Executive Engineer, RWS & S Division,Guntur
Guntur
Augmentation of PWS Scheme in Pedakakani Village of Pedakakani Mandal of Est.Cost Rs.25.00 Lakhs
960123
12 ZPGF 15th Finance Tide (DW) 2026-27 EE RWS S Guntur
OPEN - NCB
Water Supply
GUNTUR, ANDHRA PRADESH
7 documents required · 7 mandatory
₹744
₹21,000
1 Sept 2026
11 Jul 2026
11 Jul 2026
Supply and delivery of 140mm dia HDPE 6 Kg.cm2 Pipe line as per IS 4984/2016 including cost, conveyance for 1.00 Rmt , the rate including overheads and contractor's profit @13.615%
Supply and delivery of 110mm dia HDPE 6 Kg.cm2 Pipe line as per IS 4984/2016 including cost, conveyance for 1.00 Rmt , the rate including overheads and contractor's profit @13.615%
Supply and delivery of 90mm dia HDPE 6 Kg.cm2 Pipe line as per IS 4984/2016 including cost, conveyance for 1.00 Rmt , the rate including overheads and contractor's profit @13.615%
Supply and delivery of 75mm dia HDPE 6 Kg.cm2 Pipe line as per IS 4984/2016 including cost, conveyance for 1.00 Rmt , the rate including overheads and contractor's profit @13.615%
Earth work excavation for Pipe line trenches 140mm dia HDPE 6kg /cm2 (2/3 machinery and 1/3 manual ) in all soils except rocky soils including lowering , laying and jointing of pipes with required fittings /specials true to alignment and gradient, refilling with already excavated earth, watering ,tamping and removing surplus earth and testing to required hydraulic test pressure etc.complete excluding cost of specials/fittings for finished item of work The rate is inclusive of cost of overheads and contractors profit @13.615% .
Earth work excavation for Pipe line trenches 110mm dia HDPE 6kg /cm2 (2/3 machinery and 1/3 manual ) in all soils except rocky soils including lowering , laying and jointing of pipes with required fittings /specials true to alignment and gradient, refilling with already excavated earth, watering ,tamping and removing surplus earth and testing to required hydraulic test pressure etc.complete excluding cost of specials/fittings for finished item of work The rate is inclusive of cost of overheads and contractors profit @13.615% .
Earth work excavation for Pipe line trenches 90mm dia HDPE 6kg /cm2 (2/3 machinery and 1/3 manual ) in all soils except rocky soils including lowering , laying and jointing of pipes with required fittings /specials true to alignment and gradient, refilling with already excavated earth, watering ,tamping and removing surplus earth and testing to required hydraulic test pressure etc.complete excluding cost of specials/fittings for finished item of work The rate is inclusive of cost of overheads and contractors profit @13.615% .
Earth work excavation for Pipe line trenches 75mm dia HDPE 6kg /cm2 (2/3 machinery and 1/3 manual ) in all soils except rocky soils including lowering , laying and jointing of pipes with required fittings /specials true to alignment and gradient, refilling with already excavated earth, watering ,tamping and removing surplus earth and testing to required hydraulic test pressure etc.complete excluding cost of specials/fittings for finished item of work The rate is inclusive of cost of overheads and contractors profit @13.615% .
Horizontal drilling the bore under the road crossing from initial size of 25mm dia to 180mm dia step by step including labour , fuel ,hire charges of equipment , including overheads & contractor's profit @ 13.615%
Skilled labour , Machinery , braker and concrete saw cutter for cutting open road surfaceand depositing on banks with initial lead and lift etc. including overheads & contractor's profit @13.615%
Sand filling in cutting portion of road surface including watering and ramming , cost and conveyance of all materials and labour charges ,including overheads & contractors profit @13.615%
Vibrated Cement concrete (1:2:4) using 20mm m/c chips for filling of cutting portion of road surface including cost and conveyance of all material and labour charges, including overhead& contractor's profit @13.615%
Total Number of item Tweleve (12) only
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
NIT Vol - I-Pedakakani.doc
TENDER_DOCUMENT • 0.17 MB
NITVol -II-Pedakakani.doc
TENDER_DOCUMENT • 0.14 MB
Pedakakani Schedule- 25.00 Lakhs.xlsx
TENDER_DOCUMENT • 0.06 MB
Ponnuru AS.pdf
TENDER_DOCUMENT • 1.08 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .