Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 2 3 AMIT VIJAY APT CHSL KASTURBA CROSS ROAD NEAR BHANU PARK KANDIVALI WEST MUMBAI 400 067 | MUMBAI | MUMBAI | MAHARASHTRA | 400067 | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Rejected-Technical B 248 BASEMENT BLOCK B CHITTARANJAN PARK NEW DELHI 110019 11 SOUTH DELHI DELHI 110019 | SOUTH EAST DELHI | DELHI | 110019 | Rejected-Technical Pl refer TR |
| 4 | Rejected-Technical 115 B K PAUL AVENUE 115 B K PAUL AVENUE KMC WARD NO 19 KOLKATA BANKURA WEST BENGAL 700005 INDIA | KOLKATA | WEST BENGAL | 700005 | Rejected-Technical Pl refer TR |
| 5 | Rejected-Technical | Rejected-Technical Pl refer TR |
Tender Value
Refer Docs
EMD Value
₹26,000
Closing Date
19 Feb 2020, 11:00 amClosed
Sanjeeb Barman 03776 265439
Numaligarh Refinery Limited
Evaluation of structural soundness of existing buildings/ Structures of Power and Utility Department of NRL
2020_NRL_540254_1
OC48000020/SNJ
Open Tender
Miscellaneous Services
Works
60 days
Numaligarh Refinery Limited
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹26,000
Yes
Commercial dept., Numaligarh
18 Jun 2020
30 Jan 2020
20 Feb 2020
30 Jan 2020
19 Feb 2020
30 Jan 2020
10 Feb 2020
Amount
Chlorinator Room of Cooling tower
Physical observations of foundation system for load bearing walls, pile caps, brick pillasters etc., at critical locations and recording observations and distress features if any and identifying the same on the drawings.
Physical observations on all RCC members
Carrying theoretical analysis to check the structural adequacy with insitu NDT and Physical observations results as design inputs
Designing of remedial engineering measures based on the outputs of structural analysis and physical observations, as required
Furnishing structural audit report and structural adequacy certificate
Cold water Basin of cooling tower
Physical observations of foundation system for load bearing walls, pile caps, brick pillasters etc., at critical locations and recording observations and distress features if any and identifying the same on the drawings.
Physical observations on all RCC members at all levels
Carrying theoretical analysis to check the structural adequacy with insitu NDT and Physical observations results as design inputs
Designing of remedial engineering measures based on the outputs of structural analysis and physical observations, as required
Furnishing structural audit report and structural adequacy certificate
DM Plant (SAK & SHL)
Physical observations of foundation system for load bearing walls, pile caps, brick pillasters etc., at critical locations and recording observations and distress features if any and identifying the same on the drawings.
Physical observations on all RCC members at all levels
Carrying theoretical analysis to check the structural adequacy with insitu NDT and Physical observations results as design inputs
Designing of remedial engineering measures based on the outputs of structural analysis and physical observations, as required
Furnishing structural audit report and structural adequacy certificate
Fire Water Pump House
Physical observations of foundation system for load bearing walls, pile caps, brick pillasters etc., at critical locations and recording observations and distress features if any and identifying the same on the drawings.
Physical observations on all RCC members at all levels
Carrying theoretical analysis to check the structural adequacy with insitu NDT and Physical observations results as design inputs
Designing of remedial engineering measures based on the outputs of structural analysis and physical observations, as required
Furnishing structural audit report and structural adequacy certificate
Light wt. roof building- Nitrogen Plant
Physical observations of foundation system for load bearing walls, pile caps, brick pillasters etc., at critical locations and recording observations and distress features if any and identifying the same on the drawings.
Physical observations on all RCC members at all levels
Carrying theoretical analysis to check the structural adequacy with insitu NDT and Physical observations results as design inputs
Designing of remedial engineering measures based on the outputs of structural analysis and physical observations, as required
Furnishing structural audit report and structural adequacy certificate
MCC building & Control room - Nitrogen Plant
Physical observations of foundation system for load bearing walls, pile caps, brick pillasters etc., at critical locations and recording observations and distress features if any and identifying the same on the drawings.
Physical observations on all RCC members at all levels
Carrying theoretical analysis to check the structural adequacy with insitu NDT and Physical observations results as design inputs
Designing of remedial engineering measures based on the outputs of structural analysis and physical observations, as required
Furnishing structural audit report and structural adequacy certificate
Clarifloculator- Raw water treatment Plant
Physical observations of foundation system for load bearing walls, pile caps, brick pillasters etc., at critical locations and recording observations and distress features if any and identifying the same on the drawings.
Physical observations on all RCC members at all levels
Carrying theoretical analysis to check the structural adequacy with insitu NDT and Physical observations results as design inputs
Designing of remedial engineering measures based on the outputs of structural analysis and physical observations, as required
Furnishing structural audit report and structural adequacy certificate
Air Blower, Effluent Sump, Overhead rese
Physical observations of foundation system for load bearing walls, pile caps, brick pillasters etc., at critical locations and recording observations and distress features if any and identifying the same on the drawings.
Physical observations on all RCC members at all levels
Carrying theoretical analysis to check the structural adequacy with insitu NDT and Physical observations results as design inputs
Designing of remedial engineering measures based on the outputs of structural analysis and physical observations, as required
Furnishing structural audit report and structural adequacy certificate
Chemical house - Raw water treatment plant
Physical observations of foundation system for load bearing walls, pile caps, brick pillasters etc., at critical locations and recording observations and distress features if any and identifying the same on the drawings.
Physical observations on all RCC members at all levels
Carrying theoretical analysis to check the structural adequacy with insitu NDT and Physical observations results as design inputs
Designing of remedial engineering measures based on the outputs of structural analysis and physical observations, as required
Furnishing structural audit report and structural adequacy certificate
Filter House - Raw water treatment plant
Physical observations of foundation system for load bearing walls, pile caps, brick pillasters etc., at critical locations and recording observations and distress features if any and identifying the same on the drawings.
Physical observations on all RCC members at all levels
Carrying theoretical analysis to check the structural adequacy with insitu NDT and Physical observations results as design inputs
Designing of remedial engineering measures based on the outputs of structural analysis and physical observations, as required
Furnishing structural audit report and structural adequacy certificate
Filtered Water Reservoir and Pump House
Physical observations of foundation system for load bearing walls, pile caps, brick pillasters etc., at critical locations and recording observations and distress features if any and identifying the same on the drawings.
Physical observations on all RCC members at all levels
Carrying theoretical analysis to check the structural adequacy with insitu NDT and Physical observations results as design inputs
Designing of remedial engineering measures based on the outputs of structural analysis and physical observations, as required
Furnishing structural audit report and structural adequacy certificate
CPP Control Room Building
Physical observations of foundation system for load bearing walls, pile caps, brick pillasters etc., at critical locations and recording observations and distress features if any and identifying the same on the drawings.
Physical observations on all RCC members at all levels
Carrying theoretical analysis to check the structural adequacy with insitu NDT and Physical observations results as design inputs
Designing of remedial engineering measures based on the outputs of structural analysis and physical observations, as required
Furnishing structural audit report and structural adequacy certificate
Phase- II SITE SUPERVISION
Site supervision during execution
National Technical Services
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .