Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.8 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹6.1 L+₹28,975.10 (5.00%)Rejected-AOC | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | K V VALSARAJ L1 | Umesh M N L2 |
|---|---|---|---|---|---|
| 1.00Detailed estimate | |||||
| 1.00 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 140 | sqm | 16.97 ₹2,375.8 Lowest | 17.82 ₹2,494.8 |
| 1.00 | 15.31:Dismantling tiled roofing with battens, boarding etc. complete including stacking of serviceable material and disposal of unserviceable material within 50 metres lead. | 111.22 | sqm | 202.66 ₹22,539.85 Lowest | 212.79 ₹23,666.5 |
| 1.00 | 15.2.2:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 or leaner mix ( including equivalent design mix) | 4.11 | cum | 1,450.8 ₹5,956.98 Lowest | 1,523.34 ₹6,254.83 |
| 1.00 | 15.14.1:Dismantling wood work in frames, trusses, purlins and rafters up to 10 metres span and 5 metres height including stacking the material within 50 metres lead:Of sectional area 40 square centimetres and above | 1.13 | cum | 4,300.66 ₹4,855.45 Lowest | 4,515.69 ₹5,098.21 |
| 1.00 | 2.28.1:Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m.All kinds of soil | 28 | sqm | 32.94 ₹922.32 Lowest | 34.59 ₹968.52 |
| 1.01 | 15.56:Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead. | 1.45 | sqm | 52.74 ₹76.47 Lowest | 55.38 ₹80.3 |
| 1.01 | 15.12.1:Dismantling doors, windows and clerestory windows (steel or wood ) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead:Of area 3 sq. metres and below | 11 | each | 354.25 ₹3,896.75 Lowest | 371.96 ₹4,091.56 |
| 1.01 | 50.9.13.1:Supplying and fixing Anjily wood wrought and put up for roof members including cost and conveyance of materials etc. complete . | 0.28 | cum | 90,582.79 ₹25,182.02 Lowest | 95,111.93 ₹26,441.12 |
| 1.01 | 50.9.13.4:Supplying and fixing Dept. wood wrought and put up for roof members including cost and conveyance of materials etc. complete. | 0.85 | cum | 9,277.79 ₹7,895.4 Lowest | 9,741.68 ₹8,290.17 |
Tender Value
₹5.8 L
EMD Value
₹14,486
Closing Date
9 Oct 2025, 11:00 amClosed
Assistant Executive Engineer
PWD Buildings Subdivision Kannur
K A P 4 T H B A T T A L I O N MANGATTU PARAMBA Quarters No 51 52 Maintenance works to Quarters No 51 52
2025_PWD_803939_1
PWD/BLDG/9093/2025-2026
Open Tender
Civil Works - Buildings
Item Rate
180 days
KANNUR
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,280
Yes
₹14,486
Yes
5 Nov 2025
29 Sept 2025
10 Oct 2025
29 Sept 2025
9 Oct 2025
29 Sept 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1336771.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .