| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹143.3 CrAccepted-AOC 5TH FLOOR ALPHA PLAZA K P VALLON ROAD KADAVANTHRA KOCHI KERALA PIN 682020 | KOCHI | ERNAKULAM | KERALA | 682020 | ₹143.3 Cr Quoted ₹143.6 Cr | L1 | Accepted-AOC First Lowest |
| 2 | L2₹143.6 CrRejected-AOC NOT SPECIFIED | ₹143.6 Cr | L2 | Rejected-AOC Second Lowest |
| 3 | L3₹165.1 CrRejected-AOC KANNUR | KERALA | 670001 | ₹165.1 Cr | L3 | Rejected-AOC Third Lowest |
Tender Value
₹127.8 Cr
EMD Value
₹5 L
Closing Date
5 Aug 2022, 3:00 pmClosed
Project Director
The Project Director, Kerala Road Fund Board, Project Management Unit, Ground Floor, BSNL Office Building at CGM(O), Doorsanchar Bhavan, PMG Junction Trivandrum-695033
Construction
2021_KRFB_463035_2
PWD/KR/TR/96567/2021_5_1/1
Open Tender
Civil Works - Bridges
545 days
Thrissur
Please refer Tender documents.
7 documents required · 7 mandatory
₹19,518
Yes
₹5 L
Yes
PMU KRFB, Thiruvananthapuram
13 Oct 2023
19 Jul 2022
9 Aug 2022
19 Jul 2022
5 Aug 2022
19 Jul 2022
26 Jul 2022
Amount
APPENDIX A-ADDITIONAL INVESTIGATION
56.1.a:Mobilization including transportation of all necessary plant and equipment's and materials of boring, field testing and sampling and demobilization after completing the work - For machine boring
56.2.a:Setting up boring at each bore hole locations including carrying all necessary plant, equipment and materials of boring and field tests and collection of samples at each bore hole location - For machine boring.
56.3.a.1:Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata upto 10m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For ordinary soil.
56.3.a.2:Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata upto 10m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For under water.
56.3.b.1:Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata next 10m and upto a depth of 20m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For ordinary soil.
56.3.b.2:Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata next 10m and upto a depth of 20m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For under water.
56.3.c.1:Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata next 10m and upto a depth of 30m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For ordinary soil.
56.3.c.2:Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata next 10m and upto a depth of 30m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For under water.
56.3.d.1:Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata above 30m depth including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For ordinary soil.
56.3.d.2:Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata above 30m depth including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For under water.
56.5.a:Boring through all classes of rock excluding hard rocks having N value greater than 50 using tungsten carbide drilling bit - In land
56.5.b:Boring through all classes of rock excluding hard rocks having N value greater than 50 using tungsten carbide drilling bit - In Water
56.4:Boring through all type of hard rock or similar refusal strata of N value greater than 50 using diamond core drilling bit for in land under water and banks of river.
56.8:Recovering disturbed samples and preserving the same in air tight sample containers including waxing labelling packing storing including cost of containers as per IS Code.
56.12.a:Total station surveying and preparation of site plan - Plain and open area without hindrance to line of sight with 1 m contour intervals , with 5m x 5m interval.
56.11.a:Compilation of all field data with recommendation for a suitable foundation after conducting necessary lab test (report in triplicate) - Machine boring for 5 bore holes.
56.11.c:Compilation of all field data with recommendation for a suitable foundation after conducting necessary lab test (report in triplicate) - Machine boring - Extra for additional set for bore holes exceeding 5 nos.
OD33915/2021-2022:Testing charges for CBR test of soil samples collected from the site in the laboratory including the charges of labour engaged for conducting the test in the lab etc including the collection of subgrade soil sample carefully by excavating pit for laboratory test and refilling back and compacting the excavated pit to lines and levels with excavated materials as directed by the departmental officers at site
56.14.a:Cross sectional details - River.
56.15.a:Hydraulic Velocity Calculation - River.
OD76591/2021-2022:Hire charges for providing 1 no of 2nd Class boat with 1 boatman for conveying the departmental staff and labour engaged from the banks to platform and back etc.
56.9.1:Erecting platform over 2 nos of 2nd Class Boat using Mango wood planks of not less than 30 mm thick, Mango wood joists of 100 mm x 70 mm at 60 cm intervals including labour and hire of all materials and dismantling the platform after completion of work etc complete. excluding hire of boats (A Platform of minimum size 6.00 m x 5.00 m will be required)
OD76654/2021-2022:Conducting Traffic survey at two stations for 7 days,24 hours continuously including hire charges of shed and furniture.labour charges of survey assistants, cost of stationaries etc complete and compiling the data and submitting the same in hard and soft copy etc as per the direction of the department officers at site
APPENDIX B - BRIDGE PROPER
2.3.2.A:Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness In area of light jungle - By Mechanical Means
2.4.2.A:Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres Cement Concrete Grade M-15 & M-20 - By Mechanical Means
OD26766/2021-2022::Providing platform (pontoon steel work rivetted and bolted in build up section etc) trussed and framed work with M.S and iron plates etc, straightening cutting fabrication and hoisting including applying one coat of iron primer for pontoon including cost of materials labour charges, current charges for welding etc and launching in to the river and mobilization charges to the pile point and anchoring the same in to the required possession including cost of iron rope and labour charges and hire for motor boat marine type having engine cover 370 to 411 and higher of winch chain block etc and all other incidental charges including maintaining, lighting, night watching etc complete
OD65361/2021-2022:Forming temporary island of the size 15.00X12.00X3.50 and outer ring bund of 75cm width by driving downfull size coconut piles 2.50m below bed level at 80 c/c on both side of ring bund and braced with 1/4 split coconut wailing pieces 1.50m c/c around with double layer of ettamat fixed to bamboo frame using bamboo reapers with 30cm c/c on both ways and filling with inner portion of the bund with contractors own earth cut, conveyed and spreading in layers compacting with rammer with all leads and lifts etc complete and maintaining island throughout the period of construction and dismantling and removing the bund after the completion of the work etc as per the direction of departmental officers at site
12.22:Providing Steel Liner 10mm thick for Curbs and 6 mm thick for Steining of Wells including Fabricating and Setting out as per Detailed Drawing.
OD26776/2021-2022:Bored cast-in-situ M40 grade R.C.C. Pile Using Batching Plant, Transit Mixer and Concrete Pump excluding Reinforcement complete as per Drawing and Technical Specifications and removal of excavated earth with all lifts and lead upto 1000 m.Pile diameter-1200 mm
OD33273/2021-2022:Null Bored cast-in-situ M40 grade R.C.C. Pile Using concrete mixer excluding Reinforcement complete as per Drawing and Technical Specifications and removal of excavated earth with all lifts and lead upto 1000 m.Pile diameter-800 mm
12.39:Providing and laying of PCC M15 leveling course 100 mm thick below the pile cap
OD33274/2021-2022:Cement concrete for reinforced concrete in pile cap complete as per drawing and Technical specification RCC M40-using Batching plant,Transit mixer and concrete pump
12.40:Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications
12.1.B.1:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Ordinary Soil - Depth upto 3m - Mechanical Means
OD78219/2021-2022:Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications RCC Grade M40 - With Batching Plant, Transit Mixer and Concrete Pump
OD33276/2021-2022:Plain/Reinforced cement concrete in substructure complete as per drawing and technical specifications RCC Grade M50-With Batching plant,Transit mixer and concrete pump Height upto 5m
13.6:Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and Technical Specifications
13.8:Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V : 20H towards drawing foce.Complete as per drawing and Technical Specifications
OD33277/2021-2022:Supplying,fitting and fixing in position true to line and level POT-PTFE bearing consisting of a metal piston supported by a disc or unreinforced elastomer confined within a metal cylinder, sealing rings,dust seals,PTFE surface sliding against stainless steel mating surface, complete assembly to be cast steel/fabricated structural steel, metal and elastomer elements to be as per IRC:83 Part I & II respectively and other parts conforming to BS:5400,section 9.1 & 9.2 and clause 2006 of MoRTH specifications complete as per drawing and approved technical specifications
14.22:Providing and laying of a strip seal expansion joint catering to maximum horizontal movement upto 70 mm, complete as per approved drawings and standard specifications to be installed by the manufacturer/supplier or their authorised representative ensuring compliance to the manufacturer's instructions for installation
14.9:Drainage Spouts complete as per drawing and Technical specification
14.1G.1.A:"Furnishing and Placing PSC Grade M50 Using Batching Plant, Transit Mixer, and Concrete Pump as per drawing and Technical Specification. For cast-in-situ box girder, segmental construction and balanced cantilever- Height upto 5m"
OD33278/2021-2022:providing MS hollow steel piles at the bridge site and full size of pipe is 15m to 18m long, 600mm dia and 8mm thick including fabricating and setting out as per detailed drawings including all hire charges etc complete as per the direction of departmental officers at site
OD33279/2021-2022:providing extra platform for staging as per the attached design drawing including cost of all materials , hire charges , labour cost , machineries etc complete as per the direction of dept officers at site
OD33280/2021-2022:Driving down 600mm dia MS hollow steel piles 8mm thick already fabricated to the required depth using vibro hammer and plugging the top of steel pile with pcc m15 grade concrete 0.30 m depth including all hire charges and removing MS steel piles already driven for the staging purpose by using vibro hammer including removal of concrete inside the steel piles,removing the steel piles fully without leaving any broken or damaged pipes in the lake bed as per the direction of dept officers at site
OD33283/2021-2022:Dredging the lake bed by using sand pumps mounted on the barges or any other suitable method and dumping the spoil with a flow rate of 500m3 slurry per hour with a solid output of not less than 75m3/hour at location already pointed out by dept officers with a lead upto a radial distance of 500m, including hire charge of sand pump, all tools and plants and accessories, fuel charges, idling and mobilisation charges , providing and shifting the pipe lines including all labour charges, incidental charges etc complete for a depth upto -3.50m with a tolerence of +/-20cm
14.1E.2.2.A:"Furnishing and Placing PSC Grade M40 Using Batching Plant, Transit Mixer, and Concrete Pump as per drawing and Technical Specification. For T-beam & slab - Height upto 5m
14.1A.2:Furnishing and Placing Reinforced Cement Concrete Grade M20 Using Batching Plant, Transit Mixer and Concrete Pump in super-structure as per drawing and Technical Specification
14.2:Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications
14.3:High tensile steel wires/strands including all accessories for stressing, stressing operations and grouting complete as per drawing and Technical Specifications
OD33284/2021-2022:supplying and fixing 150mm dia PVC pipe fixing inside the footpath of psc deck slab including cost of all materials , labour charges for laying, fixing etc complete
OD76109/2021-2022:Flooring with precast chequered cement tiles 22 mm thick dark shade using ordinary cement in cement mortar 1:3 and pointing with coloured cement including all cost of materials and labour charges etc complete as per the direction of departmental officers at site
5.15:Providing and laying 25 mm thick mastic asphalt wearing course with paving grade bitumen (VG - 30) meeting the requirements given in table 500-40, prepared by using a mastic cooker and laid to the required level and slope after cleaning the surface, including providing an antiskid surface with bitumen precoated fine grained hard stone chipping of 13.2 mm nominal size at the rate of 0.005cum per 10 sqm and at an approximate spacing of 10 cm center to center in both directions, pressed into the surface when the temperature of surfaces is not less than 1000C, protruding 1 mm to 4 mm over mastic surface, all complete as per clause 516
5.6.2.b:Providing and laying bituminous concrete with 100-120 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder (NRMB) @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects For Grading -II (13.2 mm Nominal size).
8.13:Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads on Bituminous Surface @ 250 gms per sqm area, the thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35. The finished surface to be level, uniform, and free from streaks and holes.
8.8:Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces
APPENDIX C - APPROACH ROAD,SIDE PROTECTION & RIVER PROTECTION
2.3.2.A:Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness In area of light jungle - By Mechanical Means
2.1.2:Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 metres and earth filling in the depression/pit. Girth from 600 mm to 900 mm
2.4.2.A:Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres Cement Concrete Grade M-15 & M-20 - By Mechanical Means
2.4.4.B:Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres Dismantling Stone Masonry - Rubble stone masonry in cement mortar.
3.16:Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2.
3.17:Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2.
4.3.A:Laying and spreading available soil in the sub-grade on a prepared surface, pulverising, mixing the spread soil in place with rotavator with 3 percent slaked lime having minimum content of 70 percent of CaO, grading with a motor grader and compacting with the road roller at OMC to the desired density to form a layer of improved subgrade Lime Stabilisation for Improving Sub-grade - By Mechanical Means
4.1.B.1:Construction of granular sub-base by providing graded material, spreading in uniform layers with a motor grader on a prepared surface, mixing by mix in-place method with rotavator at OMC, and compacting with a vibratory roller to achieve the desired density, complete as per clause 401. Grading-V - For sub-base cum drainage layer - Mix in Place Method
4.12:Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
5.1.a:Providing and applying primer coat with bitumen emulsion ( SS) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 - 1.0 kg/sqm using mechanical means.
5.2.a:Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
5.3.2.b:Providing and laying bituminous macadam with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using bitumen VG 30 crushed aggregates of specified grading premixed with a bituminous binder, transported to the site, laid over a previously prepared surface with paver finisher to the required grade, level, and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction. Grading II - (19 mm nominal size )
5.6.2.b:Providing and laying bituminous concrete with 100-120 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder (NRMB) @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects For Grading -II (13.2 mm Nominal size).
55.16:Providing and fixing guard post Providing and fixing guard post of size 200mmx200mm, 1400mm long, 800mm above ground level and 600mm below GL. casted in M20 Grade concrete reinforced with 4 nos of 8mm dia longitudinal bars and 6mm dia stirrups @ 100mm c/c, firmly fixed in position by means of foundation of size 0.5mx0.5mx0.7m in M15 grade concrete below ground level including painting 2 coats on exposed surface with synthetic enamel paint in alternate white & black band 20cm wide
8.23.B:Providing and erecting a "Thrie" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 85 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 2 m high with 1.15 m below ground level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a space of channel section 150 x 75 x 5 mm, 546 mm long complete as per clause 811.
8.13:Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads on Bituminous Surface @ 250 gms per sqm area, the thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35. The finished surface to be level, uniform, and free from streaks and holes.
8.35:Providing and fixing reflective road studs (Raised Pavement Marker) of ' category A' made out of ASA/HIPS/ABS moulded body with shanks and conforming to ASTM D 4280, strong enough to support a load of more than 13.635 T when tested in accordance with ASTM D 4280, reflective panel confirming to ASTM D 788, and reflectivity conforming to clause 804.4. including installation, drilling, fixing with adhesive etc. with 2 years warranty for the road stud as well as for in field performance as per clause 804.7.3 Road Markers/Road Stud with Lense Reflector :-
55.14:Providing and fixing retro-reflectorised ceramic tilesProviding and fixing retro-reflectorised ceramic tiles of size 10cmX20cm using High Intensity Micro Prismatic (Type IV) grade sheeting with 7 years warranty fixed over Ist quality ceramic glazed tiles including cost of glue, cutting charges, fixing with suitable adhisive on concrete or other surface etc complete.
55.11.2:Flexible Hazard Marker 30cmx45cm Hazard Marking on the surface of trees,concrete,Masonry etc using Aluminium backed flexible presmatic (AFP) SHEETING CONSISTING OF Yellow colored flexible presmatic sheeting non-metallic presmatic lens as recto reflective elements and conforming to ASTM D 4956-09 Type IV specification values for reboundable sheetig with printed arrow /Slant line pattern in black colour. AFP sheeting laminated at the back with a 50 micron thick Aluminium (AI) foil with pressure sensitive adhesive and liner and shall not crack when tested for flexibility as per section S2.2.2 of ASTM D 4956-09 including application on any surface with adhesive as recommended by manufacturer and ceiling the edges all around with epoxy based structural adhesive to resist any peel-off.
55.12:Providing and fixing of median marker Providing and fixing of median marker made of tough, high impact resistant, injection-molded, thermoplastic body having a mnimum Notched Izod Impact strength value of 600J/m at room temperature, when tested accordance with ASTM D256 and shall retain at least 70% of this value when subjected to accelerted weathering for 1000hrs as per ASTM G155 or UL 746C. The Median marker shall have, fluorescent yellow color retro-reflective sheeting min 10cmx10cm/10cm dia size with reflectivity values as per IRC:67 and ASTM D4956 type XI specifications , edge protected with no exposed edges to prevent edge lifting, vandalism, sheeting damage, etc. and fixed by a combination of epoxy adhesive and anchoring
8.4.2:Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign with 7years warranty manufactured as per IRC :67 made of Type IV micro prismatic grade sheeting vide clause 801.3.3 fixed over aluminium sheeting, 2 mm thick/ aluminium composit material sheeting 4 mm thick with suitable back supporting frame of MS angle 25x25x3 and supported on GI pipe pole 50mm NB confirming to IS 1239 firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete min size 45 cm x 45 cm x 60 cm, 60 cm below ground level including painting all exposed surface with 2 coats of epoxy painting over epoxy primer and as per approved drawing and clause 801 including lettering symbols etc. 60 cm equilateral triangle
8.5:Providing and fixing of direction and place identification retro-reflectorised sign with 7 years warranty manufactured as per IRC :67 made of Type IV micro prismatic grade sheeting fixed over aluminium sheeting, 2 mm thick/ aluminium composit material sheeting 4 mm thick with area not exceeding 0.9 sqm, with suitable back supporting frame of MS angle 40x40x6 and supported on GI pipe pole 50mm NB confirming to IS 1239 firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete min size 45 cm x 45 cm x 60 cm, 60 cm below ground level including painting all exposed surface with 2 coats of epoxy painting over epoxy primer and as per approved drawing and clause 801 including lettering symbols etc.
12.1.B.1:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Ordinary Soil - Depth upto 3m - Mechanical Means
12.1.5.B.1:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Marshyn Soil - Depth upto 3 m - Mechanical Means -
12.4:Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
12.8.A.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. PCC Grade M15
12.8.1.C:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer - (Without formwork)
12.8.1.C.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer
12.8.E.2.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. RCC Grade M25 - With Batching Plant, Transit Mixer and Concrete Pump
12.40:Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications
15.12:Providing and construction of a gabian structure for retaining earth with segments of wire crates of size 7 m x 3 m x 0.6 m each divided into 1.5 m compartments by cross netting, made from 4 mm galvanised steel wire @ 32 kg per 10 sqm having minimum tensile strength of 300 Mpa conforming to IS:280 and galvanizing coating conforming to IS:4826, woven into mesh with double twist, mesh size not exceeding 100 x 100 mm, filled with boulders with least dimension of 200 mm, all loose ends to be tied with 4 mm galvanised steel wire
15.6:Laying of a geotextile filter between pitching and embankment slopes on which pitching is laid to prevent escape of the embankment material through the voids of the stone pitching/cement concrete blocks as well as to allow free movement of water without creating any uplift head on the pitching.
14.7:Construction of RCC railing of M30 Grade in-situ with 20 mm nominal size aggregate, true to line and grade, tolerance of vertical RCC post not to exceed 1 in 500, center to center spacing between vertical post not to exceed 2000 mm, leaving adequate space between vertical post for expansion, complete as per approved drawings and technical specifications.
14.16:Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 sqm.
8.22:Provision of an Reinforced cement concrete crash barrier at the edges of the road, approaches to bridge structures and medians, constructed with M-20 grade concrete with HYSD reinforcement conforming to IRC:21 and dowel bars 25 mm dia, 450 mm long at expansion joints filled with pre-moulded asphalt filler board, keyed to the structure on which it is built and installed as per design given in the enclosure to MOST circular No. RW/NH - 33022/1/94-DO III dated 24 June 1994 as per dimensions in the approved drawing and at locations directed by the Engineer, all as specified
14.8:Providing , fitting and fixing mild steel railing complete as per drawing and Technical
8.1.B:Construction of cement concrete kerb with top and bottom width 115 and 165 mm respectively, 325 mm high in M 20 Grade PCC Using Concrete Batching and Mixing Plant on M-10 grade foundation 150 mm thick, foundation having 50 mm projection beyond kerb stone, kerb stone laid with kerb laying machine, foundation concrete laid manually, all complete as per clause 409
8.8:Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces
14.11:Reinforced cement concrete approach slab including reinforcement and formwork complete as per drawing and Technical specification.
OD33300/2021-2022:supplying and driving down coconut pile 8m length 75cm c/c 200mm to 300mm dia to approved lines and levels through various strata including cost , conveyance,all hire and labour for fixing staging platform and all other appliances necessary for pile driving,after pointing the bottom end upto the required depth below GL etc.complete as per the direction of dept officers
OD33303/2021-2022:cutting and removing excess length of coconut pile to lines and levels and removing the cut end of pile and stacking within 150m etc complete as per direction of dept officers
OD33304/2021-2022:Dry rubble masonry including cost of materials and conveyance etc complete for retaining wall
OD33394/2021-2022:STREET POLE LIGHT AND FIXTURES-Supply & installation of MS swaged pole of9.0mtrs high made out of 3.6M of 139mm dia 4.85mm thick, 3.6M of 114mm dia 4.5mm thick and 1.8 M of90mm dia 3.65mm thick pipe with double arm over hang of 1.45 M long tilted at an angle of 15 degree as perdrawing/ detail. The rate shall also include cost of marshalling box with terminal block wiring from themarshalling box up to the light fixture and with all necessary wiring and fixing accessories all complete asrequired. GI.Pole shall be of approved make. The pole shall be provided with two coats of red oxide paint andfinished with two coats of enameled paint of approved quality and colour
3.6:Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m
MARYMATHA INFRASTRUCTURE PVT LTD
THE URALUNGAL LABOUR CONTRACT CO-OPERATIVE SOCIETY
Bidder Name
CHERIAN VARKEY CONSTRUCTION CO PVT LTD
THE URALUNGAL LABOUR CONTRACT CO-OPERATIVE SOCIETY
MARYMATHA INFRASTRUCTURE PVT LTD
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid