| 1 | L1₹10.9 LAccepted-AOC HIMACHAL PRADESH HP | CHAMBA | HIMACHAL PRADESH | 176315 | L1 | Accepted-AOC L1 | |
| 2 | L2₹14.5 L+₹1.8 L (14.6%)Rejected-Finance | L2 | Rejected-Finance This is L2 Bidder |
Tender Value
₹5.5 L
EMD Value
₹11,100
Closing Date
19 Jun 2021, 5:00 pmClosed
Executive Officer
Executive Officer Municipal Council Sarkaghat
Working estimate Proposed path in harizan Basthi Bei Nallah ward No-7 from Sh.Nek Ram House to Late Sh.Budhi Singh House upper Bai Nallah
2021_UDDHP_48322_1
No.MC-SKT-Tender/2021-22 -1428-1432 Dt. 03-06-2021
Open Tender
Civil Works
Item Rate
90 days
Sarkaghat
Please refer Tender documents.
10 documents required · 10 mandatory
₹500
Executive Officer Municipal Council Sarkaghat
₹11,100
3 Sept 2021
14 Jun 2021
21 Jun 2021
14 Jun 2021
19 Jun 2021
14 Jun 2021
14 Jun 2021 - 19 Jun 2021
Amount
Clearring Jungle i/c uprooting of rank vegetation grass,brush wood tree and saplings of grith up to 30cm measured at aheight of 1 metre above ground and removal of rubbish up to adistance of 20 m out side the periphery.
Dressing the ground i/c cutting filling up to 15cm work complete as per dirction and to the entire satisfaction of Engineer-in-charge.
Excavation in foundations, trenches etc. in earth work in all kinds of soils such as pick work, jumper work, blasting work and chiselling/wedging out of hard or soft rock (where blasting is prohibited) up to all heights stacking the excavated soil not more than 3 meters clear from the edge of excavation and then returning the stacked soil in15 Cms, Layers, when required into plinths, sides of foundations etc. consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth as directed by the Engineer-in-charge in all leads and lifts.
Providing form work with steel plates 3.15mm thick welded with angle iron frames 30x30x5mm so as to give a fair finish including centering, shuttering, strutting and propping etc. with wooden battens and ballies heights of propping and centering below supporting floor to ceiling in all heights and removal of the same for in-situ reinforced concrete and plain concrete work including carriage of materials in all leads and lifts:-
(a) Flat surfaces such as soffits of suspended floors, roofs, landings and the like floors etc. up to 200 mm in thickness.
(b) Vertical surfaces such as walls.
(c)Beams, cantilever, girders and lintels. Sides and soffits of beam, beam haunchings cantilevers, bressumers and lintels not exceeding 1 mtr in depth in all heights from floor.
(c) Edges of slabs and breaks in floors and walls. Under 20 cm. Wide.
Providing and laying cement concrete 1:4:8(1cement:4sand:8 graded stone aggregate 25mm nominal size) and curing complete excluding cost of centering and shuttering in foundation and plinth including carriage of material in all leads and lifts.
Providing and laying Plain cement concrete 1:5:10(1cement:5sand:10graded stone aggregate 40 mm nominal size) and curing complete excluding cost of centering and shuttering in foundation and plinth including carriage of material in all leads and lifts.
Providing and laying mechanically mixed vibrated reinforced concrete of mixed design to have characteristics strength of M-20 GRADE and curing complete excluding the cost of form work and reinforcement for reinforced concrete work including carriage of material in all leads and lifts:-
(a) Foundations, footings, bases of columns and the like mass concrete.
(b) Suspended floors, roofs, landings and shelves and their supports, balconies, beams, girders, bressumers and cantilevers lintels in all heights.
(e)Vertical and horizontal fins (thickness not more than 0.10 meter) individually or forming box louvers and projected band upto floor all level.
Stone soling properly hand packed filling interstices with spalls and consolidating power road roller the requested gradientand comber i/c spresding watering and rolling of binding material complete as per H.P.PW.D specification 100mm spred thicness.
Precast checkered tiles hydraulic compressed 22 mm thick with marble chips of specified size laid in floor, treads of steps and landings on a bed of 25mm average thickness of cement mortar 1:6(1cement:6sand) jointed with neat cement slurry mixed with pigment to match the shade of tiles (wherever required) including rubbing and polishing complete with tiles of White shade including carriage of material in all leads and lifts.(Grey) Make N.T.C. equivalent.
Steel work welded in built up sections trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of red lead paint including carriage of material inn all leads and lifts:-
(b) In gratings, framed guard, bars, ladders, railings, brackets and similar work.
Kushal Kumar
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .