Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 CrAccepted-AOC | ₹1.4 Cr | L1 | Accepted-AOC Lowest Bidder |
| 2 | L2₹2.4 Cr+₹1.0 Cr (72.1%)Rejected-Finance | ₹2.4 Cr+₹1.0 Cr (72.1%) | L2 | Rejected-Finance Financially not Qualified |
Tender Value
Refer Docs
EMD Value
₹50,000
Closing Date
22 Jan 2021, 6:00 pmClosed
Superintending Engineer Project Circle Kannur
Office of the Superintending Engineer Project Circle Irrigation Kannur 670002
PyIP_Rectification work to damaged Aqueduct in main canal near ch 36_000km at Mayyil
2020_Irrig_393788_3
ET/04/SE/IPC/2020-21
Open Tender
Civil Works - Canal
Item Rate
365 days
Mayyil
Please refer Tender documents.
8 documents required · 8 mandatory
₹5,600
Yes
₹50,000
Yes
5 May 2021
11 Jan 2021
28 Jan 2021
11 Jan 2021
22 Jan 2021
11 Jan 2021
Amount
Rectification works to Pillars & bracing
26.28.3 : Chipping of unsound/weak concrete material from slabs, beams, columns etc. with manual Chisel and/ or by standard power driven percussion type or of approved make including tapering of all edges, making square shoulders of cavities including cleaning the exposed concrete surface and reinforcement with wire brushes etc. and disposal of debris for all lead and lifts all complete as per direction of Engineer-In-Charge25 mm average thickness
26.31.1 : Providing, mixing and applying bonding coat of approved adhesive on chipped portion of RCC as per specifications and direction of Engineer-In-charge complete in all respect.SBR Polymer (@10% of cement weight) modified cementitious bond coat @2.2kg cement per sqm of surface area mixed with specified proportion of approvedpolymer
26.33.1 : Providing, mixing and applying SBR polymer (of approved make @ minimum 2% by wt. of cement used) modified plain/reinforced cement concrete for structural members having minimum characteristic compressive strength [with ordinary portland cement, coarse sand and graded stone aggregate of 10mm maximum size in proportion as per design criteria] with specified average thickness.<br> Note: Rates shall be for finished surface area of concrete and shall include the cost of labour, concrete and appropriate approved Super-Plasticiser for rendering concrete as flowable and SBR polymer but shall exclude cost of reinforcement, bond coat, Shear Keys, centering and shuttering, strutting, propping etc (Payment under this item shall be made only after proper wet curing has been done and surface has been satisfactorily evaluated by sounding/tapping with a blunt metal instrument)50mm thick in Grade M 25 with cement content not less than 330 kg per cum
26.32.1 : Providing, mixing and applying SBR polymer (of approved make) modified Cement mortar in proportion of 1:4 (1 cement: 4 graded coarse sand with polymer minimum 2% by wt. of cement used) as per specifications and directions of Engineer-in-charge. Note: Measurement and payment: The pre-measurement of thickness shall be done just after the surface preparation is completed and Payment under this item shall be made only after proper wet curing has been done and surface has been satisfactorily evaluated by sounding / tapping with a blunt metal instrument and/or the 75mm size cube crushing strength at the end of 28 days to be not less than 30 N/Sqmm2).12 mm average thickness.
26.39 : Providing and inserting 12mm dia galvanised steel injection nipple in honeycomb area and along crack line including drilling of holes of required diametre(20mm to 30mm) up to depth from 30mm to 80mm at required spacing andmaking the hole & crack dust free by blowing compressed air, sealing thedistance between injection nipple with adhesive chemical of approved makeand allow it to cure complete as per direction of Engineer-In-Charge.
26.35.2 : Providing and injecting approved grout in proportion recommended by the manufacturer into cracks/honey-comb area of concrete/masonry by suitable gun/pump at required pressure including cutting of nipples after curing etc. complete as per directions of Engineer-in-Charge.<br> (The payment shall be made on the basis of actual weight of approved grout injected.)Stirrer mixed SBR Polymer (of approved make) modified Cement slurry madewith Shrinkage Compensating Cement in concrete/RCC work.
5.2.2 : Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
5.9.6 : Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts
5.22.6 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
Rectification works to hand rail
5.1.3 : Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
5.9.6 : Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts
5.22.6 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
24.3 : Cleaning the sand stone surface and removing dirt, dust , bird dropping, grease, oil, algae, fungus, monkey beats, vegetable growth etc., including providing, applying and washing the surface with liquid Ammonia Chemical of 5% solution and other chemical cleaning agent as approved by Archaeological Survey of India / Engineer - in-charge, of approved brand and manufacturer, with the help of required scrubbers and also cleaning with machine operated water jet mixed with desired quantity of fine silica where ever required, without causing any scratching/ damage to the stone surface and finally washing the surface with clean water with the help of pressure jet machine, complete in all respect, including taking all precautions to safeguard ventilators, windows, doors etc. by suitable covering so as to avoid any damage to the building / structure, all as per direction of Engineer- in- Charge ( The rate is inclusive of all materials & labours involved except scaffolding).
13.43.1 : Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface:Water thinnable cement primer
13.44.1 : Finishing walls with water proofing cement paint of required shade:New work (Two or more coats applied @ 3.84 kg/10 sqm)
13.52.1 : Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete.On steel work
13.52.2 : Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete.On concrete work
Clearing jungle
2.33.2 : Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 60 cm girth up to and including 120 cm girth
2.33.3 : Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyond 120 cm girth up to and including 240 cm girth
Rectification works to Aqueduct
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
2.26.1 : Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil
24.2 : Providing and fixing double scaffolding system (Cup lock type ) on the exterior side of building/structure, upto 25 metre height, above ground level, including additional rows of scaffolding in stepped manner as per requirement of site, made with 40 mm dia M.S. tube, placed 1.5 metre centre to centre, horizontal & vertical tubes joint with cup & lock system with M.S. Tubes, M.S. tube chakkus, M.S. clamps and staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for execution of work of cleaning and / or pointing and / or applying chemical and removing it thereafter. The scaffolding system shall be stiffened with bracings, runners, connecting with the building etc, wherever required, if feasible, for inspection of work at required locations with essential safety features for the workmen etc., complete as per directions and approval of Engineer-in-Charge. Note: - ( 1) The evaluational area of the scaffolding shall be measured for payment purpose, (2) The payment will be made once only for execution of all items of such works.
26.28.2 : Chipping of unsound/weak concrete material from slabs, beams, columns etc. with manual Chisel and/ or by standard power driven percussion type or of approved make including tapering of all edges, making square shoulders of cavities including cleaning the exposed concrete surface and reinforcement with wire brushes etc. and disposal of debris for all lead and lifts all complete as per direction of Engineer-In-Charge50mm average thickness
15.3 : Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge.
5.3 : Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 15<sup>0</sup> landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) : 3 graded stone aggregate 20 mm nominal size).
5.9.3 : Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform
5.9.16.1 : Centering and shuttering including strutting, etc. and removal of form for:Edges of slabs and breaks in floors and wallsUnder 20 cm wide
26.31.1 : Providing, mixing and applying bonding coat of approved adhesive on chipped portion of RCC as per specifications and direction of Engineer-In-charge complete in all respect.SBR Polymer (@10% of cement weight) modified cementitious bond coat @2.2kg cement per sqm of surface area mixed with specified proportion of approvedpolymer
od22607/2020_2021/P1 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)Modified cement concrete with SBR at 2% by weight of cement
26.29.1 : Cleaning of reinforcement from rust from the reinforcing bars to give it a total rust free steel surface by using alkaline chemical rust remover of approved make with paint brush and removing loose particles after 24 hours of its application with wire brush and thoroughly washing with water and allowing it to dry, all complete as per direction of Engineer-In-Charge.Bars upto 12 mm diameter
5.22.6 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
26.30.1 : Drilling suitable holes in reinforced or plain cement concrete with power driven drill machine to a minimum depth of 100mm upto 200mm in RCC beams, lintels, columns and slabs to introduce steel bars for sunshades/balconies including fixing the steel bars in position using epoxy resin anchor grout of approved make but excluding the cost of reinforcement, all complete as per direction of Engineer-In-Charge.Upto and including 12mm dia.
26.31.2 : Providing, mixing and applying bonding coat of approved adhesive on chipped portion of RCC as per specifications and direction of Engineer-In-charge complete in all respect.Epoxy bonding adhesive having coverage 2.20 sqm/kg of approved make
26.33.1 : Providing, mixing and applying SBR polymer (of approved make @ minimum 2% by wt. of cement used) modified plain/reinforced cement concrete for structural members having minimum characteristic compressive strength [with ordinary portland cement, coarse sand and graded stone aggregate of 10mm maximum size in proportion as per design criteria] with specified average thickness.<br> Note: Rates shall be for finished surface area of concrete and shall include the cost of labour, concrete and appropriate approved Super-Plasticiser for rendering concrete as flowable and SBR polymer but shall exclude cost of reinforcement, bond coat, Shear Keys, centering and shuttering, strutting, propping etc (Payment under this item shall be made only after proper wet curing has been done and surface has been satisfactorily evaluated by sounding/tapping with a blunt metal instrument)50mm thick in Grade M 25 with cement content not less than 330 kg per cum
26.32.1 : Providing, mixing and applying SBR polymer (of approved make) modified Cement mortar in proportion of 1:4 (1 cement: 4 graded coarse sand with polymer minimum 2% by wt. of cement used) as per specifications and directions of Engineer-in-charge. Note: Measurement and payment: The pre-measurement of thickness shall be done just after the surface preparation is completed and Payment under this item shall be made only after proper wet curing has been done and surface has been satisfactorily evaluated by sounding / tapping with a blunt metal instrument and/or the 75mm size cube crushing strength at the end of 28 days to be not less than 30 N/Sqmm2).12 mm average thickness.
od22746/2020_2021/P1 : Applying corrosion inhibitor one coat of nitozinc / approved equivalent make primer (two component system based on metallic zinc and epoxy resin and shall be mixed until a homogenous mixture is obtained) on the cleaned and dried reinforcing bar using a small paint brush such that the zinc rich primer coated should make an unbroken continuous film on the bars. ( If in doubt of having achieved an unbroken coating, a second application should be made as soon as the first coat is fully dry). After drying the treated surface, apply one coat of bonding agent Nitobond A R/SBR. Measurement is made for whole exposed area including cost of materials, labour charges, conveyance of materials to site, hire charges of tools etc complete.
od22747/2020_2021/P1 : Applying two component (liquid polymer part and powder part) high build polymer modified cementitious reinstatement repair mortar, Rendroc HB2 / approved equivalent make preferable with a gloved hand or trowel using wet on wet technique to make sure that high strength polymer mix covers the reinforcing bar on all sides . Before applying Rendroc HB2 / approved equivalent make, the reinforcing steel should be primed and SBR should be tacky. For one bag of 18kg Rendroc HB2 / approved equivalent make, place about 2.75litres of drinking quality water in the mixer and add the supplied liquid polymer part, mix well in the mixer machine in operation, add Rendroc HB2 / approved equivalent make powder and mix for 2 to 3 minutes. Depending on the ambient temperature and the desired consistency, a small additional amount of water may be added up to a maximum total water content of 3.25 litres.Measurement is made for whole exposed area Including cost of materials, labour charges, conveyance of materials to site, hire charges of tools and mixer machine etc complete.
26.32.3 : Providing, mixing and applying SBR polymer (of approved make) modified Cement mortar in proportion of 1:4 (1 cement: 4 graded coarse sand with polymer minimum 2% by wt. of cement used) as per specifications and directions of Engineer-in-charge. Note: Measurement and payment: The pre-measurement of thickness shall be done just after the surface preparation is completed and Payment under this item shall be made only after proper wet curing has been done and surface has been satisfactorily evaluated by sounding / tapping with a blunt metal instrument and/or the 75mm size cube crushing strength at the end of 28 days to be not less than 30 N/Sqmm2).50 mm average thickness in 3 layers.
26.37 : Cleaning of exposed concrete surface of sticking material including looseand foreign material by sand blasting with coarse sand followed by andincluding cleaning with oil free air blast as per direction of Engineer in charge.
26.38.2 : Shotcreting R.C.C. columns, beams and slabs etc. in layers with approved design mix concrete having the specified minimum characteristic compressive strength [with ordinary portland cement, coarse sand and graded stone aggregate of 10 mm maximum size in proportion as per design criteria] including the cost of centering and shuttering at edges and corners etc. as directed by Engineer- in-Charge<br> Note: Rates shall include the providing necessary ground wires etc. The levelling gauges, if used, shall be paid for separately. Payment under this item shall be made only after proper wet curing has been done and surface has been satisfactorily evaluated by sounding/tapping with a blunt metal instrument.50mm thick in Grade M 25 with cement content not less than 330 kg per cum
od22969/2020_2021/P1 : Guniting concrete surface with cement mortar applied with compressor after cleaning surface and spraying with epoxy complete as per technical specification of IRC
od19534/2020_2021/P1 : Providing leak proof expansion joints with pouring grade polyester based poly sulphide sealant mixed with Epoxy adhesive premix in 2:1 proportion(2 part component A and 1 part component B by weight ) mix for about 3 minutes with a low speed drill and paddle mixer until uniform in colour, apply the Epoxy adhesive on both sides of joint and place the activated expansion joint sheet in position on to the Epoxy adhesive and force sheeting in to the Epoxy using a hard roller and exclude air through the special perforations until the adhesive comes through the perforations including mechanical nailing the expansion tape with additional strip, overlapping sealed with Epoxy based adhesive and levelling the edges with Epoxy mortar including cost of all materials and labour charges etc. Complete as par the direction og departmental officers at site.
13.1.1 : 12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand)
4.1.3 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
Water testing
od30957/2020_2021/P1 : Laterate masonry with neatly dressed laterate stone of size 30x20x20cm or nearest size in cement mortar 1:6 for super structure above plinth level up to floor two level including all cost of materials, labour charges etc.
13.1.2 : 12 mm cement plaster of mix:1:6 (1 cement : 6 fine sand).
60.2.2 : Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete
od31568/2020_2021/P1 : Demolishing laterite masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In cement mortar
SHIJI.TK
Bidder Name
Abdul Saleem K
SHIJI.TK
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_576464.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .