Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.1 LAccepted-Finance 117 2 KAKA DEV KANPUR | KANPUR NAGAR | UTTAR PRADESH | 208001 | ₹2.1 L | L1 | Accepted-Finance L1 |
| 2 | L2₹2.2 LRejected-Finance | ₹2.2 L | L2 | Rejected-Finance L2 |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Others-bid capacity is not enclosed |
| Sl No | Description | Qty | Unit | OM SAI CONSTRUCTION COMPANY L1 | JAGDESH PRASAD L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work in foundation in all type of soil including initial lift up to 1.50 meter and lead up to 30 meter and including back filling watering and ramming of excavated earth into the space between the structure and the sides of foundation trenches and disposal of surplus earth as directed by the Engineer-in-charge up to 30 meter distance from the foundation. | 66.45 | CUM | 200 ₹13,290 | 60 ₹3,987 |
| 2.00 | Providing and Laying of Cement Concrete ( M-10 grade) 1:3:6 including cost of all material, labour and T&P etc complete required for proper completion of work. | 2.97 | CUM | 4,700 ₹13,959 | 4,729 ₹14,045.13 |
| 3.00 | Providing and Laying of Cement Concrete ( M-15 grade) 1:2:4 including cost of all material, labour and T&P etc complete required for proper completion of work. | 6.12 | CUM | 4,900 ₹29,988 | 5,135 ₹31,426.20 |
| 4.00 | Providing and Laying of RCC ( M-15 grade) 1:2:4 including cost of all material, labour and T&P etc complete required for proper completion of work. | 1.83 | CUM | 5,200 ₹9,516 | 5,452 ₹9,977.16 |
| 5.00 | Brick work M-105 in 1:3 Cement Mortar including cost of all material, labour and T & P etc. complete required for proper completion of work. | 21.78 | CUM | 5,000 ₹1.1 L | 4,957 ₹1.1 L |
| 6.00 | Providing and fixing 100 mm dia PVC pipe in outlet i/c all type of material and labour, T&P filter etc. required complete. | 14.48 | RM | 170 ₹2,461.60 | 122 ₹1,766.56 |
| 7.00 | Providing and fixing 150 mm dia PVC pipe in outlet i/c all type of material and labour, T&P filter etc. required complete. | 35.82 | RM | 180 ₹6,447.60 | 514 ₹18,411.48 |
| 8.00 | Providing and Fixing Steel Reinforcement including cost of steel, binding wire, bending, binding, welding, cutting, placing in position, including all lift and leads with cost of all material labour and T & P, all lift and leads etc. complete as per direction in Charge. | 95.49 | KG. | 75 ₹7,161.75 | 57 ₹5,442.93 |
| 9.00 | Providing and Fixing Centering and Shuttering for C.C. works including all lift and leads with cost of all material labour and T & P, all lift and leads etc. complete as per direction of Engineer in Charge. | 32.76 | SQM | 300 ₹9,828 | 426 ₹13,955.76 |
| 10.00 | Providing and Fixing Centering and Shuttering for RCC works including all lift and leads with cost of all material labour and T & P, all lift and leads etc. complete as per direction of Engineer in Charge. | 26.94 | SQM | 400 ₹10,776 | 623 ₹16,783.62 |
Tender Value
Refer Docs
EMD Value
₹5,000
Closing Date
19 May 2026, 5:00 pmClosed
EE M G C C Div 8 Bulandshahr
M G C C Div 8 Bulandshahr
Lot 10 Construction of 3 Nos. Outlets at Km. 0.000 to Km. 9.000 of Kamalpur Dy.
2026_UPIDC_1144439_12
01.EE.2026-27
Open Tender
Civil Works - Canal
45 days
SAMBHAL
2 documents required · 2 mandatory
₹677
₹5,000
Yes
25 May 2026
14 May 2026
20 May 2026
14 May 2026
19 May 2026
14 May 2026
14 May 2026 - 19 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in foundation in all type of soil including initial lift up to 1.50 meter and lead up to 30 meter and including back filling watering and ramming of excavated earth into the space between the structure and the sides of foundation trenches and disposal of surplus earth as directed by the Engineer-in-charge up to 30 meter distance from the foundation. | - | CUM | - | - |
| 2 | Providing and Laying of Cement Concrete ( M-10 grade) 1:3:6 including cost of all material, labour and T&P etc complete required for proper completion of work. | - | CUM | - | - |
| 3 | Providing and Laying of Cement Concrete ( M-15 grade) 1:2:4 including cost of all material, labour and T&P etc complete required for proper completion of work. | - | CUM | - | - |
| 4 | Providing and Laying of RCC ( M-15 grade) 1:2:4 including cost of all material, labour and T&P etc complete required for proper completion of work. | - | CUM | - | - |
| 5 | Brick work M-105 in 1:3 Cement Mortar including cost of all material, labour and T & P etc. complete required for proper completion of work. | - | CUM | - | - |
| 6 | Providing and fixing 100 mm dia PVC pipe in outlet i/c all type of material and labour, T&P filter etc. required complete. | - | RM | - | - |
| 7 | Providing and fixing 150 mm dia PVC pipe in outlet i/c all type of material and labour, T&P filter etc. required complete. | - | RM | - | - |
| 8 | Providing and Fixing Steel Reinforcement including cost of steel, binding wire, bending, binding, welding, cutting, placing in position, including all lift and leads with cost of all material labour and T & P, all lift and leads etc. complete as per direction in Charge. | 1 | KG. | - | - |
| 9 | Providing and Fixing Centering and Shuttering for C.C. works including all lift and leads with cost of all material labour and T & P, all lift and leads etc. complete as per direction of Engineer in Charge. | 1 | SQM | - | - |
| 10 | Providing and Fixing Centering and Shuttering for RCC works including all lift and leads with cost of all material labour and T & P, all lift and leads etc. complete as per direction of Engineer in Charge. | - | SQM | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.37 MB
TD10.pdf
Tender Documents • 1.85 MB
BOQ_2148815.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid