Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.3 CrAccepted-AOC LADY LADY DISTY SUNAM SUB MINAR | SANGRUR | PUNJAB | 148001 | ₹2.3 Cr | L1 | Accepted-AOC Lowest Value |
| 2 | L2₹2.3 Cr+₹8,394 (0.04%)Rejected-Finance 47 C MODEL TOWN EXTENSION LUDHIANA PB | LUDHIANA | PUNJAB | 141001 | ₹2.3 Cr+₹8,394 (0.04%) | L2 | Rejected-Finance Rejected due to high rate. |
| 3 | L3₹2.6 Cr+₹29.1 L (12.7%)Rejected-Finance ABOHAR | ₹2.6 Cr+₹29.1 L (12.7%) | L3 | Rejected-Finance Rejected due to high rate |
Tender Value
₹2.1 Cr
EMD Value
₹4.1 L
Closing Date
22 Nov 2022, 11:00 amClosed
Executive Engineer
Executive Engineer, Bathinda Canal Division, Bathinda
Estimate for New Lining of Kalas Disty RD 7500 - 35025
2022_WR_91800_1
07/22A/2022-23
Open Tender
Civil Works - Canal
Item Rate
42 days
Ludhiana District
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,000
₹4.1 L
Yes
Bathinda
7 Feb 2023
28 Oct 2022
22 Nov 2022
28 Oct 2022
22 Nov 2022
28 Oct 2022
10 Nov 2022
Amount
Ordinary jungle clearance of both banks of running Distributries, minors and drains with discharge upto 1.50 cumecs incuding boundary road.
Excavation in soil (any type) using hydraulic excavator CK 90 with hydraulic excavator of 0.90 cum bucket capacity inlcluding cutting and loading in trolley, trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections including all lifts and combined lead upto 30 m.
Excavation in soil using hydraulic jcb and hydraulic trolley with disposal upto 450 m including cutting and loading in trolley, trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections and transporting to embankment location within all lifts and lead. (lead = 4.64 km )
Earthwork for compaction in 20 cm layers and dressing., Extra for watering the earth., Extra for rolling to specifications.
Dressing of earthwork.
Earthwork for lip cutting for irrigation of channel inclusive of all allowances leads and dressing above upto 1.50 m
Earthwork excavation in foundation, trenches etc. in all kinds of soil where pick jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and side of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within a lead of 30 metres.
Dressing of Side Slopes and prepration of sub grade for lining complete in all respect as per pwd specification.
Laying cement water slurry 1:3, with cement @ 2.25 kg/sqms as on prepared side slopes before laying concrete on side slopes.
Cement concrete lining 75 mm thick or less laid manually for irrigation channel using cement concrete M-15with cement content 325 Kg/cum mixed in automatic computerised batching and mixing plant and transported to site in transit mixer with an average lead of 1 km. For Lining
Cement concrete lining 75 mm thick or less laid manually for irrigation channel using cement concrete M-15with cement content 325 Kg/cum mixed in automatic computerised batching and mixing plant and transported to site in transit mixer with an average lead of 1 km. For Coping
Cement concrete lining 75 mm thick or less laid manually for irrigation channel using cement concrete M-15with cement content 325 Kg/cum mixed in automatic computerised batching and mixing plant and transported to site in transit mixer with an average lead of 1 km. (For Sleeper)
Shuttering for faces of concrete foundations and foundation beam & plinth beam (vertical or battering)
Filling Contraction/Construction Joint with sealing compound complete in all respect
Filling expansion joints with special impervious hot pour 12.5 mm wide.
Extra bitumen painting over concrete surface at joints @ 0.69 kg per Sqm
250 wide LDPE film of 150 micron over sleepers for construction & expansion joints including supply and carriage & loading unloading of all material complete in all respect as per PWD specification and Engineer in Charge.
Providing and Fixing Distance Marks
Earth work involved in dismantling open flume A.P.M. or O.S.M. type outlets with 'H' more than 0.50 m but upto 0.90 m (including excavation, refilling, consolidation and dressing)
Dismantling O.F., A.P.M. or O.S.M. type outlets consisting of total dismantling with 'H' more than 0.50 m but upto 0.90 m.
Extra labour for dressing bricks on O.F. and A.P.M. type outlets with 'H' more than 0.50 m but upto 0.90 m.
PCC 1:4:8 with Stone Ballast 40 mm gauge using concrete mixer volume metric type
First class burnt brick work laid in cement sand mortar 1:3 in foundation and plinth.
RCC M-20 in superstructure
Shuttering for faces of concrete foundations and foundation beam & plinth beam (vertical or battering)
Centering & Shuttering for flat surfaces such as roofs, landings, chajjas, shelves etc.
Cold twisted deformed (Ribbed/ Tor Steel Bar) Bars Fe 500 grade as per IS 1786-1985, for R.C.C works, where not including in the complete rate of RCC including bending and placing in position complete.
KEWAL KRISHAN GOVT CONTRACTOR
VARSHA CONSTRUCTION CO
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .