Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance ROTODYNE HOUSE 9 10 ANNAPURNA ENCLAVE ANNAPURNA ENCLAVE ADJ LANE TO BSNL OFFICE CHANADANAGAR HYDERABAD | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹50,000
Closing Date
23 Jan 2021, 10:00 amClosed
PARAU MURMU
MES DEPT ROOM NO 25 ADMIN BUILD RCF LTD CHEMBUR MUMBAI-400074
Value based Annual rate contract for Mechanical Maintenance jobs of scraper conveyors in Urea bagging of Bagging plant in RCF Trombay Unit.
2021_RCFL_606997_1
ET - MES/238/L/2021/306
Open Tender
Miscellaneous Services
Item Rate
730 days
MES DEPT ROOM NO 25 ADMIN
AS PER NIT
13 documents required · 13 mandatory
₹0
₹50,000
Yes
8 Mar 2021
2 Jan 2021
23 Jan 2021
2 Jan 2021
23 Jan 2021
2 Jan 2021
Amount
JOB NO 1 – MECHANICAL MAINTENANCE JOBS OF SCRAPER.
1-Tightening of B.E. / Scraping boom chain
2-Replacement of tie rod of B.E.
3-Replacement of tie rod of boom chain
4-Replacement of top shaft of B.E.
5-Repair / Joining of broken duplex drive chain
6-Replacement of Duplex drive chain
7-Replacement of blades of boom chain / Bucket of B.E. chain
8-Replacement of links of boom chain / Bucket of B.E. chain including inner, outer & center link
9-Replacement of take up unit of boom chain
10-Replacement of traveling G/B
11-Replacement of slewing G/B
12-Replacement of Main Drive G/B
13-Replacement of Fluid Coupling FC-20
14-Replacement of cup-springs of B.E.
15-Replacement of cup-springs of Scraping boom chain
16-Replacement of oil seal of output shaft of slewing gear box
17-Replacement of input pinion of slewing G/B with new bearings and oil seal
18-Replacement of two idlers with bearings of gear train.
19-Replacement of idler pin of gear train.
20-Opening, Cleaning the internals and box up of cover of main drive chain and gear train
21-Replacement of lantern sprocket with shear boss and shear pins
22-Replacement of shear boss with shear pins
23-Replacement of shear pins
24-Replacement of bottom shaft of B.E.
25-Replacement of main drive shaft of scraper
26-Replacement of Luffing rope
27-Repositioning of derailed chain with bucket / blades from guide angle of scraper
28-Replacement of simplex traveling chain of scraper
29-Repair / Joining of broken simplex traveling chain
30-Tightening of Slewing/ Main drive/Long travel Gear box & Idler cover Foundation bolt
31-Replacement of Idler Gasket
32-Replacement of BE Top shaft bracket
JOB NO 2 – MECHANICAL MAINTENANCE JOBS OF BELT CONVEYOR IN UREA BAGGING PLANT
1-Replacement of pulley’s with bearings -
1.a-Head Pulley (ET-1 to ET-13 conveyors) (dia 16” to 24”)
1.b-Tail /Take up pulley (ET-1 to ET-13 conveyors)(dia 12” to 20”)
1.c-Bend / Snub pulley (ET-1 to ET-13 conveyors) (dia 12” to 20”)
1.d-Head pulley - Slat conveyors
1.e-Tail pulley - Slat conveyors
2-Replacement of Gear Box -
2.a-Gear Box Size - 6" to 8"
2.b-Gear Box Size – 10” -14”
2.c-Gear Box of Slat Conveyor
3-Replacement of Coupling/sprocket half (one side only)
3.a-3a. Size from 6" to 8" (Grid member couplings)
3.b-3b. Size from 9" to 12” (Grid member couplings)
3.c-3c. Size from 13” and above (Grid member couplings)
3.d-4a. 4 to 6 holes ( pin bushes of coupling)
3.e-4b. 8 to 10 holes ( pin bushes of coupling)
3.f-4c. 12 holes ( pin bushes of coupling)
4-Replacement of bearings & re-positioning of pulley
4.a-Replacement of bearings for conveyor pulley with Plummer block (one side only)
4.b-Replacement of bearings for conveyor head pulley with Plummer block (gear box side)
4.c-Repositioning of conveyor belt pulley along with bearing
5-Replacement of Oil seals of gear box
5.a-Replacement of oil seal of G/B - non drive end
5.b-Replacement of oil seal of G/B - drive end by removing coupling and realignment with dial gauge.
6-Replacement of Skirt rubber/ Skirt Board/ Scrapers of Conveyor belt.
6.a-Replacement of skirt rubber/Scraper rubber of conveyor belt
6.b-Replacement of Skirt Rubber board of conveyor belt
6.c-Replacement /Repair of belt scrapers [primary / secondary] of conveyor belts.
7-Replacement of Frames and rollers of Conveyor belt
7.a-Replacement of troughing rollers (conveyor width 500-1000 mm)
7.b-Replacement of return rollers(conveyor width 500-1000 mm)
7.c-Replacement of guide rollers(conveyor width 500-1000 mm)
7.d-Replacement of troughing roller frame along with rollers
7.e-Replacement of return roller bracket (2 No) / Frames along with rollers
8-Repair/ replacement of tensioning arrangement of conveyors
9-Replacement of hold back of G/B online position with oil seal
10-Removal of conveyor belt off center
11-Crack welding after edge preparation and grinding in running feet
11.a-Repair of chute / Diverter of bulk material and Equipment’s
11.b-Equipment related structure
12-Conveyor steel structure related jobs
13-Neem coating system related jobs
13.a-Replacement of Mother/ baby/day tank pump (2-6 M3/hr)
13.b-Stainer replacement (Mother/ Baby/day Tank Pump)
13.c-Replacement of base frame of Mother/ Baby/Day tank
14-MDS Trolley related jobs
14.a-Removal of derailment
14.b-Wheel replacement
14.c-Drive pinion replacement
14.d-Driven wheel replacement
14.e-Drive end bearing replacement
AL AAQIB ENGINEERING WORKS
Balaji Engineering Works
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .