Loading…
Loading…
11 live10 closing this weekmost from Karnataka Urban Infrastructure Development and Finance Corporation Limited
11 results • Latest
Providing Out Source Services for Office boys-02 and Housing Keeping-01 and Night Watchman-01 to Superintending Engineer, Project Implementation Unit, KUWSMP-KUIDFC, Belagavi
Construction of Sewage Treatment Plant (STP) of 2.17 MLD at Siddapura ULB of Uttara Kannada District along with 5 years Operation & Maintenance (including 1-year Defect liability period) under Swachh Bharat Mission (U)-2.0 fund through Design, Built, Operate and Transfer (DBOT) model (Package SBM-BGM-Pkg-16)
Construction of Sewage Treatment Plant (STP) of 1.70 MLD at Babaleshwara ULB of Vijayapura District along with 5 years Operation & Maintenance (including 1-year Defect liability period) under Swachh Bharat Mission (U)-2.0 fund through Design, Built, Operate and Transfer (DBOT) model (Package SBM-BGM-Pkg-15)
Construction/Upgradation of Sewage Treatment Plant of 2.0 MLD to 5.0 MLD in Chintamani Phase-2 along with 5 years Operation & Maintenance (including 1-year Defect liability period) under SBM (U)-2.0 fund through Design, Built, Operate and Transfer (DBOT) model
Construction of Sewage Treatment Plant of 2.33 MLD in Koratagere along with 5 years Operation & Maintenance (including 1-year Defect liability period) under SBM (U)-2.0 fund through Design, Built, Operate and Transfer (DBOT) model
Construction of Sewage Treatment Plant of 0.15 MLD in Hoskote Ph-2 town along with 5 years Operation & Maintenance (including 1-year Defect liability period) under SBM (U)-2.0 fund through Design, Built, Operate and Transfer (DBOT) model
Construction of Sewage Treatment Plant of 10 MLD in Madanayakanahalli town along with 5 years Operation & Maintenance (including 1-year Defect liability period) under SBM (U)-2.0 fund through Design, Built, Operate and Transfer (DBOT) model
Construction of Sewage Treatment Plant of 3.60 MLD in Malebennur & 2.49 MLD STP in Nayakanahatti towns along with 5 years Operation & Maintenance (including 1-year Defect liability period) under SBM (U)-2.0 fund through Design, Built, Operate and Transfer (DBOT) model (Package SBM-BLR-Pkg-7)
Refurbishment of Existing 3.7 MLD WSP Sewage Treatment Plant in Magadi Town under SBM (U)-2.0 fund in DBOT model
Construction of Sewerage System in Madikeri City Phase-2 under NGT & SBM(U) 2.0 fund in DBOT model
Construction of Sewage Treatment Plants (STP) of capacity 3.03 & 3.37 MLD at Aurad & Hallikhed-B ULBs of Bidar District, 2.26 & 3.56 MLD at Yelburga& Kustagi ULBs of Koppal District along with 5 years Operation & Maintenance (including 1-year Defect liability period) under Swachh Bharat Mission (U)-2.0 fund through Design, Built, Operate and Transfer (DBOT) model. (Package-SBM/KLB-Pkg-7) Call 6