Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.4 LAccepted-AOC ASAMANNOOR | DHEMAJI | ASSAM | 787026 | L1 | Accepted-AOC L1 | |
| 2 | L2₹8.5 L+₹10,233.35 (1.22%)Rejected-Finance ASAMANNOOR | GOLAGHAT | ASSAM | 785601 | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | SUGATHAN C V L1 | NANDHU SUGATHAN L2 |
|---|---|---|---|---|---|
| 1.00Compound wall construction for LIFE Flat Housing complex | |||||
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 34.57 | cum | 350 ₹12,099.15 Lowest | 400 ₹13,827.6 |
| 1.00 | OD212473/2025-2026:Data 60.7.1 DRY RUBBLE MASONRY- Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials including labour charge etc complete as per direction of departmental officers at site | 91.6 | cum | 3,980 ₹3,64,568 Lowest | 4,000 ₹3,66,400 |
| 1.00 | 13.33.1:Pointing on stone work with cement mortar 1:3 ( 1 cement : 3 fine sand):Flush/ Ruled pointing | 44.8 | sqm | 400 ₹17,920 Lowest | 400 ₹17,920 Lowest |
| 1.00 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 12.5 | sqm | 386.16 ₹4,827 Lowest | 386.16 ₹4,827 Lowest |
| 1.00 | 5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 4.67 | cum | 9,960 ₹46,463.4 Lowest | 9,980 ₹46,556.7 |
| 1.01 | 51.2.3:Filling with Quarry Muck <br> Filling up low lying and water logged areas with local material/ quarry muck, spreading in layers, leveling the top at site and consolidation by ramming, etc complete for improving the CBR value of subgrade | 12.75 | cum | 900 ₹11,475 Lowest | 900 ₹11,475 Lowest |
| 1.01 | OD160505/2025-2026:Providing and laying 60 mm thick factory made cement concrete interlocking paver block of M - 30 grade made by block making machine with strong vibratory compaction, of approved size, design & shape, laid in required colour and pattern over and including 50 mm thick compacted bed of stoneaggregate, etc. all complete as per the direction of Engineer-in-charge. OD 80/21-22 | 170 | sqm | 1,060 ₹1,80,200 Lowest | 1,060 ₹1,80,200 Lowest |
| 1.01 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 1.3 | cum | 9,235.97 ₹11,997.53 Lowest | 9,235.97 ₹11,997.53 Lowest |
| 1.01 | 50.6.2.1:Solid block masonry using pre cast solid blocks (Factory made) of size 30x20x15 cm or nearest available size confirming to IS 2185 part I of 1979 for foundation and plinth with thickness 15cm in: CM 1:6 ( 1 cement :6 coarse sand) etc complete | 11.26 | cum | 6,831.14 ₹76,891.31 Lowest | 6,831.14 ₹76,891.31 Lowest |
Tender Value
₹8.5 L
EMD Value
₹21,172
Closing Date
18 Aug 2025, 6:00 pmClosed
Assistant Engineer
O/O Assistant Engineer LID AND EW SECTION NELLIKUZHY GP
387/2025-26-Compound wall construction for LIFE Flat Housing comple
2025_LSGD_784456_1
ET 05-03/2025-26/AE/LSGD/NZY
Open Tender
Civil Works - Others
Item Rate
NELLIKKUZHI
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,870
₹21,172
3 Nov 2025
11 Aug 2025
20 Aug 2025
11 Aug 2025
18 Aug 2025
11 Aug 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .