Tender Value
₹4.2 Cr
EMD Value
₹1 L
Closing Date
5 Sept 2026, 11:30 am
The Superintending Engineer, PWD Buildings Central
PWD Buildings Central Circle Thrissur
GENERAL-CONSTRUCTION OF NEW BUILDING FOR GOVT. TALUK HOSPITAL, N PARAVUR-PHASE II
2026_PWD_865374_1
PWD/BLDG/TR/18617/2024_23_2_1
Open Tender
Civil Works - Buildings
Percentage
540 days
N.Paravur
Please refer Tender documents.
16 documents required · 16 mandatory
₹9,759
Yes
₹1 L
Yes
PWD Buildings Central Circle Thrissur
14 Aug 2026
14 Aug 2026
7 Sept 2026
14 Aug 2026
5 Sept 2026
14 Aug 2026
21 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Sub Structure(Civil work) | |||||
| 1.001 | 2.32:Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. | - | sqm | 9.27 | - |
| 1.002 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 0.8 | cum | 257.63 | ₹206.1 |
| 1.003 | 2.26.1:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil | 0.6 | cum | 131.02 | ₹78.61 |
| 1.004 | 50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete | - | hour | 345.54 | - |
| 1.005 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 0.6 | cum | 7,932.89 | ₹4,759.73 |
| 1.006 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 0.6 | kilogram | 112.43 | ₹67.35 |
| 1.007 | OD60241/2026-2027:Providing and laying in position machine batched and machine mixed design mix M-30 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge - Minimum cement content considered for this item is 340kg/m3. (Note:- cement content obtained as per mix design shall be used by the contractor at the site to obtain the required strength. Excess cement used as per mix design is not payable separately as per circular no.CE/BL/GL/6541/2015 dated 30.08.2017 of the Chief Engineer, PWD Buildings ) - All work up to Plinth level | 0.2 | cum | 10,978.33 | ₹2,195.67 |
| 1.008 | OD60240/2026-2027:Providing MS sheet shoring to the side of the trenches using 6 mm thick steel plate 0.50m width stiffened on edge with 6 mm plate 100 mm width all around and 50 mm MS pipe welded at the longitudinal side of the steel plate driving down vertically to a minimum depth of 0.50m below the bottom level of the proposed excavation and 0.50 m above ground level and suitably braced by ISLB 125x75 mm on side and maintaining the shoring through the period of the construction and removing the same after back filling the area etc. complete as per the direction of engineer in chrage. | 0.8 | per sqm | 1,998.83 | ₹1,599.06 |
| 1.009 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 0.2 | sqm | 386.16 | ₹76.85 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.07 MB
Preli.pdf
Tender Documents • 0.13 MB
Inte.pdf
Tender Documents • 0.08 MB
viewsbd.pdf
Tender Documents • 10.29 MB
mach.pdf
Tender Documents • 0.14 MB
aff.pdf
Tender Documents • 0.03 MB
form.pdf
Tender Documents • 0.01 MB
gst.pdf
Tender Documents • 0.00 MB
ele.pdf
Tender Documents • 0.14 MB
ctronic.pdf
Tender Documents • 0.20 MB
BOQ_1464520.xls
BOQ • 0.59 MB
ITB.pdf
Other Document • 0.09 MB
Epay.pdf
Tender Documents • 0.09 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].