Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹2.2 CrAccepted-Finance 14258 ST NO 2A GANESHA BASTI BATHINDA | BATHINDA | PUNJAB | 151001 | ₹2.2 Cr | L-1 | Accepted-Finance All documents are correct. |
| 2 | L-2₹2.2 Cr+₹1.6 L (0.73%)Accepted-Finance GURUHARSARHAYE DISTRICT FIROZPUR | MALERKOTLA | PUNJAB | 148018 | ₹2.2 Cr+₹1.6 L (0.73%) | L-2 | Accepted-Finance All documents are correct. |
| 3 | L-3₹2.2 Cr+₹5.0 L (2.33%)Accepted-Finance | ₹2.2 Cr+₹5.0 L (2.33%) | L-3 | Accepted-Finance All documents are correct. |
| 4 | Not Admitted-Fee/PreQual/Technical 632 HOSIARA PATTI VILLAGE RAMPUR DISTRICT LUDHIANA | LUDHIANA | LUDHIANA | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹2.4 Cr
EMD Value
₹4.8 L
Closing Date
4 Aug 2026, 10:00 amClosed
Executive Engineer Provincial Division PWD LDH
Executive Engineer Provincial Division PWD B AND R Ldh
Construction of Government School in Shimlapuri Ludhiana Pb.
2026_CEPW_172150_1
Tender Notice No. 16 Dated 13.07.2026
Open Tender
Civil Works - Buildings
Percentage
180 days
Ludhiana
Please refer Tender documents.
22 documents required · 22 mandatory
₹20,000
₹4.8 L
Yes
1 Sept 2026
17 Jul 2026
4 Aug 2026
17 Jul 2026
4 Aug 2026
17 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | CIVIL WORKS | - | - | - | - |
| 2 | Excavation in Soil (any type) using Hydraulic Excavator CK 90 with hydraulic excavator of 0.9 cum bucket capacity including cutting, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, including all lifts and combined lead upto 30m. Earth filling under floors with surplus ordinary soil or soil containing gravel or kankar upto 40% excavated from outside the building plinth in 15 cm layers including ramming, watering and consolidating lead upto 30 metres | 432.35 | Cum | 102.19 | ₹44,181.85 |
| 3 | Earth filling under floors with surplus ordinary soil or soil containing gravel or kankar upto 40% excavated from outside the building plinth in 15 cm layers including ramming, watering and consolidating all lead | 289.67 | Cum | 66.37 | ₹19,225.4 |
| 4 | Earth filling with good quality earth obtained from out side the plinth including compensation of earth, loading, unloading, carriage from outside the peremises to site of work, spreading, laying watering compacting with rammer complete as per specifications. | - | Cum | 504.87 | - |
| 5 | Cement concrete 1:4:8 With stone aggregate 40mm gauge mixing by mechanical means using concrete mixer volumetric type | 105.49 | Cum | 4,275.55 | ₹4,51,027.77 |
| 6 | Cement concrete 1:2:4 With stone ballast or shingle mixing by mechanical means using concrete mixer volumetric type | 1 | Cum | 5,469.21 | ₹5,468.66 |
| 7 | Reinforced cement concrete M-25 mechanically batch mixed using batch type concrete mixer as per IS:1791 and vibrated by needle vibrator but excluding steel reinforcement centring and shuttering in foundation and plinth | 77.49 | Cum | 6,218.16 | ₹4,81,845.22 |
| 8 | Reinforced cement concrete M-25 mechanically batch mixed using batch type concrete mixer as per IS:1791 and vibrated by needle vibrator but excluding steel reinforcement centring and shuttering in superstructure. | 105.39 | Cum | 7,008.28 | ₹7,38,602.63 |
| 9 | Reinforced cement concrete M-25 mechanically batch mixed using batch type concrete mixer as per IS:1791 and vibrated by needle vibrator but excluding steel reinforcement centring and shuttering in superstructure. (First Floor) | 105.02 | Cum | 7,198.96 | ₹7,56,034.78 |
| 10 | Reinforced cement concrete M-25 mechanically batch mixed using batch type concrete mixer as per IS:1791 and vibrated by needle vibrator but excluding steel reinforcement centring and shuttering in superstructure. (Second Floor) | 19.86 | Cum | 7,389.64 | ₹1,46,758.25 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 6.30 MB
Tendernotice_2.pdf
PDF • 1.60 MB
Tendernotice_3.pdf
PDF • 2.69 MB
Tendernotice_4.pdf
PDF • 8.16 MB
Tendernotice_5.pdf
PDF • 1.13 MB
BOQ_350112.xls
BOQ • 1.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .