| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAdmitted-Finance | ₹1.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.1 Cr+₹6.3 L (5.88%)Admitted-Finance AT KHAS KAJORA COLLIERY P O KAJORA GRAM DIST PASCHIM BARDHAMAN WEST BENGAL 713338 | PASCHIM BARDHAMAN | WEST BENGAL | 713338 | ₹1.1 Cr+₹6.3 L (5.88%) | L2 | Admitted-Finance |
| 3 | L3₹1.1 Cr+₹6.3 L (5.88%)Admitted-Finance A PO GOPINATH MARG HINJILICUT DIST GANJAM ODISHA PIN 761102 | HINJILICUT | GANJAM | ODISHA | 761102 | ₹1.1 Cr+₹6.3 L (5.88%) | L3 | Admitted-Finance |
| 4 | L4₹1.2 Cr+₹8.1 L (7.53%)Admitted-Finance | ₹1.2 Cr+₹8.1 L (7.53%) | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | DAYANIDHI SAHU L1 | SANJAY KUMAR SETHY L3 | POONAM BIHANI L4 | MANOJ KUMAR SINGH L2 |
|---|---|---|---|---|---|---|---|
| 1.00Supplying Labour, Materials and T&P for Laying of pipelines, Construction of valve Chambers, providing 100% functional house tape connections etc.in connection with to PWS to Kumarpur under Kukudakhandi Block. | |||||||
| 1.01 | Supplying all materials labour T&P for of Laying, testing and commissioning of Rising main & Distribution system pipe line such as UPVC,HDPE,ASTM, G.I /CI pipes line etc along with required fittings & specials and construction of valve chamber, bore well platform,individual house hold connection,Internal electrification, installation of submersible pump with motor in deep Tube well etc.as per detail scope of work & technical specification, quantity of work mention in Schedule-I in DTCN and in ( Annexure-A to B). Materials as required shall be supplied by the Contractor as per terms and condition of DTCN & all dimensions are as per Schedule-I in DTCN and as per direction of Engineer in Charge . All work shall be completed in such a manner that all house hold of entire village will get required quantity of drinking water with residual head of 7m without any likage in the entire PWS system as per direction of Engineer-in-charge. | 1 | Nos | 14,97,204.96 ₹14,97,204.96 Lowest | 15,85,265.49 ₹15,85,265.49 | 15,11,210.41 ₹15,11,210.41 | 15,85,265.12 ₹15,85,265.12 |
| 2.00Supplying Labour, Materials and T&P for Laying of pipelines, Construction of valve Chambers, pump house ,construction of compound walll ,pumping unit instaltion, providing 100% functional house tape connections etc. in connection with to PWS to Barapalli of Bathapalli G.P under Kukudakhandi Block. | |||||||
| 2.01 | Supplying all materials labour T&P design, drawing ,soil testing etc. complete in all respect for construction of RCC Roof building Pump House and construction of Compound wall for Pump House .Laying, testing and commissioning of Rising main & Distribution system pipe line such as UPVC,HDPE,ASTM, G.I /CI pipes line etc along with required fittings & specials and construction of valve chamber,individual house hold connection, installation of submersible pump with motor in deep Tube well etc.as per detail scope of work & technical specification, quantity of work mention in Schedule-I in DTCN and in ( Annexure-A to D). Materials as required shall be supplied by the Contractor as per terms and condition of DTCN & all dimensions are as per Schedule-I in DTCN and as per direction of Engineer in Charge . All work shall be completed in such a manner that all house hold of entire village will get required quantity of drinking water with residual head of 7m without any likage in the entire PWS system as per direction of Engineer-in-charge. | 1 | Nos | 13,07,522.94 ₹13,07,522.94 | 13,84,426.99 ₹13,84,426.99 | 12,88,081.32 ₹12,88,081.32 Lowest | 13,84,427 ₹13,84,427 |
| 3.00Supplying Labour, Materials and T&P for Laying of pipelines, Construction of valve Chambers, pump house,compound wall,construuction of 30 KL Capacity OHT ,providing 100% functional house tape connections etc. in connection with to PWS to Kankia under Kukudakhandi Block.. | |||||||
| 3.01 | Supplying all materials labour T&P design, drawing ,soil testing etc. complete in all respect for construction of RCC Roof building Pump House and construction of Compound wall for Pump House .Laying, testing and commissioning of Rising main & Distribution system pipe line such as UPVC,HDPE,ASTM, G.I /CI pipes line etc along with required fittings & specials and construction of valve chamber,, bore well platform,individual house hold connection, Drinking Water supply provision to School / AWC / G.P. Office, installation of submersible pump with motor in deep Tube well etc.as per detail scope of work & technical specification, quantity of work mention in Schedule-I in DTCN and in ( Annexure-A to D). Materials as required shall be supplied by the Contractor as per terms and condition of DTCN & all dimensions are as per Schedule-I in DTCN and as per direction of Engineer in Charge . All work shall be completed in such a manner that all house hold of entire village will get required quantity of drinking water with residual head of 7m without any likage in the entire PWS system as per direction of Engineer-in-charge. | 1 | Nos | 29,78,530.02 ₹29,78,530.02 Lowest | 31,53,717 ₹31,53,717 | 33,83,740.76 ₹33,83,740.76 | 31,53,717.05 ₹31,53,717.05 |
| 3.02 | Construction of 30,000 LTR ESR WITH 10M STAGING
Supplying of all labour,T&P,material including taxes for soil testing ,supply of design, drawing, construction,errection,testing & commissioning etc. of RCC elevated storage reservoir of 30,000 ltrs capacity with necessary staging height of 10 mtr consisting of cylindrical container with minimum 6 nos RCC columns and circular dome with full raft using CC M-25 with RCC stair case as per approved drawing,supplying, fitting & fixing of 80 mm medium grade GI pipe Tata/Jindal/Sail make confirming to IS specification of required length from production well to ESR & ESR to rising main including in-let,out-let,over flow & washing line of ESR,use of 32 mm GI pipe for Gallary and vertical post. and Aluminium ladder inside and outside the ESR,CI puddle collar,0.6 m dia CI manhole cover at dome , RCC vent with brass jally, lightening arrestor and water level indicator etc. complete as per direction of the Engineer - in- Charge. (The contractor is to approve all structural design & drawing from State Technical Agency IGIT,Saranga /CET,BBSR /VSSUT,Burla /NIT,Rourkela/IIT,BBSR/PMEC,Berhampur at his own cost) | 1 | Nos | 11,46,229.21 ₹11,46,229.21 Lowest | 12,13,646.5 ₹12,13,646.5 | 12,28,346.33 ₹12,28,346.33 | 12,13,646.53 ₹12,13,646.53 |
| 4.00Supplying Labour, Materials and T&P for Laying of pipelines, Construction of valve Chambers, compound wall construuction of 50 KL Capacity ESR with 12 mtr staging ,pumping unit installation,Providing 100% functional house tape connections etc. in connection with to PWS to Satapandia under Kukudakhandi Block. | |||||||
| 4.01 | Supplying all materials labour T&P for construction of Compound wall for Pump House .Laying, testing and commissioning of Rising main & Distribution system pipe line such as UPVC,HDPE,ASTM, G.I /CI pipes line etc along with required fittings & specials and construction of valve chamber, bore well platform,individual house hold connection,, installation of submersible pump with motor in deep Tube well etc.as per detail scope of work & technical specification, quantity of work mention in Schedule-I in DTCN and in ( Annexure-A to C). Materials as required shall be supplied by the Contractor as per terms and condition of DTCN & all dimensions are as per Schedule-I in DTCN and as per direction of Engineer in Charge . All work shall be completed in such a manner that all house hold of entire village will get required quantity of drinking water with residual head of 7m without any likage in the entire PWS system as per direction of Engineer-in-charge. | 1 | Nos | 22,88,450.78 ₹22,88,450.78 Lowest | 24,23,049.7 ₹24,23,049.7 | 24,66,978.34 ₹24,66,978.34 | 24,23,049.7 ₹24,23,049.7 |
| 4.02 | Construction of 50,000 LTR ESR WITH 12M STAGING
Supplying of all labour,T&P,material including taxes for soil testing ,supply of design, drawing, construction,errection,testing & commissioning etc. of RCC elevated storage reservoir of 50,000 ltrs capacity with necessary staging height of 12 mtr consisting of cylindrical container with minimum 6 nos RCC columns and circular dome with full raft using CC M-25 with RCC stair case as per approved drawing,supplying, fitting & fixing of 80 mm medium grade GI pipe Tata/Jindal/Sail make confirming to IS specification of required length from production well to ESR & ESR to rising main including in-let,out-let,over flow & washing line of ESR,use of 32 mm GI pipe for Gallary and vertical post. and Aluminium ladder inside and outside the ESR,CI puddle collar,0.6 m dia CI manhole cover at dome , RCC vent with brass jally, lightening arrestor and water level indicator etc. complete as per direction of the Engineer - in- Charge. (The contractor is to approve all structural design & drawing from State Technical Agency IGIT,Saranga /CET,BBSR /VSSUT,Burla /NIT,Rourkela/IIT,BBSR/PMEC,Berhampur at his own cost) | 1 | Nos | 15,18,169.3 ₹15,18,169.3 Lowest | 16,07,462.8 ₹16,07,462.8 | 16,65,817.44 ₹16,65,817.44 | 16,07,462.88 ₹16,07,462.88 |
Tender Value
₹1.3 Cr
Closing Date
25 Aug 2021, 5:00 pmClosed
Superintending Engineer, RWSS Division, Berhampur
Near Jarada Bunglow. Berhampur-760004
PWS to (1) Kumarpur (2) Baraplli (3) Kankia (4)Satapandia under Kukudakhandi Block
2021_RWSS_70141_1
EERWSSBAM- 11 ( A ) / 2021-22
National Competitive Bid
Civil Works - Water Works
Item Rate
365 days
Kukudakhandi Block
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
Exempted
16 Oct 2021
5 Aug 2021
26 Aug 2021
5 Aug 2021
25 Aug 2021
5 Aug 2021
5 Aug 2021 - 21 Aug 2021
Amount
Supplying Labour, Materials and T&P for Laying of pipelines, Construction of valve Chambers, providing 100% functional house tape connections etc.in connection with to PWS to Kumarpur under Kukudakhandi Block.
Supplying all materials labour T&P for of Laying, testing and commissioning of Rising main & Distribution system pipe line such as UPVC,HDPE,ASTM, G.I /CI pipes line etc along with required fittings & specials and construction of valve chamber, bore well platform,individual house hold connection,Internal electrification, installation of submersible pump with motor in deep Tube well etc.as per detail scope of work & technical specification, quantity of work mention in Schedule-I in DTCN and in ( Annexure-A to B). Materials as required shall be supplied by the Contractor as per terms and condition of DTCN & all dimensions are as per Schedule-I in DTCN and as per direction of Engineer in Charge . All work shall be completed in such a manner that all house hold of entire village will get required quantity of drinking water with residual head of 7m without any likage in the entire PWS system as per direction of Engineer-in-charge.
Supplying Labour, Materials and T&P for Laying of pipelines, Construction of valve Chambers, pump house ,construction of compound walll ,pumping unit instaltion, providing 100% functional house tape connections etc. in connection with to PWS to Barapalli of Bathapalli G.P under Kukudakhandi Block.
Supplying all materials labour T&P design, drawing ,soil testing etc. complete in all respect for construction of RCC Roof building Pump House and construction of Compound wall for Pump House .Laying, testing and commissioning of Rising main & Distribution system pipe line such as UPVC,HDPE,ASTM, G.I /CI pipes line etc along with required fittings & specials and construction of valve chamber,individual house hold connection, installation of submersible pump with motor in deep Tube well etc.as per detail scope of work & technical specification, quantity of work mention in Schedule-I in DTCN and in ( Annexure-A to D). Materials as required shall be supplied by the Contractor as per terms and condition of DTCN & all dimensions are as per Schedule-I in DTCN and as per direction of Engineer in Charge . All work shall be completed in such a manner that all house hold of entire village will get required quantity of drinking water with residual head of 7m without any likage in the entire PWS system as per direction of Engineer-in-charge.
Supplying Labour, Materials and T&P for Laying of pipelines, Construction of valve Chambers, pump house,compound wall,construuction of 30 KL Capacity OHT ,providing 100% functional house tape connections etc. in connection with to PWS to Kankia under Kukudakhandi Block..
Supplying all materials labour T&P design, drawing ,soil testing etc. complete in all respect for construction of RCC Roof building Pump House and construction of Compound wall for Pump House .Laying, testing and commissioning of Rising main & Distribution system pipe line such as UPVC,HDPE,ASTM, G.I /CI pipes line etc along with required fittings & specials and construction of valve chamber,, bore well platform,individual house hold connection, Drinking Water supply provision to School / AWC / G.P. Office, installation of submersible pump with motor in deep Tube well etc.as per detail scope of work & technical specification, quantity of work mention in Schedule-I in DTCN and in ( Annexure-A to D). Materials as required shall be supplied by the Contractor as per terms and condition of DTCN & all dimensions are as per Schedule-I in DTCN and as per direction of Engineer in Charge . All work shall be completed in such a manner that all house hold of entire village will get required quantity of drinking water with residual head of 7m without any likage in the entire PWS system as per direction of Engineer-in-charge.
Construction of 30,000 LTR ESR WITH 10M STAGING Supplying of all labour,T&P,material including taxes for soil testing ,supply of design, drawing, construction,errection,testing & commissioning etc. of RCC elevated storage reservoir of 30,000 ltrs capacity with necessary staging height of 10 mtr consisting of cylindrical container with minimum 6 nos RCC columns and circular dome with full raft using CC M-25 with RCC stair case as per approved drawing,supplying, fitting & fixing of 80 mm medium grade GI pipe Tata/Jindal/Sail make confirming to IS specification of required length from production well to ESR & ESR to rising main including in-let,out-let,over flow & washing line of ESR,use of 32 mm GI pipe for Gallary and vertical post. and Aluminium ladder inside and outside the ESR,CI puddle collar,0.6 m dia CI manhole cover at dome , RCC vent with brass jally, lightening arrestor and water level indicator etc. complete as per direction of the Engineer - in- Charge. (The contractor is to approve all structural design & drawing from State Technical Agency IGIT,Saranga /CET,BBSR /VSSUT,Burla /NIT,Rourkela/IIT,BBSR/PMEC,Berhampur at his own cost)
Supplying Labour, Materials and T&P for Laying of pipelines, Construction of valve Chambers, compound wall construuction of 50 KL Capacity ESR with 12 mtr staging ,pumping unit installation,Providing 100% functional house tape connections etc. in connection with to PWS to Satapandia under Kukudakhandi Block.
Supplying all materials labour T&P for construction of Compound wall for Pump House .Laying, testing and commissioning of Rising main & Distribution system pipe line such as UPVC,HDPE,ASTM, G.I /CI pipes line etc along with required fittings & specials and construction of valve chamber, bore well platform,individual house hold connection,, installation of submersible pump with motor in deep Tube well etc.as per detail scope of work & technical specification, quantity of work mention in Schedule-I in DTCN and in ( Annexure-A to C). Materials as required shall be supplied by the Contractor as per terms and condition of DTCN & all dimensions are as per Schedule-I in DTCN and as per direction of Engineer in Charge . All work shall be completed in such a manner that all house hold of entire village will get required quantity of drinking water with residual head of 7m without any likage in the entire PWS system as per direction of Engineer-in-charge.
Construction of 50,000 LTR ESR WITH 12M STAGING Supplying of all labour,T&P,material including taxes for soil testing ,supply of design, drawing, construction,errection,testing & commissioning etc. of RCC elevated storage reservoir of 50,000 ltrs capacity with necessary staging height of 12 mtr consisting of cylindrical container with minimum 6 nos RCC columns and circular dome with full raft using CC M-25 with RCC stair case as per approved drawing,supplying, fitting & fixing of 80 mm medium grade GI pipe Tata/Jindal/Sail make confirming to IS specification of required length from production well to ESR & ESR to rising main including in-let,out-let,over flow & washing line of ESR,use of 32 mm GI pipe for Gallary and vertical post. and Aluminium ladder inside and outside the ESR,CI puddle collar,0.6 m dia CI manhole cover at dome , RCC vent with brass jally, lightening arrestor and water level indicator etc. complete as per direction of the Engineer - in- Charge. (The contractor is to approve all structural design & drawing from State Technical Agency IGIT,Saranga /CET,BBSR /VSSUT,Burla /NIT,Rourkela/IIT,BBSR/PMEC,Berhampur at his own cost)
Documentation charges
MANOJ KUMAR SINGH
SANJAY KUMAR SETHY
POONAM BIHANI
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.47 MB
BOQ_362076.xls
BOQ • 0.28 MB
A01DTCNKumarpur.pdf
Tender Documents • 0.91 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .