under the package contrac...
PART C: Operation & Maintenance of the facility: Operation & Maintenance of Sewage Treatment Plants (STPs) and all other supporting facilities/ Infrastructure works built up under the package contrac...
PART C: Operation & Maintenance of the facility: Operation & Maintenance of Sewage Treatment Plants (STPs) and all other supporting facilities/ Infrastructure works built up under the package contrac...
PART C: Operation & Maintenance of the facility: Operation & Maintenance of Sewage Treatment Plants (STPs) and all other supporting facilities/ Infrastructure works built up under the package contrac...
PART C: Operation & Maintenance of the facility: Operation & Maintenance of Sewage Treatment Plants (STPs) and all other supporting facilities/ Infrastructure works built up under the package contrac...
PART C: Operation & Maintenance of the facility: Operation & Maintenance of Sewage Treatment Plants (STPs) and all other supporting facilities/ Infrastructure works built up under the package contrac...
PART C: Operation & Maintenance of the facility: Operation & Maintenance of Sewage Treatment Plants (STPs) and all other supporting facilities/ Infrastructure works built up under the package contrac...
PART C: Operation & Maintenance of the facility: Operation & Maintenance of Sewage Treatment Plants (STPs) and all other supporting facilities/ Infrastructure works built up under the package contrac...
PART C: Operation & Maintenance of the facility: Operation & Maintenance of Sewage Treatment Plants (STPs) and all other supporting facilities/ Infrastructure works built up under the package contrac...
PART C: Operation & Maintenance of the facility: Operation & Maintenance of Sewage Treatment Plants (STPs) and all other supporting facilities/ Infrastructure works built up under the package contrac...
PART C: Operation & Maintenance of the facility: Operation & Maintenance of Sewage Treatment Plants (STPs) and all other supporting facilities/ Infrastructure works built up under the package contrac...
PART C: Operation & Maintenance of the facility: Operation & Maintenance of Sewage Treatment Plants (STPs) and all other supporting facilities/ Infrastructure works built up under the package contrac...
PART C: Operation & Maintenance of the facility: Operation & Maintenance of Sewage Treatment Plants (STPs) and all other supporting facilities/ Infrastructure works built up under the package contrac...
PART C: Operation & Maintenance of the facility: Operation & Maintenance of Sewage Treatment Plants (STPs) and all other supporting facilities/ Infrastructure works built up under the package contrac...
PART C: Operation & Maintenance of the facility: Operation & Maintenance of Sewage Treatment Plants (STPs) and all other supporting facilities/ Infrastructure works built up under the package contrac...
PART C: Operation & Maintenance of the facility: Operation & Maintenance of Sewage Treatment Plants (STPs) and all other supporting facilities/ Infrastructure works built up under the package contrac...
PART C: Operation & Maintenance of the facility: Operation & Maintenance of Sewage Treatment Plants (STPs) and all other supporting facilities/ Infrastructure works built up under the package contrac...
PART C: Operation & Maintenance of the facility: Operation & Maintenance of Sewage Treatment Plants (STPs) and all other supporting facilities/ Infrastructure works built up under the package contrac...
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
DTS_ SBM_BGM_Pkg-7.docx
Tender Document • 6.39 MB
Vijayapura.zip
Design Document • 10.48 MB
Bagalkote.zip
Design Document • 4.47 MB
Download all tender documents and submit your bid