Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹24.7 L
EMD Value
₹25,000
Closing Date
10 Nov 2025, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SUPERINTENDING ENGINEER
SUPERINTENDING ENGINEER EDC SULTANPUR
AS PER NIT
2025_MVVNL_1084502_1
31/EDC(S)/2025-26
Open Tender
Electrical Works
Lump-sum
270 days
SULTANPUR
AS PER BOQ
3 documents required · 3 mandatory
₹3,540
SUPERINTENDING ENGINEER
₹25,000
21 Oct 2025
21 Oct 2025
10 Nov 2025
21 Oct 2025
10 Nov 2025
21 Oct 2025
Stone pad.
LT Clamp with Nut & Bolts.
Earth Wire Clamp with Nut & Bolts.
Clamp for Top/T-off/Dropper.
Suspension Clamp.
Dead end Clamp.
Eye Hook.
Eye Hook Clamp.
X-Arm Holding Clamp.
Red Oxide Paint.
Alluminium Paint.
F-Bracket.
Guarding Angle.
Guarding Angle Clamp.
Shackle Insulator.
Distribution Box 3 Phase with Clamp.
Stay Loop Insulator/Guy Insulator.
Bolts, Nuts & Washers all sizes.
L.T. Connector (Pearcing).
Safe carriage of STP 11 Mtr.
Safe carriage of PCC Pole 8.5 Mtr. Long.
Safe carriage of ACSR Weasel Conductor/Dog Conductor.
Safe carriage of 11 KV XLPE Cable Al. 3x120/3x70 sq.mm.
Safe carriage of LT XLPE Cable ABC 1 Phase/3 Phase.
Safe carriage of Meter Qubical.
Safe carriage of CT/PT Combinud Unit.
Safe carriage of T/F 25 KVA.
Safe carriage of T/F 63 KVA.
Safe carriage of T/F 100 KVA.
Safe carriage of T/F 250 KVA.
Safe carriage of T/F 400 KVA.
Safe carriage of Other Line Materials.
Dragging of STP from site to pit point.
Dragging of PCC Pole from site to pit point.
Fabrication & errection of Single Pole 11 Mtr support on STP including digging of pit & fixing of all accessories and clamps as per RESPO norms.
Fabrication & errection of double pole 11 Mtr support on STP including digging of pit & fixing of all accessories and clamps as per RESPO norms.
Fabrication & errection of single pole support on PCC pole including digging of pit & fixing of all accessories and clamps as per RESPO norms.
Fabrication & errection of double pole support on PCC pole including digging of pit & fixing of all accessories and clamps as per RESPO norms.
Grouting of Structure by digging od pit 1.83 Mtr. Deep for 11 Mtr STP/8.5 Mtr PCC Pole foundation is provided with help of steel or wooden formers, groutung with 1:4:5 Ratio cement, sand & first class brick ballast 0.285 cu mtr for 11 Mtr STP/8.5 Mtr PCC Pole plinthing/Muffing 0.3 Mtr above G/L and Proper plastering as per RESPO norms.
Earthing of 11 Mtr STP/8.5 Mtr PCC Pole as per RESPO norms.
Stay Complete.
Laying Stringing & sagging of New ACSR Weasel Conductor/Dog Conductor including binding jumpering etc.
Digging of Trench & Laying of cable 11 KV XLPE cable 3x120/3x70 sq.mm including sands & brick.
Hanging Hosting & clamping and G.I. Pipe Channel nut & Bolts 3x120/3x70 sq mm XLPE 11 KV Cable (Cost of all accessories will be borne by contractor) as per RESSPO Norms.
Installation and Fixing of Heat Shrinkable Type 11 KV Cable joiting Kit 3x120/3x70 sq mm XLPE Cable Box as per norms.
High Pressure testing after completion of laying of 11 KV XLPE cable, Fixing of joints & termination. (Testing equipment shall be arranged by the contractor).
Making cable jointing kit I/D & O/D 3X120/3x70 sq.mm.
Installation of Meter Qubical.
Installation of CT/PT Combinud Unit.
Route Cable Marker with size 3x1.5 feet stone for underground cable at every 100 mtr from initial point with Notice "11 KV U/G Line" Painted on it (All the material, Manpower and T&P will be arranged by the contractor at his own cost).
Road Restoration Charges for Pucca Road Crossing.
Road Restoration Charges for Footpath Side.
Laying Stringing & sagging of LT XLPE Cable ABC 3x120+1x95+1x16/3x50+1x35+1x16/1x25+ 1x16 sq.mm.
Erection and mounting of 25 KVA T/F.
Erection and mounting of 63 KVA T/F.
Erection and mounting of 100 KVA T/F.
Providing and installation of SMC Box for 25 KVA To 100 KVA.
Installation of 250/400 KVA T/F on plinth.
Construction of plinth for 250/400 KVA T/F including of all material with Specification the plinth construction requires a 150mm concrete slab below the channel, with brickwork beneath it. The total height of the plinth should be 1200mm. All configurations are as follows: 1500mm*1500mm*1200mm as per RESPO norms.
Fencing work suitable of 250/400 KVA T/F plinth of size 15x12x8 and angles of suitable size should be grouted on all 04 corners and 01 side for gate. Gate will also be constructed and Jali for fencing of size 1" of Burfi Shape as per RESPO norms.
Supply and Installation of Tail less Fuse Unit 300/500 amp., Al. Lug 400 mm. & L- Clamp (Copper) with structure and associated work For 250/400 KVA Transformer
Work of wrapping of Plastic sheet around the ST Pole up to 2.5 meter hight form ground level (All the material, Manpower and T&P will be arranged by the contractor at his own cost).
Erection and Commissioning of Three Phase Distribution Box with help of clamps as per norms. (Cost of clamps, nut & bolts shall be borne by the contractor).
Suply & Erection Danger Board (All the material, Manpower and T&P will be arranged by the contractor at his own cost).
Tree Branch Chopping.
Dismentalling of old line and Cartage of material form site to store sultanpur.
Pipe Earthing of 250/400 KVA Transformer (By boring of 4 inch diameter 20 m deep, 40 mm diameter A class GI pipe is inserted to a depth of 20 m and a holed pipe of 1.5 m length is inserted at the bottom. Tighten one end of the MS strip of size 50x6mm with the nut bolt with the neutral of the converter and weld the other end with the GI pipe inserted in the boring for earthing. Putting a socket on the upper part of the pipe (mouth) so that water can be poured into it to retain moisture. To complete the work Contractor will provide all material, Manpower, T&P, safe carriage of material to worksite as per RESPO norms.
Pipe Earthing of Meter Qubical (By boring of 4 inch diameter 20 m deep, 40 mm diameter A class GI pipe is inserted to a depth of 20 m and a holed pipe of 1.5 m length is inserted at the bottom. Tighten one end of the MS strip of size 50x6mm with the nut bolt with the neutral of the converter and weld the other end with the GI pipe inserted in the boring for earthing. Putting a socket on the upper part of the pipe (mouth) so that water can be poured into it to retain moisture. To complete the work Contractor will provide all material, Manpower, T&P, safe carriage of material to worksite as per RESPO norms.
Providing and fixing & Crimping of Al. Lug required size.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.32 MB
Tenderdocument.pdf
Tender Documents • 0.55 MB
31.pdf
Additional Documents • 7.05 MB
BOQ_1987276.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .