Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹19.1 LAccepted-AOC | 1 | Accepted-AOC L1 Agreement executed | |
| 2 | Rejected-Technical | - | Rejected-Technical L3 | |
| 3 | Rejected-Technical OORAKAM VENKULAM BERUVALLUR GRAMA KERALA KL | ERNAKULAM | KERALA | 680667 | - | Rejected-Technical L2 |
| Sl No | Description | Qty | Unit | P MOHAMMED L2 | BEERANKUTTY K. L1 | oruvil construction company L3 |
|---|---|---|---|---|---|---|
| 1.00CONSERVATION OF CANAL | ||||||
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 253 | cum | 200 ₹50,600 Lowest | 212.99 ₹53,886.47 | 220.3 ₹55,735.9 |
| 1.00 | 51.2.3:Filling with Quarry Muck Filling up low lying and water logged areas with local material/ quarry muck, spreading in layers, leveling the top at site and consolidation by ramming, etc complete for improving the CBR value of subgrade | 36.8 | cum | 800 ₹29,440 Lowest | 815.88 ₹30,024.38 | 843.8 ₹31,051.84 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 55.2 | cum | 6,800 ₹3,75,360 | 6,558.58 ₹3,62,033.62 Lowest | 6,783.2 ₹3,74,432.64 |
| 1.00 | 4.1.6:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded
stone aggregate 40 mm nominal size derived from natural sources) | 142.6 | cum | 7,200 ₹10,26,720 | 6,915.47 ₹9,86,146.02 Lowest | 7,152.8 ₹10,19,989.28 |
| 1.00 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 10.35 | cum | 7,800 ₹80,730 | 7,635.91 ₹79,031.67 Lowest | 7,897.6 ₹81,740.16 |
| 1.01 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 460 | sqm | 300 ₹1,38,000 Lowest | 319.25 ₹1,46,855 | 330.1 ₹1,51,846 |
| 1.01 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 2.4 | cum | 9,000 ₹21,600 | 8,671.68 ₹20,812.03 Lowest | 8,969.2 ₹21,526.08 |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 2,248.74 | kilogram | 100 ₹2,24,873.5 | 92.94 ₹2,08,997.43 Lowest | 96.13 ₹2,16,170.9 |
| 1.01 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | 16 | sqm | 850 ₹13,600 | 794.71 ₹12,715.36 Lowest | 821.97 ₹13,151.52 |
Tender Value
₹21.2 L
EMD Value
₹50,000
Closing Date
28 Oct 2025, 9:00 amClosed
ASSISTANT ENGINEER PERUVALLUR GP
OFFICE OF ASSISTANT ENGINEER PERUVALLUR GP
PERUVALLUR GP_ANNUAL PLAN 2025- 26_CONSERVATION OF ENAVOOR MOOLATH PALLIYALI CANAL-NAGARA SANCHAYA PROJECTPROJECT NO.384/26-General Civil Work ROAD CONCRETING-PROJECT NO..422/26-General Civil Work
2025_LSGD_810859_7
AE/LID/EW/PVLR/T1/2025-26
Open Tender
Civil Works - Canal
Item Rate
PERUVALLUR GP
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
₹50,000
28 Feb 2026
17 Oct 2025
31 Oct 2025
17 Oct 2025
28 Oct 2025
17 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1353995.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.22 MB
Tendernotice_2.pdf
PDF • 0.26 MB
Tendernotice_3.pdf
PDF • 0.25 MB
preli.pdf
Tender Documents • 0.26 MB
fot.pdf
Tender Documents • 0.26 MB
affi.pdf
Tender Documents • 0.24 MB
viewsbd.pdf
Tender Documents • 1.74 MB
BOQ_1353995.xls
BOQ • 0.24 MB
epayment.pdf
Tender Documents • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .