Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹20 Cr
EMD Value
₹40 L
Closing Date
3 Nov 2026, 4:05 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer , Road Project Department, VADODARA MUNICIPAL CORPORATION
Rate Contract For Construction of R.C.C road in West Zone
358268
509/2026-27
Open
Civil Works - Roads
Works
Vadodara
1 document required · 1 mandatory
₹20,000
Municipal commissioner ,Vadodara municipal corporation
₹40 L
23 Oct 2026
23 Oct 2026
23 Oct 2026
3 Nov 2026
23 Oct 2026
120 days
NAME OF WORK :: Rate Contract For Construction of R.C.C
road in West Zone.
Sr. No. Particulars Page No.
Instruction to Tender
General Condition of Contract
PREQUALIFICATION
BID Special Condtion of Contract
Technical Specification
Annexure A to M
Sr.No Contents Page No.
Volume II Abstract Of Estimate For Part A
Name of Work :- Rate Contract For Construction
of R.C.C road in West Zone.
www.nprocure.com લેફવાઇટ યથી ટેન્ડય બયલાનુ યશેળે. ત્માયફાદ વોફ્ટ કોીના આધાયે જ તેન ુ ઇલોલ્યુએળન કયલાભાાં આલળે , ઇજાયદાયે
Tender Department Details Issue of Tender Last Date
P.R.O. Start Date End Date for receipt of
Executive Rate Contract For
Engineer DBM(Carpet) and Liquid
(Road Project) sealcoat For East Zone. 19-10-2026 3-11-2026 5-11-2026
Executive Rate Contract For
Engineer DBM(Carpet) and Liquid
(Road Project) sealcoat For West Zone. 19-10-2026 3-11-2026 5-11-2026
Executive Rate Contract For
Engineer DBM(Carpet) and Liquid
(Road Project) sealcoat For North Zone. 19-10-2026 3-11-2026 5-11-2026
Executive Rate Contract For
Engineer DBM(Carpet) and Liquid
(Road Project) sealcoat For South Zone. 19-10-2026 3-11-2026 5-11-2026
Executive Rate Contract For
Engineer Construction of R.c.c road in
(Road Project) East Zone. 19-10-2026 3-11-2026 5-11-2026
Executive Rate Contract For
Engineer Construction of R.c.c road in
(Road Project) West Zone. 19-10-2026 3-11-2026 5-11-2026
Executive Rate Contract For
Engineer Construction of R.c.c road in
(Road Project) North Zone. 19-10-2026 3-11-2026 5-11-2026
Executive Rate Contract For
Engineer Construction of R.c.c road in
(Road Project) South Zone. 19-10-2026 3-11-2026 5-11-2026
કયી ળકળે. અથલા R & B ડડાટડ ભેન્ટનુાં (Road, Bridge & Building) ની Special
Category- I કે ટેગયીનુાં અથલા વયકાયી/ અધડ વયકાયી વાંસ્થાભાાં વભકક્ષ યજીસ્ટરે ળન ધયાલતા ઇજાયદાય
૪.૦ છે લ્લા કયે ર કાભની રેફય એકટ શે ઠ ભેલેર વટીપીકે ટની પ્રભાણીત નક્ર (TRUE COPY) યજુ
૫.૦ ી.એપ.યજી.ની પ્રભાણીત નકર (TRUE COPY) વાભેર કયલાની યશે ળે.અથલા વદય કાભે કાભન
૬.૦ Technical Eligibility :
ભાટે કયે ર કાભગીયી જે તે કામધારક ઇજનેય શ્રી “ Amount of work done “ અંગેન ુ ાં પ્રભાણત્ર
અથલા કાંપ્રીળન પ્રભાણત્ર (Form- 3A) ભાન્મ કયલાભાાં આલળે.
Details should be given As in below mention Table With Stemp and Signature of
MOU આલાનુ યશે ળે અને આ ક્લયીને ખનીજ ખાતાનુાં Valid પ્રભાણ ત્ર આપ્મુાં શમ તેલી નક્ર.
(TRUE COPY) અને ક્લયી અાંગે R&B ભેકેનીકર ળાખાનુાં H.S.I.વડટડ .નુાં લેરીડ પ્રભાણ ત્ર યજુ
કયલુાં. (TRUE COPY).
૦૯. Bank solvency certificateofall nationalized banks including banks specified in Annexure
shall be minimum 20% of tender amount.
એપીડે લીટતથા ભાલરક વાથેનુાં MOU આલાનુ યશે ળે.
કયલાભાાં આલળે. ટે ન્ડય ખુલ્મા ફાદ ભુ Qualification ના ડક્મુભેન્ટ શળે અને તેની લધુ
૧૪. ઇજાયદાય ાવે ોતાની ભાલરકીનુ ાં કોલ્ડ ભીરીંગ ભળીન (COLD MILLING MACHINE) શોવુ
જોઇએ અથલા જો ઈજાયદાય ાવે ોતાની ોતાની ભારીકીનુ કોલ્ડ ભીરીંગ ભળીન (COLD
MILLING MACHINE) ન શોઇ તો ઈજાયદાયે કોલ્ડ ભીરીંગ ભળીન (COLD MILLING
MACHINE) સ્લતાંત્ર યીતે વ્મલસ્થા કયલાની યશેળે તથા આ અંગે રૂ.૩૦૦ના સ્ટેમ્ ેય ઉય
ઇજાયદાયે એપીડેલીટ તથા ભાલરક વાથેન ુ ાં MOU ુયેય
૧૭. બાયત વયકાય દ્વાયા વભગ્ર અથડતાંત્રને Cashless અને digital Transaction આધાયીત
ઇજાયદાયે તાના તાફા શે ઠના કભડચાયીઓ/ભજુ ય લગેયેને ચુકલલા ાત્ર યકભ Cashless
પ્રી-કલોરીપીકે ળન સાથે Compulsory સાભેર યાખલાાત્ર દસ્તાલેજો-ત્રોની
ડડાટડ ભેન્ટનુાં Special Category- I
(Road, Bridged& Building) ની
૦૬. Technical Eligibility : ભુદા નાં ૦૬ ભુજફ
એગ્રીભેન્ટ/એપીડે લીટ/MOU યજુ કયલાની માદી
બાલત્ર Qualify કયલાભાાં આલળે નહી.
ચકાસણી ભાટે Reference ની જરૂયીમાત જણામ તો તેલા સાંજોગોભાાં (Reference) જરૂયીમાત પ્રભાણેના
જરૂયીમાત પ્રભાણે યસ્ત કાચ ાક કયી ીવીવી (૧:૩:૬) કયી એભ-૪૦ ગ્રેડ કોંક્રીટથી RCC
Road/WhiteTopping કયલાનુાં કાભ.
લલગેયેની લલગત દળાડલતા તથા ભળીનશર તથા લયવાદી ગટય કે ચીટના GPS co-ordinates દળાડલતુ ડર ઇંગ
ૈકી કાચ ાક ડદન-૦૭ ભાાં કયી યસ્તMotorable કયલાન યશે ળે. વદય યીસ્ટયે ળનની કાભગીયીના બાગની
ઇજાયદાયના અન્મ કઇણ VMC ના કાભ ેટે ફીરભાાંથી કાત કયલાભાાં આલળે. જે ઇજાયદાયને
APPENDIX (Scope of work )
Indicative List of minimum Plant & Equipment to be Deployed on Contract Work
Sr. Type of Equipment Nos.
1 Tipper Trucks
4 Front end Loader
5 Smooth Wheeled Roller
6 Vibratory Roller
10 Water Tanker
12 Pnumatic TyreRoller -
13 Concrete batching plant
14 Mechanical Broom Hydraulic -
15 Motor Grader
16 Tractor Dozzer -
17 Baby (Small ) Roller
Plant/Site Laboratory: Contractor
shall have to provide site labouratory
at his won expenses to carry out field
test. For this purpose laboratory
building having 25 sq.mt.shall be
constructed by the contractor which
shall have necessary facility of
light,water etc.
In the absence of any equipment as
per test requirements of section 900 of
Most specification the same shall be
provided by the contractor at any time
as directed by the Engineer.No extra
payment shall be made to the
NOTE: Above indicative list of minimum machinery shall be modified in accordance
with requirement of work on case to case basis.
1. જમાયે કઇ ણ ભાંડ તયપથી બાલત્રક (Tender) બયલાભાાં આલે ત્માયે તે ભાંડના દયે ક
આલાભાાં આલલાન શમ ત તે નકળા કાભ કયલાની લલગત (Specification) લલગેયેની
લડદયા ભશાનગયાલરકાભાાં ટે ન્ડય બયલા ભાટે પ્રલતફાંલધત )Abeyance.કયલાના યશે ળે (
છે લટ હશવાફની ળયતે આ થઇ છે . (Payment on Account)એ પ્રભાણે ગણલાભાાં આલળે અને છે લટની દે લામાદી
કયતા લધુ કાભગીયી અગય નશીં દાખર કયે ર યકભનુાં કોઇ ણ કાભ (Extra Item) કાભના બાગ તયીકે ઇજાયદાયને
ફશાયની યકભનુાં લધાયાનુાં કાભ પ્રભાણભુત બાલત્ર (Schedule Rates)ભાાં દાખર કયે રા બાલો પ્રભાણે કયવુાં ડળે
અને આલા પ્રભાણભુત બાલત્ર ભાાં ટકા યકભõ(Item)દાખર ન થમેરી શોમ તેના બાલ મોગ્મ અવધકાયી તયપથી ભાંજુય
15) જો લડોદયા ભશાનગયાલરકાના ફાાંધકાભ અવધકાયી ને થમેર કાભ એકભ ળયતત્ર (Specification)પ્રભાણે થમેલ ુ નથી
ભારવાભાનનુાં ભા રેલા લજન કયલા અગય કાભના આરેખને (Linecut) કયલાભાાં જે વાધનની જરૂય ડે તે કઇ ણ
અત્રેથી વનયુક્તકયે ર TPI ની વાિીભા કયાલી રેલાની જલાફદાયી ઇજાયદાયની યશેળે. ઇજાયદાય જે વયકાય / લડોદયા
33)ઇજાયદાયે કોન્રાકટ ઓર યીસ્ક ોરીવી (CAR Policy)ઉતાયલાની યશેળે જેભાાં નીચેના મુદ્દાનો વભાલેળ કયલાનો
લવુરાત ઇજાયદાય ાવેથી કયી ળકળે અને આ ઉયાાંત ઇજાયદાયને કાી માદીભાાં ભુકી ળકળે/TERMINATE
૪૨) કોન્રાકટયે GST વવલામના બાલો બયલાના યશેળે. આ કાભ અથે ઇજાયદાયને GST ની યકભ અરામદા ચુકલલાભાાં
૪૩) ઇજાયદાયે કાભના સ્થે Moving ટર ાપીક તેભજ યાશદાયીઓની વરાભતી ભાટે જરૂયી તભાભ વાંફાંલધત ગરા
VADODARA MUNICIPAL CORPORATION
INSTRUCTION TO TENDERERS
1. The Tenderers are advised to inspect the site of works and be fully
acquainted with the site conditions which may be necessary for the
purpose of submitting the tender and for executing the work. If
requested in advance and in writing department will arrange to visit the
2. In the event of the tender being submitted by the firm, it must be signed
by all the partners or by any partner who has been specifically authorize
under the Partnership deed to sign and execute contracts on behalf of
the firm or by any person holding a Power of Attorney authorized him to
sign and execute the contract on behalf of the firm. [The Authority letter
is required to be enclosed along with the Tender].
3. Receipts for payments made on account of any work, when executed by
a firm, can be signed by any of the partners of the firm or any other
person authorized by the firm under a Power of Attorney of give effectual
receipt for and on behalf of the firm.
4. The tender shall be filled in strictly according to columns prescribed in
the tender stating the rates at which tenderers are willing to undertake
each time of work. Any modifications or additions in the item of works or
in any other part of the tender made by the Tenderer will not be
5. The VADODARA MUNICIPAL CORPORATION shall have the right to
reject all or any of the tenders without assigning any reason for such
6. Measurements for all the works shall be taken by standard measures
available with the VADODARA MUNICIPAL CORPORATION and
practice and rules framed by the VADODARA MUNICIPAL
CORPORATION from time to time.
7. The tenderers are required to quote only firm rates and any condition
attached to the rates quoted by them is likely to disqualify the tender for
evaluation and consideration for award of the work.
8. The tenderers are advised to send their tender by Registered / Speed
post so that tender reaches to VADODARA MUNICIPAL
CORPORATION on or before the due date. Any tender received after
due date shall not be considered.
9. Tender not accompanied by Earnest Money in the manner provided in
the tender notice shall not be considered. Amount of earnest money
shall not bear any interest and will be refundable to the Tenderer, if
tender is not accepted.
10. Tender shall be filled in and signed only by the duly authorized person or
persons of the Tenderer. If at any item during security and finalisation of
the tenders, it is found that any tender or tenders are signed by the
persons who are not duly authorized then the earnest money received
with such tender shall stand forfeited.
11. Tenderer shall have to pay Security Deposit in the time and manner
prescribed under Clause 1 of the General Conditions of Contract.
12. Successful Tenderer shall keep all documents ready for signing
“Agreement with the VADODARA MUNICIPAL CORPORATION”.
Tenderer will have to make himself/itself available at fifteen days notice
for executing such Agreement. The tenderers are advised to carefully
study the various conditions of he contract, work specification, site
conditions, VADODARA MUNICIPAL CORPORATION‟s rules and
regulations with regards to safety and security, etc.
13. The prices in tender shall be filled in English with neat handwriting and
all the figures and words shall be legible. No overwriting shall be done.
In case any cancellation or correction is required, the figure or word shall
be wholly crossed and re-written and authenticated under with initial/s of
the Tenderer. Rate shall be written for each item and the total amount
the Tenderer. Rate shall be written for each item and the total amount
for each item shall be properly calculated and clearly mentioned in the
relevant columns. All such amounts shall be signed by the Tenderer.
14. Tenderer shall submit along with the tender a list of equipment which he
proposes to use for this work.
15. Tendered rates shall include all the material, taxes, labour and
requirements of plants, machinery, equipment, supervision, handling,
cleaning, testing etc. (whether mentioned in the item or specifications
etc. or not) which is required and necessary to complete the item.
16. The tenderers are advised to read together with the specifications
including materials and drawings, as specifications are complimentary
part of the item. Items for which details are not given or are given
inadequately reference will be taken from ISI specifications or MORTH or
PWD handbook. Such details shall be deemed to have been included in
the item and the rates quoted shall be all inclusive. Whether mentioned
in the item or not material test as may be required by the City Engineer
of Vadodara Municipal Corporation shall be provided and no extra
payment will be made for that purpose.
17. Specifications are given for certain numbers of items only. However, the
items for which the specifications are not prescribed but which are
relevant to these specifications shall also be executed in accordance
with such specifications.
18. Suitable number of photographs and negatives shall be supplied free of
cost to the Vadodara Municipal Corporation every month for the
progress of various stages of the works.
19. Tenders are required to quote separate prices of different items of work
change in format is acceptable. Quoting for all items is also mandatory.
20. Validity of tenderer‟s proposal shall be 120 days from Last Date Of
Submission Of Online Tender.
21. ALL PAGES TO BE INITIALED
All signature in Tender documents shall be dated as well as pages of all
sections of Tender documents shall be initialed at the lower right hand
corner or signed wherever required in the Tender papers by the
Tenderer or by any person holding power of Attorney authorizing him to
sign on behalf of the Tenderer before submission of Tender.
22. RATES TO BE IN FIGURES AND WORDS
The Tenderer shall quote the rates in English both in figures as well as in
words and the rates and amounts tendered by him in the schedule of
quantities as per proforma in Appendix II. The item wise tendered
amount for the work shall be entered in the abstract of estimate and duly
signed by the Tenderer.
23. EVALUATION OF TENDER’S PRICE BID
Any error in quantity or amount in Price bid of tender form showing items
of works to be carried out shall be adjusted in accordance with the
following rules :
i) In the event of a discrepancy between description in words and
figures quoted by a Tenderer in the rates column, the description in
word shall prevail.
ii) In the event of an error occurring in the amount column of the
Schedule B of Tender Form showing items of work as a result of
wrong multiplication of the rate and quantity, the unit shall be
regarded, as firm and multiplication shall be amended on the rate.
iii) All errors in totally in the amount and carrying forward totals shall
iv) Any rounding off of amounts against items or in totals shall be
v) For any item in price bid, the bidder has not quoted the rates (or
left blank), it is treated as „zero rate‟ and all such item shall be
considered as executed free of cost.
The tendered sum so altered shall, for the purpose of the tenders be
submitted for the sum originally tendered and considered for acceptance.
24. CORRECTIONS AND ERASURES
All corrections and Alterations in the entries of tender papers will be
signed in full by the Tenderer with date. No erasures or over writings are
25. SIGNATURE OF TENDERER
The tenderer shall contain the name, residence and place of business of
person or persons making the Tender and shall be signed by the
Tenderer with his usual signature. Partnership firms shall furnish the full
names of all the partners in the Tender. It should be signed in the
Partnership‟s name by all partners or, by duly authorized representative
followed by the name and designation of the person signing. Tender by
a firm shall be signed by an authorized representatives and a power of
Attorney in that behalf shall accompany, the Tender. A copy of the
constitution of the firm with names of all partners shall be furnished.
Witness and sureties shall be persons of status and property and their
names, occupations and address shall be stated below their signature.
27. DETAILS OF EXPERIENCE
The Tenderer should enclose documents to show that he has previous
experience in having successfully completed in the recent past work of
this nature together with the name of Owner‟s location of sites and value
28. ENGINEER OF CONTRACTOR
The contractor, on or after award of the work, shall name and depute a
qualified Engineer having sufficient experience in carrying out works of
similar nature, to whom the equipments, materials, if any shall be issued
and instructions for construction/execution shall be given.
29. TRANSFER OF TENDER DOCUMENTS
Transfer of Tender documents purchased by one intending tenderer to
another is not permissible.
30. TIME LIMIT – PERIOD OF COMPLETION
The period of completion shall be calculated from the date of issue of
any notice to proceed with the work i.e. issue of work order. Any
extension of time limit demanded by contractor for their reason, shall not
entitle for any price escalation/delay compensation or liquidity damages.
Addenda to the Tender documents may be issued prior to the date of
opening of Tenders to clarify documents or to reflect modifications in the
design or contract terms.
Each addendum issued by the Engineer in charge will be distributed in
duplicate to each person or organization to whom a set of Tender
documents has been issued.
Each recipient will retain one copy of each addendum for submission
along with his tender and return one singed copy to the Engineer-in-
charge shall become part of Tender documents.
32. RIGHT OF OWNER TO ACCEPT OR REJECT TENDER
The acceptance of Tender will rest with the Owner. The Owner however,
does not bind itself to accept the lowest tender and reserves to itself the
authority to reject any or all the Tenders received without assigning any
reason whatsoever. The whole work may be split up between two or
more contractors or accepted in part and not entirely, if considered
Tender in which any of the particulars and prescribed informations are
missing or are incomplete in any respect and/or the prescribed
conditions are not fulfilled are liable to be rejected.
Canvassing in connection with tender is strictly prohibited and
tenders submitted by the tenderers, who resort to canvassing will be
liable to rejection.
33 In the event of progress of work by the contractor, without executing the
contract agreement, the responsibility with all risk and cost shall be of
34 The successful Tenderer will be required to sign the contract agreement
on a stamp paper of the value as per prevailing norms of Vadodara
Municipal Corporation. Alternatively, if the Tenderer wishes to sign the
agreement, the same be adjudicated by the State Level Authority
competent to do so.
35 It is responsibility of tenderer to get authorized copy of tender
documents, map etc so that during the time of execution of work
contractor can proceed with work and all time the details of work is
known to the contractor.
36 The bidder shall have to submit resource/activity chart of whole work
divided in minimum 10 activities justifying the timely completion of work.
In case the bidder do not submit the schedule of work progress, it is
mandatory to follow the progress of work as decided by Vadodara
Municipal Corporation during execution.
VADODARA MUNICIPAL CORPORATION
General Conditions
GENERAL CONDITIONS OF CONTRACT
DEFINITION OF TERMS :-
In the Contract documents as hereinafter defined the following words &
expression shall have the meanings hereby assigned to them except where
the context otherwise requires :-
1. “The Owner or Employer”, means the Municipal
Commissioner Vadodara Municipal Corporation, Vadodara which may
abbreviated as “VADODARA MUNICIPAL CORPORATION” and
includes the Owner‟s or Municipal Commissioner, VADODARA
MUNICIPAL CORPORATION‟s authorized representatives or
2. The abbreviation VADODARA MUNICIPAL CORPORATION wherever
used in contract shall mean Vadodara Municipal Corporation and term
shall be used to in place of authorized person or persons who will be
operating this contract as VADODARA MUNICIPAL CORPORATION‟s
representative and will include namely Municipal Commissioner, City
Engineer and Executive Engineer or their authorized representatives.
3. The “City Engineer”, shall means the City Engineer of Vadodara
Municipal Corporation and shall include those who are expressly
authorized by him to act on his behalf.
4. The “Executive Engineer”, shall means the Executive Engineer of
Vadodara Municipal Corporation, who is incharge of the project and
shall include those who are expressly authorized him to act for and on
5. The “Engineer in charge”, shall means the Deputy Executive Engineer
of Vadodara Municipal Corporation, who is incharge of the project and
shall include those who are expressly authorized him to act for and on
6. “The Contractor”, means the person or persons, firm or Company
whose tender has been accepted by the Owner and include the
Contractor‟s legal representatives, his successor and permitted
7. The term “Work or Works” of the contract shall mean all of the various
classes of works to be executed in accordance with the contract, whether
temporary or permanent, and include all labour and material, machinery,
instruments, construction equipment, plant, plant operation and
maintenance, all tools and all other items required for the completion of
the construction. It shall also mean the place of working, where the
context so includes.
8. “Contract”, shall mean the Agreement between the Vadodara
Municipal Corporation and the contractor for the execution of works
including therein all contract documents like Condition of Contract,
Specification, Drawings, Prices Bill, Schedule of quantities, Schedule of
rates and prices (if any), work order and all tender .
9. The “Contract Price”, means the sum named in the Tender subject to
such additional there to or deduction there from as may be under the
provisions hereinafter the contained.
10. “Construction Plant”, means all machinery, tools, appliances or thing
of whatsoever nature required for the execution, completion or
maintenance of the works or temporary works (as hereinafter defined)
but does not include materials or other things form or forming part to the
permanent work.
11. “Temporary Works”, means all temporary works of every kind required
in or about the execution, completion or maintenance of the works. The
cost of such work associated with tender is included .
12. “Drawings”, means the drawings referred to in the Specification and
any modification such drawings approved in writing by the City Engineer
/ Executive Engineer, Consultant and such other drawings, diagrams, or
sketches as may from time to time be furnished or approved in writing by
the City Engineer / Executive Engineer.
13. “Site”, means the land and other places on under in or through which
the permanent works are to be executed or carried out & any other land
or places provided by the Owner for purpose of the contract.
14. Words importing the singular number only also include the plural and
vice versa where the context requires.
15. ”Contract Documents”, means collectively the Tender documents,
Designs, Drawings, Specifications agreed variations if any, contract such
other documents constituting the Tender and acceptances thereof.
16. “The Specification”, shall mean the various technical specifications
attached and referred to in the Tender documents. It shall also include
the latest edition of relevant Indian Standard Specification published
before entering into contract. Further in absence of any specific
reference in I.S.S. the standards and specifications of P.W.D.H.B. or
GWSSB as the case may be will be followed as per the consent of city
17. The “Tender”, means the tender submitted by the contractor for
acceptances by the Owner.
18. The “Alternation Order”, means the order given in writing by the
Engineer-in-charge to effect to or deleting from and alternations in the
19. The “Completion Certificates”, shall mean the certificate to be issued
by the City Engineer, when the works have been completed to his
CLAUSE 1 : COMPENSATION OF DELAY AND PENALTY DELAY
The time allowed for carrying out the work as entered in the tender shall be
strictly observed by the contractor and shall be reckoned from the date of
which the order to commence work is given to the contractor. The work shall
throughout the stipulated period of the contract be proceeded with, with all due
diligence (time being deemed to be of the essence of the contract on the part
of the contract) and the contractor shall pay as compensation and or penalty
for delay. Further contractor shall to ensure good progress during the
execution of the work. The work shall be completed stage wise as per the
schedule given at the time of tender submission (Refer qualification criteria)
before award of the job to contractor, and which will form the part of the
contract, failing which intermediate compensation shall be levied. In case
contractor have not submitted it is confirmation the schedule of work progress,
on part of contractor follow the schedule of work decided by VADODARA
MUNICIPAL CORPORATION.
In the event of the contractor failing to comply with these conditions of Contract
is liable to be terminated at any stage and / or an amount equal to one half
percent of contract amount of whole work over stipulated time limit shall be
levied as a penalty for every day that the delay or penalty provided always that
the total amount of compensation to be paid under the provision of this clause
the total amount of compensation to be paid under the provision of this clause
shall not exceed 10% of the contract value of the work.
The decision of City Engineer will be final for all such delay compensation.
CLAUSE 2: ACTION WHEN WHOLE OF SECURITYDEPOSIT IS
In any case in which under any clause of this contract, the contractor
shall have rendered himself liable to pay compensation amounting to the
whole of his Security Deposit (Whether paid in one sum or deducted by
installment) or in the case of abandonment of the work owing to serious
illness or death of the contractor or any other cause, the city Engineer,
on behalf of Vadodara Municipal Corporation shall have power to adopt
any of the following courses as man, deemed best suited to the interest
of Vadodara Municipal Corporation.
a) To rescinded the contract (of which recession notice in writing to the
contractor under the hand of the executive Engineer shall be conclusive
evidence) and in that case, the Security deposit of the contractor shall
stand forfeited and be absolutely at the disposal of the Vadodara
Municipal Corporation.
b) To employ labour paid the Vadodara Municipal Corporation and to
supply materials to carry out the work, or any part of the works, debiting
the contractor with the cost of the labour and price of materials as to the
correctness of which cost and price the certificate of the City Engineer
shall be final and conclusive against Contractor and crediting him with
the value of the work done, in all respect in the manner and at the same
rate as if it had been carried out by the contractor under the terms of this
contract and in that case the certificates of the Executive Engineer as to
the value of the work done shall be final and conclusive against the
c) To order that the work of the contractor be measured up and to take
such part thereof as shall be unexecuted out of his hands, and to give it
to another contractor to complete, in which case, any expenses which
may be incurred in excess of the sum which would have been executed
by him (as to the amount of which expenses the certificate in writing of
the City Engineer shall be final and conclusive) shall be borne and paid
by the original contractor and shall be deducted from any money due to
him by the Vadodara Municipal Corporation under the contractor or
otherwise or from his security deposit or the proceeds of sale thereof, of
a sufficient part thereof. In the event of any of the above courses being
adopted by the City Engineer the contractor shall have no claim to
compensation for any loss sustained by him by reason of his having
purchased, or prepared any materials, or entered into any engagements,
or made any advances on account of or with a view to execution of the
work or the performance of the contract. And in case of the contract shall
be rescinded under the provision aforesaid, the contractor shall not
be entitled to recover or be paid any sum, for any work therefore actually
performed by him under this contract unless and until the Executive
Engineer shall have certified in writing the performance of such work and
the amount payable to him in respect thereof and he shall only be
entitled to be paid the amount so certified.
CLAUSE 3 : ACTION WHEN THE PROGRESS OF ANY PARTICULAR
PORTION OF THE WORK IS UNSATISFACTORY
If the progress of any particular portion of the work is unsatisfactory the
City Engineer / Executive Engineer shall, not withstanding that the
general progress of the work is satisfactory in accordance with Clause
be entitled to take action under clause 3(b) after giving the contractor
days notice in writing and the contractor shall have no claim for
compensation for any loss sustained by him owing to such action.
CLAUSE 4: CONTRACTOR REMAINS LIABLE TO PAY COMPENSATION,
IF ACTION NOT TAKEN UNDER CLAUSE 3 POWER TO
TAKE POSSESSION OF OR REQUIRE OF OR SELL
CONTRACTOR PLANT AND MATERIAL
In any case in which any of powers conferred upon the City Engineer by
Clause 3 and 4 hereof shall have become exercisable and the same not
have been exercised, the non-exercise thereof and such powers shall
not constitute a waiver of any of the conditions thereof and such powers
shall not withstanding be exercisable in any future case of default by the
contractor for which by any clause or clauses thereof he is declared
liable to pay compensation amounting to the whole of his security deposit
and the liability of the contractor for past and future compensation shall
remain unaffected. In the event of the City Engineer taking action under
sub clause (a) or (c) of Clause 3, he may, if he so desires, take
possessions of all or any tools, plant, materials and stores in upon the
works or the site thereof of belonging to the contractor or procured by
him and intended to be used for the execution of the work or any part
thereof paying or allowing for the same in the account of the contract
rates or in the case of contract rates not beings applicable at current
market rates, to be certified by the Executive Engineer whose certificates
thereof shall be final. In the alternative the City Engineer may be notice
in writing to the contractor of his works foreman or other authorized
agent require him to remove such tools plants, materials or stores from
his premises within a time to be specified in such notice and in the event
of the contractor failing to comply with any such requisition, the City
Engineer may remove them at the contractor‟s expense or sell them by
auction or private sale at the risk and cost of the contractor in all respect,
and the certificate of the Executive Engineer as to the expense of any
such removal, and the amount of the proceeds and expenses of any
such sale shall be final and conclusive against the contractor.
CLAUSE 5: FINAL CERTIFICATE
On completion of the work the contractor shall be furnished with a
certificate by the City Engineer of such completion but no such certificate
shall be given or considered to be complete until the contractor shall
have removed from the premises on which the work shall have been
executed all scaffolding, surplus materials and rubbish and shall have
cleaned off the dirt from site or any rubies or such other parts, etc.
CLAUSE 6 : PAYMENT OF REDUCED RATES ON ACCOUNT OF
ITEMS OF WORKS NOT ACCEPTED AS COMPLETED TO
BE AT THE DISCRETION OF THE EXECUTIVE
The rates for several items of works estimated to cost more that Rs.
1,000/- agreed to within, shall be valid only when the item concerned is
accepted as having been completed fully in accordance with the
sanctioned specifications. In cases where the items of work are not
accepted as so completed the Executive Engineer may make payments
on account of such items at such reduced rates as he may consider
reasonable in the preparation of final or on account bills.
CLAUSE 7 : BILLS TO BE ON PRESCRIBED FORM
The contractor shall submit all bills on the prescribed forms to engineer
in charge. The charges to be made in the bills shall always be entered at
the rates specified in the tender or in the case of any extra work ordered
in pursuance of these conditions, and not mentioned or provided for in
the tender, at the rates herein after proved for such work.
CLAUSE 8: WORKS TO BE EXECUTED IN ACCORDANCE WITH
SPECIFICATIONS, DRAWINGS, ORDERS, ETC.
The contract shall execute the whole and every part of the work in the
most substantial and workman like manner, and both as regards
materials and in every other respect in strict accordance with the
specifications. The contractor shall also confirm exactly full and faithfully
to the designs, and instructions in writing relating to work signed by the
Executive Engineer
And lodge in his office and to which the contractor shall be entitled to
have access for the purpose of inspection of such office or on the site of
the work during the office hours and the contractors shall if he so
requires, be entitled at his own expenses to make or cause to be made
copies of the specifications and of all such designs, drawings or
instruction aforesaid.
CLAUSE 09 : ALTERATIONS IN SPECIFICATIONS AND DESIGNS NOT
TO BE INVALIDATE CONTRACTS. RATES FOR WOKS
NOT ENTERED OR SCHEDULE RATE.
The City Engineer shall have power to make any alteration in or addition
to the original specifications, drawings and instructions that may appear
to him to be necessary or advisable during the progress of the work and
the contractor shall be bound to carry out the work in accordance with
any instruction in this connection which may be given to him in writing
signed by the City Engineer / Executive Engineer and such alteration
shall not invalidate contract. Any additional work which the contractor
may be directed to do in the manner above specified as part of the work
shall be carried out by the contractor on the same conditions in all
respect on which he agreed to do the main work, and at the same rates
as are specified in the tender for the main work. And if the additional and
altered in the tender for the work, and if the additional and altered work
includes any class of works for which no rate is specified in this contract,
then such class of works shall be carried out at the rates entered in the
Scheduled Rates or at the calculated rates whichever are lower. If the
additional or altered work for which no rate is entered in the Schedule of
Rates in ordered to be carried out before the rates are agreed upon then
contractors shall within seven days of the date of receipt by him of the
order to carry out the work, inform the Executive Engineer of the rate
which he is intention to charge for such class of work, and to arrange to
carry out in such manner as he may consider advisable provided always
that if the contractor shall commence work or incurred any expenditure in
regard there to before the rates shall have been determined as lastly
here in before mentioned then in such cases, he shall only be entitled to
be paid in respect of the work carried out or expenditure incurred by him
prior to such date of the determination of the rate as aforesaid according
to such rates as shall be fixed by the Executive Engineer, in the event of
a dispute, the decision of the City Engineer will be final. Where however,
the work is to be executed according the designs, drawings and
specifications recommended by the contractor and accepted by
VADODARA MUNICIPAL CORPORATION, the alteration above referred
shall be within the scope of such design, drawings and specifications
appended to the tender. The time limit for completion of works shall be
extended in the proportion that the increase in cost occasioned by
alterations or additions bears to the cost of the original contract work,
and the certificate of the Executive Engineer as such proportion shall be
CLAUSE 10 : NO COMPENSATION FOR ALTERATION OR
RESTRICTION OF WORK.
If at any time after execution of the contract documents, the City
Engineer shall, for any reason what so ever, require the whole or any
part of the work, as specified in the tender, to be stopped for any period
or shall not require the whole or part of the work to be carried out at all or
to be carried out by the contractor, he shall give notice in writing of the
fact to the contractor, who shall there upon suspend or stop the work
totally or partially, as the case may be. In any such case, except as
provided here under, the contractor shall have no claim to any payment
or compensation what so ever on account of any profit or advantage
which he might have derived from the execution of the work in full but
which he did not so derive in consequence of the full amount of the work
not having been carried out, or on account of any loss that he may be put
on account of materials purchased or agreed to be purchased, or for
unemployment of labour recruited by him. He shall not have also any
claim for compensation by reason of any alteration having been made in
the original specifications, drawings, designs and instructions which may
involve any curtailment of the work as originally contemplated. Where
however, materials have already been purchased or agreed to be
purchased by the contractor before receipt by him of the said notice, the
contractor shall be paid for such materials at the rates determined by the
Executive Engineer provided they are not in excess of requirements and
are of approved quality and / or shall be compensated for the loss if any,
that he may be put to, in respect of materials agreed to be purchased by
him, the amount of such
compensation to be determined by the Executive Engineer whose
decision shall be final. If the contractor suffers any loss on account of his
having to pay labour charges during the period during which the
stoppage of work has been ordered under this clause, the contractor
shall, on application be entitled to any compensation on account of
labour charge as the Executive Engineer, whose decision shall be final
may consider reasonable. Provided that the contractor shall not be
entitled to any compensation on account of labour charges if, in the
opinion of Executive Engineer, the labour could have been employed by
the contractor elsewhere for the whole or part of the period during which
the stoppage of the work has been ordered as aforesaid.
CLAUSE 11 : NO CLAIM TO COMPENSATION ON ACCOUNT OF LOSS
DUE TO DELAY IN SUPPLY OF MATERIALS BY THE
VADODARA MUNICIPAL CORPORATION OR
PROCUREMENT OF MATERIAL FROM MARKET.
The contractor shall not be entitled to claim any compensation from the
VADODARA MUNICIPAL CORPORATION for the loss suffered by him
on account of delay by the VADODARA MUNICIPAL CORPORATION in
the supply of materials or entered in the Schedule A, or procurement of
material from market by contractor where such delay is caused by
1. Force Majeure
3. Act of enemies of the State or any other reasonable cause beyond
the control of Vadodara Municipal Corporation.
CLAUSE 12 : ACTION AND COMPENSATION PAYABLE IN CASE OF
If at any time before the performance Gerrantee is refunded to the
contractor, it shall appear to the City Engineer or his subordinate in
charge of the work that any work has been executed with unsound,
imperfect or unskilled workmanship or with materials of inferior quality, or
that any materials or articles provided by him for the execution of the
work are unsound or of a quality inferior to that contracted for, or are
otherwise not in accordance with the contract, it shall be lawful for the
City Engineer to intimate this fact in writing to the contractor and then not
with standing the fact that the work materials or articles complained of
may have been inadvertently passed, certified and paid for the contractor
shall be bound forthwith to rectify or remove and reconstruct the work so
specified in whole of or in part as the case may require, or if he is
required, shall remove the material or articles so specified and provided
other proper and suitable materials or articles at his own charge and
cost; and in the event of his failing to do so within a period to be specified
by the City Engineer in the written intimation aforesaid the contractor
shall be liable to pay compensation at the rate of one per cent on the
amount of the contract sum for every day not exceeding ten days, during
which the failure so continues, and in the event of any such failure as
aforesaid the City Engineer may rectify or remove and re-execute the
work or remove and replace the materials or articles as complained of as
the case may be at the risk and expense in all respect of the contractor.
If the City Engineer consider that any such inferior work or materials as
described above may be accepted or made use of, it shall be within his
discretion to accept the same at such reduced rates as he may fix here
CLAUSE – 13: WORKS TO BE OPEN TO INSPECTION. CONTRACTOR
OR REASONABLE AGENT TO BE PRESENT
All works under or in course of execution in pursuance of the contract
shall at all times be open to the inspection and supervision of the City
Engineer and his subordinates or agents appointed by Vadodara
Municipal Corporation and the contractor shall at all times during the
usual working hours and at all other times at which reasonable notice of
the intention of the City Engineer or his subordinate or agents appointed
by Vadodara Municipal Corporation to visit the works shall have been
given to included. In the specification or other documents forming part of
the contract referred to in these conditions or not and which may be
necessary for the purpose of satisfying or complying with the
requirements of the City Engineer as to any matter on which under these
conditions he is entitled to be satisfied or which he is entitles require
together with carriage, therefore, to and for the work.
The contractor shall also supply without charge the requisite number of
persons with the means and materials necessary for the purpose of
setting out works, and counting, weighing and assisting in the
measurement or examination at any time of the work or materials, failing
this the same may be provided by the Executive Engineer at the expense
of the contractor and the expense may be deducted from any money due
to the contractor under the contract or from his Security Deposit. The
contractor shall provide all necessary fencing and lights required to
protect the public from accident and shall also be bound to bear the
expense of defence of every suit, action or other legal proceedings, at
law, that may be brought by any person for injury sustained owing to
neglect of the above precautions, and to pay any damages and costs
which may be awarded in any such suit, action or proceedings to any
such persons or which may be with the consent of the contractor be paid
in compromising any claim by any such person.
Clause-14 Deleted.
CLAUSE 15 : HOISTING APPLIANCES ETC.
The contractor shall comply with the following regulations as regards the
Hoisting Appliances to be used by him :
a. Hoisting machines and tackle : including their attachments,
anchorages and supports, shall
(I) e of good mechanical construction, sound material and
adequate strength and free patent defect; and
(II) be kept in good repair and in good working order.
b. Every rope used in hoisting or lowering materials or as a means or
suspension shall be of suitable quality and adequate strength and
free from patent defect.
c. Hoisting machines and tackle shall be examined and adequately
tested after erection on the site and be reexamined in position at
intervals to be prescribed by VADODARA MUNICIPAL
d. Every chain, ring, hook, shackle, swing and pulley block used in
hoisting or lowering materials or as means of suspension shall be
periodically examined.
e. Every crane driver or hoisting appliance operator shall be properly
f. No person who is below the age of 20 years shall be in control of
any hoisting machine including any winch or give signals to the
g. In the case of every hoisting machine and of every chain, ring,
hook, shackle, swivel and pulley used in hoisting or lowering or as
a means of suspension the safe working load shall be ascertained
by adequate means.
h. Every hoisting machine and all gear referred to in the preceding
regulation be plainly marked with the safe working load.
i. In the case of hoisting machine having a variable safe working load
each safe working load and the conditions under which it is
applicable shall be clearly indicated.
j. No part of any hoisting machine or any gear referred to in
regulation above shall be loaded beyond the safe working load
except of the purpose of testing.
k. Motors, gearings, transmissions, electric wiring and other
dangerous parts of hoisting appliances shall be provided with
efficient safeguards.
l. Hoisting appliances shall be provided with such means as will
reduce to a minimum the risk of the accident descent of the load.
m. Adequate precautions shall be taken to reduce to a minimum risk
of any part of a suspended load becoming accidentally displaced.
CLAUSE 16 : MEASURES FOR PREVENTION OF FIRE
The Contractors shall not set fire to any standing jungle, trees
brushwood or grass without a written permit from the City Engineer.
When such permit is given and also in all cases when destroying out of a
dug up trees, brushwood, grass etc. by fire, the contractor shall take
necessary measures to prevent such fire spreading to or other wise
damaging surrounding property.
CLAUSE 17 : LIABILITY OF CONTRACTOR FOR ANY DAMAGE DONE
IN OR OUTSIDE WORK AREA
Compensation for all damage done intentionally or unintentionally by
contractor‟s laborer whether in or beyond the limits of the work site
including any damages caused by the spreading of Fire mentioned in
clause 18 shall be estimated by the Executive Engineer or such other
officer as the Vadodara Municipal Corporation may appoint and the
estimates of the Vadodara Municipal Corporation shall be final and the
contractor shall have to pay the amount of the assessed compensation
on demand failing which the same will be recovered from the contractor
as damages in the manner prescribed in clause 1 or deducted
By the City engineer from any sums that may be due to or become due
from the Vadodara Municipal Corporation to the contractor under this
contract or otherwise. The contractor shall bear the expenses of
defending any action or other legal proceedings that may be brought by
any person for injury sustained by him owing to neglect of precautions to
prevent the spread of Fire and shall be also pay any damage and cost
that may be the court in consequence. However in any case Vadodara
Municipal Corporation can not be suit under any circumstances.
CLAUSE 18 : WORKS NOT TO BE SUBLET
The contractor shall not be assigned or subleted without approval of the
City Engineer and if the contractor shall assign or sublet his contract or
attempt to do so or become insolvent or commence any proceedings to
the adjudicated an insolvent or make any compensation with his
creditors or attempt to do so, the City Engineer may by notice in writing,
rescind the contract. Also if any bribe, gratuity, gift, loan, prerequisite
reward or advantage pecuniary or otherwise shall either directly or
indirectly be given, promised or offered by the contractor or any of his
servants or agents to any public officer or person in the employment of or
authorized by the VADODARA MUNICIPAL CORPORATION in any way
relating to his office or employment, if any such officer or person shall
become in any directly or indirectly interested in the contract, the
Vadodara Municipal Corporation may, by notice in writing rescind the
In the event of a contract being rescinded, the Security Deposit of the
contractor shall thereupon stand forfeited and be absolutely at, the
disposal of the VADODARA MUNICIPAL CORPORATION and the same
consequence shall ensure as if the contract had been rescinded under
clause 3 hereof and in addition the contractor shall not be entitled to
recover or be paid for any work therefore actually performed under the
CLAUSE 19: SUM PAYABLE BY WAY OF COMPENSATION TO BE
CONSIDERED AS REASONABLE COMPENSATION
WITHOUT REFERENCE TO ACTUAL LOSS.
All sums payable by contractor by way of compensation under any of
these conditions shall be considered as reasonable compensation on be
applied to the use of the VADODARA MUNICIPAL CORPORATION
without any reference to be actual loss or damage sustained and
whether any damages had not been sustained.
CLAUSE 20 : EXECUTION OF WORKS
All works to be executed under the direction and subject to the approval
in all respect of the Executive Engineer for the time being, who shall be
entitled to direct at what point or points and in what manner they are to
be commenced and from time to time carried on.
CLAUSE 21 : DECISION OF THE VADODARA MUNICIPAL
CORPORATION TO BE FINAL
Except where otherwise specified in the contract and subject to the
powers delegated to the Engineer-in-charge by the VADODARA
MUNICIPAL CORPORATION, the decision of the City Engineer for the
time being shall be final conclusive and binding on all parties to the
contract upon all question relating to the meaning of the specifications,
designs, drawings and instruction herein before mentioned and as to the
quality of workmanship or material used on the work or as to any other
question, claim, right, matter or thing whatsoever, in anyway arising out
of or relating to the contract designs, drawings, specifications estimates,
instructions, orders or these conditions or otherwise concerning the
works or the execution of failure to execute the same, whether arising
during the progress of the work or after completion of abandonment
CLAUSE 22 : WORK ON SUNDAY
No work shall be done on Sunday or Holiday without written permission
of Executive Engineer.
CLAUSE 23 : LUMP SUMS IN TENDER
When the estimate on which a tender is made includes lump sums in
respect of parts of the work, the contractor shall be entitled to payment in
respect of the items of work involved or the part of the work in question is
not in the opinion of the Executive Engineer capable of measurement,
the Executive Engineer may at his discretion pay the lump sum amount
entered in the contract and the certificate in writing of the Executive
Engineer shall be final and conclusive against the contract with regard to
any sum or sums payable to him under the provisions of this clause.
CLAUSE 24 : ACTION WHERE NO SPECIFICATIONS ARE AVAILABLE
In the case of work for which there is no such specification, work shall be
carried out in accordance with the P.W.D. or I.S.I. specifications and in
the event of there being no P.W.D. or I.S.I. specifications the work shall
be carried out in all respects in accordance with the instructions and
requirements of the Executive Engineer.
CLAUSE 25 : DEFINITION OF WORK
The expressions “Work” or “Works” whenever used in these conditions
shall unless, there be something in the subject or context repugnant to
such construction be constructed to mean the work or the works
contracted to the executed under or by virtue of the contract, where
temporary or permanent and whether original altered substituted or
CLAUE 26 : QUERRY FEES AND ROYALTIES, ETC.
All query fee, royalties, octroi dues and ground rent for stacking
materials, if any should be paid by the contractor.
CLAUSE 27 {A}: ACCIDENT OR INJURY TO WORKMAN
1. The contractor to Indemnify the VADODARA MUNICIPAL
The VADODARA MUNICIPAL CORPORATION shall not be liable
for or in respect of any damages or compensation payable by law
in respect or in consequence of any accident of injury to any
workman or other person in the employment of the contractor or
his any sub-contractor and contractor shall indemnify the
VADODARA MUNICIPAL CORPORATION against such damages
and compensation and against all claims, demands, proceedings,
costs, charges, expenses whatsoever in respect thereof or in
relation thereto.
2. Payments of Claims and Damages :
Vadodara Municipal Corporation have to pay any money in
respect of such claims or demands as aforesaid the amount so
paid and the costs incurred by the Vadodara Municipal
Corporation shall be charged to and paid by the contractor and the
contractor shall not be at liberty to dispute or question the right of
the Vadodara Municipal Corporation to make such payments not
with standing the same may have been made without his consent
or authority or in law or otherwise to the contrary.
CLAUSE 27 {B} COMPENSATION UNDER WORKMAN’S
COMPENSATION ACT.
The contractor shall be responsible for and shall pay any
compensation to his workers payable under the Workman‟s
compensation Act 1923, VII of 1923. hereinafter called the said
Act for injuries caused to the workers. If such compensation is
paid by the VADODARA MUNICIPAL CORPORATION as principle
under sub – section (I) of section 12 of the said Act on behalf of the
contractor, it shall be recoverable by the VADODARA MUNICIPAL
CORPORATION from the contractor under sub – section (2) of the
section. Such compensation shall be recovered in the manner laid
down in the Clause I above.
CLAUSE 28 : MEDICAL AID TO LABOUR
The contractor shall be responsible for and shall pay the expenses of
providing medical aid to any workman who may suffer a bodily injury as a
result of an accident. If such expenses are incurred by the VADODARA
MUNICIPAL CORPORATION the same shall be recoverable from the
contractor forthwith and be deducted without prejudiced to any other remedy
of the Vadodara Municipal Corporation from any amount due or that may
become due to the contractor.
CLAUSE 29 : SAFETY MEASURES
The contractor shall provide all necessary personal safety equipment
and first aid apparatus available for the use of the persons employed on
the site, shall maintain the following regulations in connection therewith.
a. The workers shall be required to use the equipment so provided by
the contractor and the contractor shall take adequate steps to ensure
proper use of the equipment by those concerned.
b. When work is carried on in proximity to any palce where there is a risk
of drawing all necessary equipment shall be provided and kept ready
for use and all necessary steps shall be taken for the prompt rescue
of any person in danger.
c. Adequate provision shall be made for prompt first aid treatment of all
injuries likely to be sustained during the course of the work.
CLAUSE 30 : CLAIM FOR QUANTITIES OF WORK ENTERED IN THE
Quantity shown in the tender are approximate and no claim shall be
entertained for quantity of work executed being either more or less than
those entered in the tender or estimate.
CLAUSE 31 : NO CLAIM FOR COMPENSATION FOR DELAY IN
STARTING THE WORK
No compensation shall be allowed for any delay caused in the starting of
the work on account of any problem related to acquisition of land delay in
administrative clearance of work. And for any delay in according
sanction to estimates.
CLAUSE 32 : CLAIM FOR COMPENSATION FOR DELAYING THE
EXECUTION OF WORK
No compensation shall be allowed for any delay in execution of the work
on account of water standing in borrow pits or compartments. The rates
ate inclusive for hard or cracked soil excavation in mud sub-soil water, or
water standing in borrow pits and no claim for an extra rate shall be
entertained unless otherwise specified.
CLAUSE 33 : ENTERING UPON OR COMMENCING ANY PORTION OF
The contractor shall not enter upon or commence any portion of work
except with the written authority and instruction of the Executive
Engineer or of his sub ordinate in charge of the work. Failing such
authority the contractor shall have no claim to ask measurements oR
payment for work.
CLAUSE 34 : LABOUR LAWS AND SAFETY REGULATIONS
i. No contractors shall employ any person who is under the age of
ii. No contractor shall employ donkeys or other animals with breaching of
string or thin rope. The breaching must be at least three inches wide and
should be of tape (Nawar).
iii. No animal suffering from soves, lameness or emaciation or which
immature shall be employed on the work.
iv. The Executive Engineer or his agent is authorized to remove any person
or animal found working which does not satisfy those conditions and no
responsibility shall be accepted by the Vadodara Municipal Corporation
for any delay caused in the completion of the work by such removal.
v. The contractor shall pay fair and reasonable wages to the workmen
employed by him in the contract undertaken by him. In the event of any
dispute arising between the contractor and his workmen on the grounds
that the wages paid are not fair and reasonable the dispute shall be
referred without delay to the Executive Engineer, who shall decide the
same. The decision of the Executive Engineer shall be conclusive and
binding on the contractor, but such decision shall not in any way affect
the condition in the contract regarding the payment to be made by the
Vadodara Municipal Corporation at the sanctioned tender rates.
CLAUSE 35 : ACCEPTANCE OF CONDITIONS BEFORE TENDERING
Any contractor who does not accept these conditions shall not be
allowed to tender for works.
CLAUSE 36 : Taxes, Duties, etc.
The rates to be quoted by the contractor must be inclusive of excise,
sales tax,Insurance and all other taxes Excluding GST etc. present & future
taxes be included. No extra payments onthis account will be made to the
contractor. GST WILL BE PAID SEPARATELY AS PER GOVT.NORMS.
CLAUSE 37 : Defect Liability Period
The defect liability period shall be Five 5 year as per work from the date
of final completion and acceptance of work by Vadodara Municipal
Corporation. Contractor shall submit performance guarantee bond of 5%
amount of total work for period as prescribed format by Vadodara
Municipal Corporation. The bank guarantee of Nationalized bank shall
be given for full defect liability period at a time. During defect liability
period, contractor shall make good any defect whatsoever nature
observed in different works, equipment, or in part of work,plant or
equipment by modifying/replacing/repairing of such defective units or
parts there at his own cost within a period of three days on hearing from
owner about such defect during liability period. In case Vadodara
Municipal Corporation may feel fit to repair/rectify/modify such work
without intimation incase of emergency/ importance of circumstances,
the contractor is liable to pay all expences incurred by Vadodara
Municipal Corporation. In case if contractor‟s failure to do so, it will be
got done by owner and entire cost shall be recovered from contractor‟s
performance guarantee bond in the form of bank guarantee or other
dues with the company.
CLAUSE 38 : ERRORS AND OMMISSIONS
The contractor should take no advantage of any apparent error or
omission in drawings or specifications and the City Engineer should be
permitted to make such corrections and interpretations as necessary to
fulfill the intent of the plans and specifications. Alterations, omissions or
correction in the drawings, diagrams or sketches or specifications shall
not constitute a case for a claim of extra payment or extension of time by
the contractor.
CLAUSE 39: INSURANCE AGAINST ACCIDENT ETC. TO WORKMEN
The contractor shall at his own expense carry and maintain insurance
with reputable Insurance Companies to his satisfaction but in no case
Vadodara Municipal Corporation will be responsible for any claim arise
due to inadequate amount and or improper provisions of insurance by
the contractor under the employees State Insurance Act,
Workmen‟s compensation and Employer‟s liability insurance,
Contractor‟s protective liability insurance and any other insurance
required under law or regulations from time to time for this contract.
CLAUSE 40 : ADDITIONAL SAFETY CODE
The contractor shall provide all necessary safety provisions as indicated
in safety code given along with this tender.
CLAUSE 41 : FOSSILS ETC.
All fossils, coins, articles or value of antiquity and structure and other
remains or things of geological or archeological interest discovered on
the site shall as between the Vadodara Municipal Corporation and the
contractor be deemed to be absolute property of the Vadodara
Municipal Corporation
CLAUSE 42 : PROGRAMME
The time allowed for execution of works shall be the essence of the
contract. The contract period shall commence from date of notice of
intimation to proceed. The tenderer at the time of submitting his tender
shall indicate to the construction schedule his program of execution of
work commensurate with the total time specified. The contractor shall
provide the Engineer-in-charge a detailed program of the time schedule
for execution of the works in accordance with the specifications and the
completion date, the entire program to be finalized by the contractor, has
to confirm the execution period mentioned along with the bill of quantities
in the tender documents. The Engineer-in-charge upon scrutiny of such
submitted program by contractor, shall examine suitability of it to the
requirement of contract and suggest modifications, if found necessary.
CLAUSE 43 : ALTERATION IN SPECIFICATION AND DESIGN AND
A) The Engineer-in-charge shall have power to make any alteration in,
omission from, addition to, substitution for, the schedule of rates, the
original specifications, drawings, designs and instructions that may
appear to him to be necessary or advisable during the progress of work
and the contractor shall be bound to carry out such altered/extra/new
items of work in accordance with any instructions which may be given to
him in writing signed by Engineer-in-charge and such alteration
omission, additions or substitution shall not invalidate contract and any
altered, addition or substituted work shall be carried out by the contractor
on the same conditions of contract. The time for completion may be
extended by Engineer-in-charge as may be considered just and
reasonable by him. The rates for such addition, altered or substituted
work shall be worked out as under
a) If the rates for addition, altered or substituted work are specified in the
contract for work, the contractor is bound to carry out such work at the
same rates as specified in the contract.
b) If the rates for additional, altered or substituted work are not specifically
provided in the contract for the work, the rates will be derived from the
rates of similar items or works in the contract of work. The opinion of
Engineer-in-charge as to whether the rates can be reasonably so derived
from the item of contract will be final and binding to the contractor.
c) If the rates of altered, addition or substituted work can not be determined
as specified in (a) or (b) above, the rates shall be paid as per S.O.R. of
VADODARA MUNICIPAL CORPORATION/PWD in the same of order
preference. In absence of S.O.R., rate analysis approved by the City
Engineer shall be final.
d) If the rates of altered, addition or substituted work can not be determined
as specified in (a) or (b) or (c) above, the contractor shall within seven
days of the receipt of order to carry out the work inform the Engineer-in-
charge of the rate which he intends to charge for
such work supported by rate analysis and the Engineer-in-charge will
determine the rate on the basis of prevailing market rates of materials,
labour cost at schedule of labour plus 10% thereon as contractor‟s
supervision overhead and profits. The opinion of Engineer-in-charge as
to market rate of materials and the quantity of labour involved per unit of
measurement will be final and binding on contractor.
But under no circumstances, the contractor suspends work on the plea of
non settlement of items falling under this clause.
CLAUSE 44 : TESTS FOR QUALITY OF WORK
1. The contractor shall be required to give satisfactory tests wherever
required and shall rectify the defects, if any free of cost. The necessary
water, power, labour etc. required for the h tests shall also be arranged
by the contractor at his own cost.
2. All workmanship shall be of the best kind described in the contract
documents and in accordance with the instructions of Engineer-in-charge
and shall be subjected from time to time to such tests at contractor cost
as the Engineer-in-charge may direct at the place of manufacture or
fabrication or on the site or at any such place. Contractor shall provide
assistance, instruments, labour and materials as are normally required
for examining, measuring and testing of any work or workmanship as
may be selected and required by Engineer-in-charge.
3. All tests necessary in connection with the execution of work as decided
by Engineer-in-charge shall be carried out at an approval laboratory at
contractor‟s cost.
4. Contractor shall furnish the Engineer-in-charge for approval when
requested or if required by the specification, adequate samples of all
materials and furnished goods to be used in work sufficiently in advance
to permit tests and examination thereof. All materials furnished and
finished goods applied in work shall be exactly as per approved samples.
CLAUSE 45 : PROCEDURE FOR MEASUREMENT OF WORK IN
1. All measurements shall be in metric system. All the work in progress
will be jointly measured by the representative of Engineer-in-charge and
contractor‟s authorized agent. Such arrangements will be got recorder in
the measurements book by the Engineer-in-charge or his authorized
representative and signed by the contractor or his authorized
representative and signed by the contractor or his authorized agent in
token of acceptance. If the contractor or his authorized agent fails to be
present whenever required by the Engineer-in-charge for taking
measurements for any reasons whatsoever, the measurement will be
taken by the Engineer-in-charge or his authorized representative not
withstanding the absence of contractor and these measurements will be
deemed to be correct and binding on the contractor.
2. Contractor will submit a bill in approved proforma in duplicate to the
Engineer-in-charge of the work giving abstract and detail measurements
of various items executed during a months as mutually agreed. The
Engineer-in-charge shall verify the bill and the claim, as far as
CLAUSE 46 : TAXES, DUTIES ETC.
1. Contractor agrees to and does hereby accept full and exclusive liability
for the payment of any and all taxes including sales-tax, duties, octroi or
entry tax etc. not or herein after imposed, increased or modified from
time to time in respect of work and materials and all contributions and
taxes for unemployment, compensation, insurance and old age pension
or annuities now or hereinafter imposed by the central or State
Government authorities with respect to or covered by the wages, salaries
or other compensation paid to the persons employed by contractor.
2. Contractor shall be responsible for compliance with all obligations and
restrictions imposed by the labour law or any other law affecting
employed-employee relationship.
3. Contractor further agree to comply and to secure the compliance of all
sub-contractor with applicable central, state, municipal and local laws
and regulations and requirement. Contractor also agrees to depend
indemnify and hold harmless the owner from any liability or penalty which
may be imposed by central, state or local authority by reasons any
violation by contractor or subcontractor of such laws, regulations or
requirements and also from all claims, suits or proceedings that may be
brought against owner arising under growing out of or by reasons
of work provided for by this contract by third parties or by central or State
Government authority or any administrative sub-division thereof.
4. At present there is no sales tax on work contract. Even if at later stage
same is imposed by Govt. the sales tax on work contract shall be borne
5. The contractor shall pay royalty tax as per the rate decided by
6. The contractor shall pay all taxes like sales, income tax, VAT, Service
tax or any other tax which are in force time to time. Vadodara Municipal
Corporation may not be any way hold responsible for any such taxes.
However Vadodara Municipal Corporation can ask to produce the tax
payment on the request from detail concern departments of Govt. or
Vadodara Municipal Corporation.
(A) In respect of all labour, directly or indirectly employed in the work for the
performance of contractor‟s part of this agreement, the contractor shall at
his own expense arrange for all the safety provision as per safety code
of P.W.D. and hand book on construction safety practice SP-70-2001
and building & other construction workers.
(Regulation of Employment & Condition of Services) Act 1996. The
contractor shall serve and abide by all fire and safety security rules and
regulations of the VADODARA MUNICIPAL CORPORATION.
(B) First Aid and Injuries
1. Contractor shall maintain first aid facilities to his employees and those of
his sub-contractors.
2. Contractor shall make outside arrangement for ambulance service and
for the treatment of injuries. Names of those providing these services
shall be furnished to VADODARA MUNICIPAL CORPORATION prior to
start of construction and their telephone numbers shall be prominently
displayed in contractor‟s field office.
3. All critical injuries shall be reported promptly to VADODARA MUNICIPAL
CORPORATION and copy of contractors report covering each personal
injury requiring the attention of a physician shall be furnished to
VADODARA MUNICIPAL CORPORATION.
( C ) Contractor‟s Barricades
1. Contractor shall erect and maintain barricades required in connection
with his operation to guard or protect.
b) Hoisting Areas
c) Areas adjudged hazardous by contractor‟s or VADODARA MUNICIPAL
CORPORATION‟s inspectors.
1. VADODARA MUNICIPAL CORPORATION‟s existing property
subjected to damage by ontractor‟s operations.
2. Rail road unloading spot.
3. Contractor‟s employees and those of his sub-contractors
shall become acquainted with VADODARA MUNICIPAL
CORPORATION‟s barricading practice and shall respect the
provisions thereof.
3. Barricades and hazardous areas adjacent to but not located in normal
routes of travel shall be marked by red lanterns.
5. Contractor shall have to make all the arrangement to cover and
protect the equipments and panels stored at work site or
installed and which are likely to be damaged due to this work.
The contractor shall provide suitable scaffolds and working platforms,
gangways and stairways as per required.
All necessary personal safety equipments as considered adequate by
the Executive Engineer should be kept available for the use of persons
employed on the site and maintained in a condition suitable for
immediate use and the contractor should take adequate steps to ensure
proper use of equipment by those concerned as per the clause (30) of
General Conditions of the Contract. To ensure effectively enforcement
of the rules and regulations relating to safety precautions, the
arrangements made by the contractor shall be opened to inspection by
the welfare officer, Safety Engineer or Executive Engineer of the
VADODARA MUNICIPAL CORPORATION or their representatives.
VADODARA MUNICIPAL CORPORATION
Special Conditions
SPECIAL CONDITIONS OF CONTRACT
(A) Special conditions of contract shall be read in conjunction with General
Conditions of Contract Material and job Specifications, Drawings and
other documents forming part of this contract.
1. No remedy for action taken under this clause :
No action taken by the VADODARA MUNICIPAL CORPORATION
under the clause shall receive the contractor or any of his liabilities
under the contractor or give rise to any right to compensation,
extension of time or otherwise, failing which the owner shall have
the right to remove such sub-contactors from the site.
2. Inconvenience to the Public :
The contractor shall not deposit materials on any site which will
cause seriously inconvenience to the public. The Executive
Engineer may require the contractor to remove any material which
are considered by him to be a danger or inconvenience to the
public or cause them to be removed at the Contractor‟s cost.
3. Approach Roads :
Contractors will be permitted to use the existing roads in the areas
for the purpose of transporting labourers and materials etc. The
VADODARA MUNICIPAL CORPORATION, however, will not
undertake to provide any approach road to the site of works. It
shall be entirely the
responsibility of the contractor to provide and maintain such
temporary roads at his own cost for the purpose of movement of
men, materials, and equipment. Layout of such approach roads
shall be submitted to the Executive Engineer for his approval
before undertaking the construction of the same.
4. Supply of Materials :
The contractor is required to keep himself in touch with the Deputy
Executive Engineer for the day-to-day position of supply of
materials to be supplied by owner, so as to adjust the program of
work accordingly in advance to avoid his labour remaining idle on
account of non-receipt of materials. No claim of extra payment due
to or arising form delay in supplying the materials by the Owner
shall be entertained, but a reasonable extension of period of
contractor may be considered if found justified. This is specified in
clause no. (14) of General Conditions.
5. Water Supply to Contractors:
The contractors shall make his own arrangement of water required
for construction, site office and labour camp. Contractor shall
make arrangement for receiving, storage and distribution of water
as per established norms and practice. VADODARA MUNICIPAL
CORPORATION shall not entertain any claim of contractor for
delays resulting on account of inadequate or irregular water supply.
Certified plumbers should be employed by the contractor on the
work for all the temporary sanitary and plumbing works.
6. Contractors Stores and Site Office :
Suitable area near the site of work shall be allocated free of rent to
the contractor for storing his equipment plant, materials, etc. and
for his site office. If suitable site near site of work is not available,
the contractor should prepare its site office away from the site of
the work as per the direction of the Executive Engineer.
7. Supply of Plant and Equipment Materials and Labour
The contractor shall make his own arrangements to produce all
construction plant and equipment for his work. He shall also
forward along with tender a list of type and number of the
equipment with their capacities in good working condition which he
will use at site to ensure completion of the work in specified time.
All materials, construction plants and equipments, etc. once
brought by the contractor on the site are not to be removed from
there without the written authority from the Executive Engineer.
Also, the contractor shall have adequate stock of spare parts for
the equipment on the site and work shall not be delayed on this
account. Similarly all enabling work built by the contractor for the
main construction undertaken by him are not be dismantled and
removed without the written authority from the Executive Engineer.
Thus contractor shall at his own expenses supply and provide all
the construction plant, temporary works materials both for
temporary and for permanent works, labour (including the
supervision thereof), transport to or from the site and in and about
the works and other things of every kind required for the
construction, completion and maintenance of the works.
08. Rubbish and Clearance of Site :
The contractor shall clean away all rubbish, vegetation, roots, sods
etc. and dump them in the area indicated by the Executive
Engineer and to his satisfaction. No separate rate shall be allowed
for the above. After the work is completed and a group of
structures handed over, the contractor shall clear the area
surrounding the work of all hutments, temporary structure and
excess stores and remnants of building materials such as
brickbats, sand, kapachi, timber, steel etc. at no extra cost the
VADODARA MUNICIPAL CORPORATION and land brought to its
original conditions.
09. Bench Marks
The contractor shall protect surveyor‟s bench marks line marks and
base line marks from damage of movement during the work.
The contractors shall inspect the site of work and ascertain site
conditions and the nature of soil to be excavated.
11.Execution of Works :
The contractor is responsible for the correct execution of his work
in accordance with the drawings provided to him and for all
mistakes due to working to wrong levels or center lines. When
levels, center lines and bench marks of reference have been once
given to him by the Deputy Executive Engineer in writing, it is his
responsibility to record, protect and maintain the said marks, and to
work to the same, and no complains can afterwards be attended to
for excess work done inconsequence of such levels not having
been kept up and maintained by the Contractor.
12. The contractor shall obtain the permission of the Executive Engineer
before installation of fixed construction machineries, connections from
pipelines, locations of temporary buildings including labour camps and
storage materials, points of tapping electricity supply of connection. Also
the contractor shall not energize any approval of the Executive Engineer.
13. The work shall be carried out in such a manner as not to interfere with or
affect, retard or disturb the progress of other works being executes by
other agencies.
14. The contractor shall submit to the Executive Engineer periodically as
required, information regarding the progress of work being carried out by
15. The contractor shall provide at his own cost adequate closets and
sanitary accommodation for all his workman employed on the site.
These shall be in accordance with the rules and regulations of the
owner. The lavatories and sanitary accommodation shall be maintained
in good sanitary, working and disinfected conditions.
16. The contractor shall not allow any visitors on the works except with the
approval of the owner.
17. If the headquarters of the tenderer are elsewhere than in Baroda, he
shall have a duly authorized agent at site from the commencement of
work until completion of the building work as specified. Such agent shall
be authorized to act on behalf of the contractor, to accept services of
notices under the contract and agree to extra, omissions and varied
items of work and rates for the same. Such agent shall maintain on his
staff a qualified engineer and such other personnel as may be required
for the efficient execution of the work. Any notice under the contract
shall be deemed to have been serviced on the contractor is served upon
such agent. The contractor to carry out any rectification under the terms
of the contractor after the work is completed. The contractor shall have
the same or another duly authorized are using carried out. This is
specified in clause no. (11) of General Conditions.
18. The successful tenderer shall send a duly authorized competent
representative at his expenses to meet the City Engineer at his office
whenever called upon in writing to do so by the City Engineer and any
instructions, directions or explanations given by the City Engineer to
such representatives shall be held to have been given to the successful
19. The contractor shall afford facilities to the Executive Engineer for a
physical check of such materials in stock in his godowns or at the site of
work, as and when desired by doing so the Executive Engineer.
20. During the progress of the construction work, if in the drawings,
diagrams and the sketches issued if any to the contractor for the
purpose of execution of work any omissions or inaccuracies are found
by the contractor, he shall bring the same forthwith to the notice of the
Executive Engineer and get them clarified immediately.
21. Metal,Brick bats,Sand,Yellow earth,stone dust, cement, steel, water,
machine/equipment man-power and any other material required for
construction shall be produced by contractor from open market.
Contractor shall identify potential sources of material and shall make
arrangements for adequate and time bound supply of these items.
Contractor shall have to get the supply sources and material approved
by Deputy Executive Engineer before bringing material to site. No
extension of time shall be granted for completion of work on account of
delays resulting due to non-availability of material, work, electricity etc.
22. Use of animals is prohibited.
23. Construction must keep on competent and experienced and qualified
Civil Engineer with experience or as directed by the City Engineer to get
best workmanship and day-to-day progress.
24. All the materials and the workmanship shall be the respective kind
described in the contract and in accordance with the Executive Engineer
instructions and shall be subjected from time to time, such tests as the
Executive Engineer may direct. The costs of such tests shall be borne
by the contractor. No extra claim will be entertained for the materials,
transport, labour, curing, preservation and supply of test samples of
interests and size and shape as directed by the Executive Engineer.
25. The contractor shall maintain an uptodate record register of the
materials issued to him, if any. One other register may also be kept
showing the quantum of work executed day-to-day together with
materials particularly cement used against each item.
26. A work order register which will also be called site instruction book will
be kept and maintained at site by contractor wherein the day-to-day
instruction may be noted down by the Dy.Executive Engineer or his
subordinate in charge of work. The violation of the instructions written
by the Dy. Executive Engineer or his subordinate in charge of the work
will be severely viewed. The obedience and strictly followed up of the
instructions will be obligatory on the part of the contractor.
27. The VADODARA MUNICIPAL CORPORATION shall also deduct from
running bills submitted by the contractor an amount equivalent as
applicable from time to time of the total amount of each of such running
applicable from time to time of the total amount of each of such running
bills towards income tax at source under the relevant provisions of
Income Tax Act.
28. The contractor shall indemnify the The contractor shall provide at his
own cost adequate closets and sanitary accommodation for all his
workman employed on the site. These shall be in accordance with the
rules and regulations of the owner. The lavatories and sanitary
accommodation shall be maintained in good sanitary, working and
disinfected conditions.
29. and every member and officer and employees of the VADODARA
MUNICIPAL CORPORATION against all the actions, claims, demands,
costs and expenses whatsoever arising out of or in connection with the
matter referred to in the above clause. The contractor shall be liable to
reimburse the VADODARA MUNICIPAL CORPORATION and keep
indemnify the employer in respect of all actions, claims, procedures,
demands, cost expenses which the VADODARA MUNICIPAL
CORPORATION may have to incure on account of default of the
contractor under the above clause.
30. The VADODARA MUNICIPAL CORPORATION will be entitled to deduct
from the bills to be paid to the contractor any sum or sums payable by
the contractors and which sum the VADODARA MUNICIPAL
CORPORATION in required to pay as a principle employer on account
of default of the contractor in respect of all liabilities referred to in above
31. Force Majure
If the performance of the agreement arising out of the acceptance
of the tenderer, quotation of the tenderer by the VADODARA
MUNICIPAL CORPORATION, is prevented or delayed or
interfered with by any act of nature, wars, act of enemy, blockades,
embargo, insurrections, riots, political or commotions, strikes,
lockouts, acts of Government or other industrial disturbance,
explosions or any
other cause whether enumerated or otherwise not within the
reasonable control of the tenderer or VADODARA MUNICIPAL
CORPORATION, all of which by the exercise of due diligence is
unable to foresee or overcome the Tenderer or the VADODARA
MUNICIPAL CORPORATION shall not be held responsible for the
non-performance of such agreement or prevention, delay
interference or suspension in the performance of such agreement
any thereof should bone or both the parties to such agreement be
prevented from fulfilling the contractual obligation by a state of
force Majeure lasting continuously for a period of three months,
both the parties shall consult with other regarding the future
implementation of such agreement.
For the force Majeure that lasts for less than three months, the
agreement shall remain as it is and suitable period equipment to
time of force Majeure shall be added in to total time limit for
performance of the contract.
33. Sole Arbitrator
Municipal Commissioner, VADODARA MUNICIPAL
CORPORATION shall be the sole Arbitrator. For any disputes &
differences of any kind arising out of or in connection with the
contractor or the carrying out of the works during the progress of
the works or after their completion shall be referred to & settled by
Municipal Commissioner, VADODARA MUNICIPAL
CORPORATION. The decision of the Municipal Commissioner
shall be final & binding to both parties.
The contractor shall take full responsibility for loss damages and
the care plant and works until it is delivered to site, erected,
commissioned and taken over by the owner. Without limiting such
responsibility, the contractor shall, in the joint names of the
contractor and the owner, to protect himself and the interest of the
owner, insure the plant and each part thereof for their full value
until they have been taken over. The contractor alone
has to bear the premium / other expenditure for such insurance.
Such insurance shall cover the equipment against loss, damages
or destruction by fire, lighting, earthquake, thefts, perils of the sea
of by any cause whatsoever, throughout the duration of the
contract. The contractor shall deposit the policy or policies and
receipts for the premium paid with the owner. All money received
under any policy shall be applied in or towards the replacement
and repair of the loss or damage. The insurance must include
provision for payment of foreign currency as may be necessary in
respect of any claim.
The work specified in the Tender for works expires taking into consideration the
extension of time, if any, for completion of the work, granted
under the relevant clause of the conditions of the contract in
cases other than those where such extension as necessitated on
account of default of the contractor. The decision of the City
Engineer as regards the Operative period of the contract, shall
be final and binding on the contractor.
List of Key Personnel to be deployed on Contract
Work (Reference Cl. 4.5.4)
# Employment of a qualified site Engineer by the Contractor.
The Contractor shall employ full-time technically qualified staff during
the execution of this work as under: -
1. Two graduate Civil Engineers and three diploma Civil Engineers
when cost of the work to be executed is more than Rs.50 lakhs.
2. One graduate & two Diploma, Civil Engineers when the cost of the
work to be executed is more than Rs.15 lakhs but less than Rs.50
3. Minimum one Diploma Civil Engineer when the cost of work is less
than Rs.15 lakhs but more than Rs.5 lakhs.
4. Minimum two Diploma Civil Engineers for the work when the cost
of work to be executed is less than Rs. 5 lakhs. The Engineer so
employed for the Government work must have sufficient
experience to handle the work independently. Such an Engineer
shall have to stay at the site of work and he shall not be entrusted
with other duty except this work.
In case the contractor or partner of the contractor firm is a Civil
Graduate Engineer, Employment of a separate Engineer will not be
necessary provided that the Engineer partner himself attends the
execution of the work on the site.
Within 15 days of issue of work-order the Contractor will have to
furnish to the Deputy Executive Engineer-in-charge of the work the
Name, Qualifications, copy of marksheet, Colour Photograph and
the appointment order issued such engineers engaged for this
contract work. If 15 days after issue of work order such designated
Site Engineers do not resume or do not remain present on site of
work, the recovery at the rate of Rs.15,000-00 per month per
Engineer will be made from the bills/deposit/dues of the contractor.
Such recovery shall be non-refundable.
૦૪.યસ્તાના આ કાભભાાં કાચા યસ્તા ાકા કયલા તથા ીવીવી અને એભ-૪૦ ગ્રેડ કોંડક્રટ (RCC Road)
૨૧. ઇજાયદાયે કયે ર કાભભા વયકાય/લી.એભ.વી .ભાન્મ વાંસ્થા અથલા R.I.T.E.S/ C.E.I.L./ WAPCOS /
VADODARA MUNICIPAL CORPORATION
TECHNICAL SPECIFICATION
(As per M.O.R.T.H./5th revision,Jan -2013 Table 400-9.)
Grading Size Range IS Sieve Per cent by
No. Designation weight
(As per M.O.R.T.H/5th revison, Jan -2013 Table 400-8)
Test Test Method Requirements
1. Los Angeles*** IS: 2386 (Part-4) 40 Per cent (Max)
Aggregate IS: 2386 (Part-4) 30 Per cent (Max)
Impact Value or
Flakiness and IS:
Elongation (Part-I) 35 Per cent (Max)
Indices (Total)
* Aggregates which gets soften in presence of water shall be tested for impact
value under wed condition accordance with IS
** The requirement of flakiness index and elongation index shall be enforced
only in the case of crushed broken stone and crushed slag
*** In case water bound macadam is used for sub base, the requirement in
respect of log angeles value and aggregate impact value shall be relaxed to
% and 40 % maximum respectively.
(As per M.O.R.T.H/5th revision, Jan -2013 Table 400-9)
IS Sieve Cumulative per cent by weight of total aggregate
Designation (mm) Passing
Coarse Aggregate
(As per M.O.R.T.H/5th revision Jan -2013 Table 500-3)
Test Test Method Requirements
1. Los Angeles IS: 2386 40 Per cent (Max)
Abrasion Value (Part-4)
Aggregate IS: 2386 30 Per cent
Impact Value (Part-4) or (Max)
Flakiness and IS: 2386 35 Per cent (Max)
Elongation (Part-I)
Indices (Total)
* Aggregates which gets soften in presence of water shall be tested for impact value
under wed condition accordance with IS
** The requirement of flakiness index and elongation index shall be enforced only in
the case of crushed broken stone and crushed slag
*** In case water bound macadam is used for sub base, the requirement in respect of
log angeles value and aggregate impact value shall be relaxed to 50 % and 40 %
maximum respectively.
(અ) ગ્રેડીંગ :- (As per I.S. 2386, I.S. 383)
IS Sieve Per cent by weight
Designation Passing.
નીચે ભુજફનુાં યશે ળ.ે Testing ની Frequency કાભના ઇજનેય ઇન ચાજડની વુચના ભુજફ કયલાની
(As per M.O.R.T.H/5th revision Jan-13 page. No. 443 Table 1000-2)
IS Sieve Size Per cent by Weight Passing the Sleve
600 micron 35-59
300 micron 8-30
150 micron. 0-10
Item 2:- Dismantling and demolition of RCC / PCC / Brick Work
The contractor shall have to dismantle existing RCC/ PCC/ Brick work according to requirement and
instruction of engineer- in-charge. The removed stuff shall be transported and placed without
affecting the work and general peoples according to instruction ofengineer-in-charge.
આમટભ નાંફય :૫ : GSB ભટીયીમર સ્થ ય રાલી રાઇન રેલર કે મ્ફયભાાં ાથયી આલાના
રાલલાનુાં યશે ળે જેના યમલ્ટી ાવ યજુ કયલાના યશે ળે. જેની CBR Value ૩૦ થી ઓછી શલી ન
જોઇએ.GSB ભટીયીમર અત્રેની વુચના ભુજફ રાઇન રેલર તથા કે મ્ફયભાાં ાથયી આલાનુાં યશે ળે
Grading for Granular Sub- Base Material ( As per Morth 5 th revision jan -13
IS Sieve Designation (M.M) Percent by weight Passing the IS
GSB ભટીયીમર અત્રેથી ાવ કયાલીને જ લાયલાનુાં યશે ળે.
GSB ભટીયીમરનુાં અત્રેથી વુચવ્મા ભુજફ ટે સ્ટીંગ કયાલી આલાનુાં યશે ળ.ે
GSB ભટીયીમર ય જરૂયી યોરીંગલોટયીંગ કયી આલાના કાભનુાં સ્ેળીકપકે ળન:-
GSB ભટીયીમર ય અત્રેથી વુચવ્મા ભુજફ લટયીંગ કયી ૮-૧૦ ટન લજનના લાઇબ્રેટય યરયથી
યરીંગ કયી આલાનુાં યશે ળે.લવાંગર રેમયભાાં ૨૦૦ ભી.ભી વુધીની જાડાઇના GSB ભટીયીમર ઉય
યરીંગ કયલાનુાં યશે ળે. જો GSB ની જાડાઇ (Thickness ) ૨૦૦ ભીભી થી લધુ શળે ત ફે રેમયભાાં
Providing and Laying Plain Cement Concrete
Good quality of cement, sand, gravel, shall be supplied for the work of plain cement concrete
1:2:4 / 1:3:6 / 1:4:8. The sand and the gravel shall be actually measured and mixed with cement in the
mixture machine to make uniform consistent concrete and this concrete shall only be used. Whenever
concrete is required to be mixed manually the same shall be mixed on the concrete / steel
platform using 10% more cement, which shall not be paid extra. When the
concrete is to be manually mixed, it shall be thoroughly mixed twice before the water is added
and twice after the water is added and when the concrete is of uniform color then only it can be
used. The concrete left unused for more than 20 minutes will not be allowed to be use. The form work for
the cement concrete work shall be strong and of very good quality. Oil shall be applied on it before the
concreting. The item shall include the rate of providing form work, centering nails, labour for removing
form work, etc., and no separate charge shall be paid for it. The concrete work shall be kept wet by
watering at least 3 times a day and cured for 15 days. The entire work shall be carried out using good
quality material and form work and employing skilled masons. The rate shall be per cubic meter of
Providing & laying compacted machine crushed black stone aggregate 250mm
thick/ as suggested thick wet mix macadam in two layers in the material with
water to OMC in mecanically mix (pug mill) carriage of mix material by tipper
to site laying,spreading and compacting in sub base of compacting power
vibrater roller to achive the desired density (mechanically laid with tractor
dozer) etc.complete.as per technical specification MORTH
Wet mix macadam mechanically laid with tractor dozer,paver finisher
406 WET MIX MACADAM SUB-BASE/BASE
This work shall consist of laying and compacting clean, crushed, graded aggregate and
granular material, premixed with water, to a dense mass on a prepared sub-grade/sub-
base or existing pavement as the case may be in accordance with the requirements of
Specifications. The material shall be laid in one or more layers as necessary to lines, grades
and cross-sections shown on the approved drawings or as directed by the Engineer.
The thickness of a single compacted Wet Mix Macadam layer shall not be less than 75 mm.
When vibrating or other approved types of compacting equipment are used, the compacted
depth of a single layer of the sub-base course may be upto 200 mm with the approval of the
406.2 Materials
406.2.1 Aggregates
406.2.1.1 Physical Requirements
Coarse aggregates shall be crushed stone. If crushed gravel/shingle is used, not less
than90 percent by weight of the gravel/shingle pieces retained on 4.75 mm sieve shall have
least two fractured faces. The aggregates shall conform to the physical requirements set
forth in Table 400-12.
If the water absorption value of the coarse aggregate is greater than 2 percent, the
test shall be carried out on the material delivered to site as per IS:2386
Table 400-12 : Physical Requirements of Coarse
Aggregates forWet Mix Macadam for Sub-base/Base
S. No. Test Test Method Requirements
1) Los Angeles Abrasion value IS:2386 (Part-4) 40 percent (Max.)
Aggregate Impact value IS:2386 (Part-4) or 30 percent (Max.)
2) Combined Flakiness and Elongation IS:2386 (Part-1) 35 percent (Max.)*
indices (Total)
To determine this combined proportion, the flaky stone from a representative sample should first
be separated out. Flakiness index is weight of flaky stone metal divided by weight of stone sample.
Only the elongated particles be separated out from the remaining (non-flaky) stone metal. Elongation
index is weight of elongated particles divided by totalnon-flaky particles. The values of flakiness index
and elongation index so found are addedup.
406.2.1.2 Grading Requirements
The aggregates shall conform to the grading given in Table 400-13. The aggregates shall
conform to the grading given in Table 400-13.
Table 400-13 : Grading Requirements of Aggregates for Wet Mix Macadam
IS Sieve Designation Percent by weight passing the IS Sieve
600.00 micron 8–22
75.00 micron 0–5
Material finer than 425 micron shall have Plasticity Index (PI) not exceeding
The final gradation approved within these limits shall be graded from coarse to fine and
not vary from the low limit on one sieve to the high limit on the adjacent sieve or vice versa.
406.3 Construction Operations
406.3.1 Preparation of Base
Clause 404.3.1 shall apply.
406.3.2 Provision of Lateral Confinement of Aggregates
While constructing wet mix macadam, arrangement shall be made for the lateral
of wet mix. This shall be done by laying materials in adjoining shoulders along with that of
mix macadam layer and following the sequence of operations described in Clause 404.3.3.
406.3.3 Preparation of Mix
Wet Mix Macadam shall be prepared in an approved mixing plant of suitable capacity
provision for controlled addition of water and forced/ positive mixing arrangement like
or pan type mixer of concrete batching plant. The plant shall have following features:
i) For feeding aggregates– three/ four bin feeders with variable speed
ii) Vibrating screen for removal of oversize aggregates
iii) Conveyor Belt
iv) Controlled system for addition of water
v) Forced/positive mixing arrangement like pug-mill or pan type mixer
vi) Centralized control panel for sequential operation of various devices
and precise process control
vii) Safety devices
Optimum moisture for mixing shall be determined in accordance with IS:2720 (Part-8) after
replacing the aggregate fraction retained on 22.4 mm sieve with material of 4.75 mm to
22.4 mm size. While adding water, due allowance should be made for evaporation losses.
However, at the time of compaction, water in the wet mix should not vary from the optimum
value by more than agreed limits. The mixed material should be uniformly wet and no
segregation should be permitted.
406.3.4 Spreading of Mix
Immediately after mixing, the aggregates shall be spread uniformly and evenly upon the
prepared sub-grade/sub-base/base in required quantities. In no case shall these be dumped
in heaps directly on the area where these are to be laid nor shall their hauling over a partly
completed stretch be permitted.
The mix may be spread by a paver finisher. The paver finisher shall be self-propelled of
adequate capacity with following features:
i) Loading hoppers and suitable distribution system, so as to provide a
smooth uninterrupted material flow for different layer thicknesses from
the tipper to the screed.
ii) Hydraulically operated telescopic screed for paving width upto to
8.5 m and fixed screed beyond this. The screed shall have tamping and
vibrating arrangement for initial compaction of the layer.
iii) Automatic levelling control system with electronic sensing device
to maintain mat thickness and cross slope of mat during laying
In exceptional cases where it is not possible for the paver to be utilized, mechanical means
like motor grader may be used with the prior approval of the Engineer. The motor grader
be capable of spreading the material uniformly all over the surface.
The surface of the aggregate shall be carefully checked with templates and all high or low
spots remedied by removing or adding aggregate as may be required. The layer may be
tested by depth blocks during construction. No segregation of larger and fine particles
be allowed. The aggregates as spread should be of uniform gradation with no pockets of
The Engineer may permit manual mixing and /or laying of wet mix macadam where small
quantity of wet mix macadam is to be executed. Manual mixing/laying in inaccessible/
locations and in situations where use of machinery is not feasible can also be permitted.
Where manual mixing/laying is intended to be used, the same shall be done with the
of the Engineer.
406.3.5 Compaction
After the mix has been laid to the required thickness, grade and crossfall/camber the same
shall be uniformly compacted to the full depth with suitable roller. If the thickness of single
compacted layer does not exceed 100 mm, a smooth wheel roller of 80 to 100kN weight
may be used. For a compacted single layer upto 200 mm, the compaction shall be done
the help of vibratory roller of minimum static weight of 80 to 100 kN with an arrangement for
adjusting the frequency and amplitude. An appropriate frequency and amplitude may be
selected. The speed of the roller shall not exceed 5 km/h.
In portions having unidirectional cross fall/superelevation, rolling shall commence from the
lower edge and progress gradually towards the upper edge. Thereafter, roller should
parallel to the center line of the road, uniformly over-lapping each preceding track by at least
one-third width until the entire surface has been rolled. Alternate trips of the roller shall be
terminated in stops at least 1 m away from any preceding stop.
In portions in camber, rolling should begin at the edge with the roller running forward and
backward until the edges have been firmly compacted. The roller shall then progress
towards the center parallel to the center line of the road uniformly overlapping each of the
preceding track by at least one-third width until the entire surface has been rolled.
Any displacement occurring as a result of reversing of the direction of a roller or from any
other cause shall be corrected at once as specified and/or removed and made good.
Along forms, kerbs, walls or other places not accessible to the roller, the mixture shall be
thoroughly compacted with mechanical tampers or a plate compactor. Skin patching of an
area without scarifying the surface to permit proper bonding of the added material shall not
Rolling should not be done when the sub-grade is soft or yielding or when it causes a
motion in the sub-base/base course or sub-grade. If irregularities develop during rolling
which exceed 12 mm when tested with a 3 m straight edge, the surface should be loosened
and premixed material added or removed as required before rolling again so as to achieve
a uniform surface conforming to the desired grade and crossfall. In no case shall the use of
unmixed material be permitted to make up the depressions.
Rolling shall be continued till the density achieved is at least 98 percent of the maximum
density for the material as determined by the method outlined in IS:2720 (Part-8).
After completion, the surface of any finished layer shall be well-closed, free from movement
under compaction equipment or any compaction planes, ridges, cracks and loose material.
All loose, segregated or otherwise defective areas shall be made good to the full thickness
the layer and recompacted.
406.3.6 Setting and Drying
After final compaction of wet mix macadam course, the road shall be allowed to dry for
406.4 Opening to Traffic
No vehicular traffic shall be allowed on the finished wet mix macadam surface. Construction
equipment may be allowed with the approval of the Engineer.
406.5 Surface Finish and Quality Control of Work
406.5.1 Surface Evenness
The surface finish of construction shall conform to the requirements of Clause
406.5.2 Quality Control
Control on the quality of materials and works shall be exercised by the Engineer in
406.6 Rectification of Surface Irregularity
Where the surface irregularity of the wet mix macadam course exceeds the permissible
tolerances or where the course is otherwise defective due to sub-grade soil getting mixed
with the aggregates, the full thickness of the layer shall be scarified over the affected area,
re-shaped with added premixed material or removed and replaced with fresh premixed
material as applicable and recompacted in accordance with Clause 406.3. The area treated
in the aforesaid manner shall not be less than 5 m long and 2 m wide. In no case shall
depressions be filled up with unmixed and ungraded material or fines.
406.7 Arrangement for Traffic
During the period of construction, arrangements for traffic shall be done as per Clause
406.8 Measurements for Payment
Wet mix macadam shall be measured as finished work in position in cubic metres.
The Contract unit rate for wet mix macadam shall be payment in full for carrying out the
required operations including full compensation for all components listed in Clause 401.7.
Testing Frequency :-
Sr.no. Test Frequency(Minimum)
1 Aggregate impact One test per 1000m3 of
value aggregate
2 Grading of Aggregate One test per 200 m3 of
3 Combined Flakiness One test per 500 m3 of
and elongation index aggregate
4 Atterberg limits of One test per 200 m3 of
portion of aggregate
passing 425 micron
5 Density of compacted One set of three test per
layer 1000 sqmt.
This item should be carrying out as per the specifications of Morth (5th revision).
Specification for RCC Road with trimix .
This work shall consist of furnishing and placing cement concrete M- 400 for trimix road
surface flooring of the shape and dimensions shown on the drawings and conforming to
these Specifications or as approved by the Engineer in charge.
Prior to the start construction the contractor shall design the mix and submit to the Engineer
in charge for approval the proportions of materials including admixtures to be used water
reducing admixtures ( Including plasticizers or super plasticizers ) may be used at the
contractors option subject to the approval of Engineer in charge Other types of admixtures
shall be prohibited unless specifically permitted by the Engineer in charge
Weigh Batch Machine of appropriate capacity shall be used continuously during the
entire process of execution of this item
In the designation of a concrete mix, letter "M" refers to the mix and the number the
specified 28 days works cube compressive strength of that mix on 150 mm. cubes
expressed in kg./cm2
1.1 Water shall not be salty brackish and shall be clean reasonably clear and free objectionable
quantities of silt and traces of oil j\injurious alkalis salts organic matter and other
deleterious material which will either weaken the mortar of concrete or cause
efflorescence or attack the steel in R C C container for transport storage and huddling of
water shall be clean, Water shall confirm to the standard specified in I S 455 -1978
1.2 If required by the Engineer in charge it shall be tested by comparison with distilled water
compression shall be made by means of standard cement tests for soundness time of
setting and mortar strength as specified in I S 269-1976 Any indication of unsoundness
charge in time of setting by 30 minutes or more or decrease of more than 10 percent
strength of mortar prepared with distilled water sample when compared with the result
obtained with mortar prepared with distilled water shall be sufficient cause for rejection of
water under test.
1.3 Water for curing mortar concrete or masonry should not be too acidic or too alkaline
1.4 It shall be free of elements which significantly affect the hydration reaction or otherwise
interface with the hardening of mortar or concrete during curing or those which produce
objectionable stains or other unsightly deposits on concrete or mortar surfaces
1.5 Hard and bitter water shall not be used for curing
1.6 Potable water will generally found suitable for curing mortar or concrete
2.1 Cement shall be ordinary Portland cement (OPC) confirming to IS: 12269(Latest edition)
2.2 Cement shall be stored above the ground level in perfectly dry and water tight sheds.
Wherever bulk storage containers are used, their capacity should be sufficient to cater to
the requirements at site and should be cleaned at least once every 3 to 4 months. The
aggregate shall be stored in such a way as to prevent admixture of foreign materials.
Different size of fine or coarse aggregate shall be stored in separate stock-piles sufficiently
away from the each other to prevent intermixing the materials. Add Polymer synthetic fibre
or equivalent 1kg per cubic meter as per mix design
3.1 Sand shall be natural sand, clean well graded, hard strong durable and gritty particular free
from immures amounts of dust, clay, kankar modules, soft: or flaky particles shall alkali
salts, organic matter, learn mica or other deleterious substance and shall be got approved
from the Engineer-in-charge. The sand shall not contain more than 8 percent of slit as
determined by field test. if necessary the sand.
Coarse Sand: The fineness modules of coarse sand shall not be less than 2.5 and shall
not exceed 3.0. The sieve analysis of coarse sand be as under:
I. S. Sieve Designation % by wt. passing
3.2 Fine Sand: The fineness module shall not exceed 1.0 the sieve analysis of fine sand be as
IS. Sieve Designation % by wt. passing
4.0 STONE COARSE AGGREGATE FOR MIX CONCRETE:
4.1 Coarse aggregate shall be machine crushed stone of black trap and hard, strong, dense,
durable, clean and free from disintegrated pieces, organic and other deleterious matter.
1.2 The aggregate shall be generally be cubical in shape unless special stones of particular
quarries are mentioned. Aggregate shall be machine crushed from the best black trap.
Aggregate shall have no deleterious reaction with cement. The size of the coarse
aggregate for plain cement concrete and ordinary reinforced cement shall generally as per
the table given below
IS Sieve % passing for single sized aggregate of nominal size
IS Sieve % passing for single sized aggregate of nominal size
Note: This percentage may be varied some what by the Engineer-in-charge when considered
necessary containing better and strength of concrete.
4.3 The grading test shall be taken in the beginning and at the change of source of material as
indicated in I.S. 383-1970 and I.S. 456-1978. Aggregate shall be stored separately and
handled in such a manner so as to prevent the intermixing diff aggregate if the aggregate
are covered with dust, they shall be washed with water to make them clean.
4.4 All materials shall be stored as to prevent their deterioration of their quality and fitness for
the work. Any material which has deteriorated or has been damaged or is otherwise
considered defective by the Engineer-in-charge shall not be used in the work. The
aggregate shall be stored in such a way as to prevent admixture of foreign materials.
Different size of fine or coarse aggregate shall be stored in separate stock-piles sufficiently
away from the each other to prevent intermixing the materials.
5.0 WORKMANSHIP
5.1 Prior to the start construction the contractor shall design the mix and submit to the Engineer
in charge for approval the proportions of materials including admixtures to be used water
reducing admixtures Before stating concrete the bed of foundation trenches shall be
cleared of all loose materials leveled watered and rammed as directed.
5.2 Mix shall be used including making c channel 75 mm x 75 mm required to level and slope
and thickness of the concrete road leveling of placed concrete with surface vibrator and
finishing with power floater shall be done Floater and trowel light booming the surface shall
be done Expansions joints shall be cut as directed
5.3 For sub base shall be leveled up prior to start the Trimix concrete.
The channel shall be placed on both side and shall be check by plumb & to spirit level
in true level and longitudinal slope and gradient and camber.
FOR MASS CONCRETE WORK. :
6.1 Dry coarse and fine aggregate and cement shall then be mixed thoroughly by turning over
to get a mixture of uniform colour.
6.2 Enough water shall then be added gradually and the mass turned over till a mix of required
consistency is obtained. The quantity of water shall be just sufficient to produce a dense
concrete of required workability for the purpose.
6.3 The concrete shall be mixed in a mechanical mixer. Mixers which have been out of use for
more than 30 minutes shall be thoroughly cleaned before putting in a new batch. Unless
otherwise agreed to be the Engineer in-charge, the first batch of concrete from the mixer
shall contain only two thirds of normal quantity of coarse aggregate. Mixing plant shall be
thoroughly cleaned before changing from one type of cement to another.
6.4 The method of transporting and placing concrete shall be approved by the Engineer-in
charge. Concrete shall be so transported and placed so that no contamination,
segregations or loss of its constituent material takes place. All form work and
reinforcement contained in it shall be cleaned and made free from standing water, dust,
snow or ice immediately before placing of concrete. No concrete shall be placed in any
part of the structure until the approval of the Engineer-in-charge has been obtained.
6.7 Unless otherwise agreed to by the Engineer-in-charge, concrete shall not be dropped into
place from a height exceeding 2 meters. When chutes are used they shall be kept clean
and used in such a way as to avoid segregation. When concreting has to be resumed on a
surface which has hardened, it shall be roughened, kept clean, thoroughly wetted, and
covered with a 13 mm. thick layer of mortar composed of cement and sand in the same
ratio as in the concrete mix itself. This 13 mm. layer of mortar shall be freshly mixed and
placed immediately before placing of new concrete. Where concrete has not fully
hardened, all laitance shall be removed by scrubbing the wet surface with wire or bristle
brushes, care being taken to avoid dislodgement of any particles of coarse aggregate. The
Surface shall then be thoroughly wetted, all free water removed, and the coated with neat
cement grout. The first layer of concrete to be placed on this surface shall not exceed
mm. in thickness, and shall be well rammed against old work particular attention being
given to corners arid Close spots.
6.8 If concreting is not started within 24 hours of the approval being given, it shall have to be
obtained again from the Engineer-in-charge. Concreting being given, t shall proceed
continuously over the Area between construction joints. Fresh concrete shall not be placed
against concrete which has been in position for more than 30 minutes unless a proper
construction joint is formed. Concrete shall be compacted in its final position within
minutes of its discharge from the mixer unless carried in properly design agitators,
operating continuously, when this time shall be within 2 hours of the addition of cement to
the mix and within 30 minutes of its discharge from the agitator. Except where otherwise
agreed to be the Engineer-in-charge, concrete shall be deposited in horizontal layers to a
compacted depth of not more than 0.4-S-metre when internal vibrators are used and not
exceeding 0.30 meter in all other cases
6.9 In the case of reinforced concrete work workability shall be such that the concrete
surrounds and properly grips all reinforcement. The slump for pavement is maximum
MM and minimum 25 MM.
7.0 Providing and laying 125 micron thick standerd polythene film over entire P.C.C
8.0 Segregation
8.1 When concreting has to be resumed on a surface which has hardened, it shall be
roughened, swept, clean, thoroughly wetted and covered with a 13 mm. thick layer of
mortar shall be freshly mixed and placed immediately before placing of' new concrete.
Where concrete has not fully hardened, allegiance shall be removed by scrubbing the well
surface with wire or bristle brushes, care : being taken to avoid dislodgement of any
particles of coarse aggregate. The surface shall then be thoroughly wetted, with neat
cement grout. The first layer of concrete to be placed on the Is surface shall not exceed
150mm.in thickness, and shall be well rammed against old work particular attention being
given to corners and close spots.
9.0 Transporting & Placing the Concrete:
9.1 The concrete shall be handed from the place of mixing to the final position in not more than
15 minutes by the method as directed and shall be placed into its final position compacted
and finished within 30 minutes of mixing with water i.e. before the setting commences.
9.2 The concrete shall be laid in required depth.
9.3 All concrete shall be compacted to produce a dense homogeneous mass with the
assistance of vibrators, unless otherwise permitted by the Engineer-in-charge for
exceptional cases, such as concreting under water, where vibrators can not be used
sufficient vibrators in serviceable condition shall be kept at site so that spare equipment is
always available in the event of break downs.
9.4 After Placing
The mechanical vibrator shall be installed on channel and it shall be run in forwarded
direction of concrete placing. The vibrator shall be start and shall be use as per instruction of
Engineer-in-charge.
The water shall be suck by dewaterization equipment by spreading vaccum sheet on
concrete after sufficient vibrator the floating water shall be sufficiently suck from concrete so
that the sufficient strength of concrete shall be achieved.
The mechanical trowel shall be start after dewatering from concrete. The trowel shall be
run in such a way that the required finish top surface of concrete shall be achieved mat finish or
10.1 Immediately after compaction, concrete shall. be protected against harmful effects of
weather, including rain, running water, shocks, vibration, traffic, rapid temperature
charges, frost and driving out process shall be covered with wet jute bags or the similar
absorbent material approved by the Engineer-in-charge soon after the initial set, and shall
be kept continuously wet for a period of not less than 14 days from the date of placement.
Masonry work over the foundation concrete may be started after 48 hours of its laying but
the curing of concrete shall be continued for a minimum period of 14 days.
10.2 After the final set, the concrete shall be kept continuously wet if required by pounding for a
period of not less then 7 days form the date of placement. Hard and bitter water shall not
be used for curing. If curing is not possible by water then curing compound shall be
used as per necessity.
11.0 Mode of Measurement & Payment :
11.1 The payment will be made on Cum. basis of the finished work.
11.2 In reinforced concrete the volume occupied by reinforcement shall not be deducted. The
slab shall be measured as running continuously through and the beam as the portion
below the slab.
11.3 All necessary labour, materials Equipment, etc for sampling, preparing test cubes, curing
etc. shall be provided by the Contractor. Testing of the materials and concrete may be
arranged by the Engineer in charge in an approved laboratory at the cost of the
11.4 The unit rate concrete shall include the cost of all materials, tools and plant required for
mixing, placing in position, compacting, and cost Water recuding concrete ad mixture at
100 ml per bag of cement and making channel 75 mm x 75 mm required to level and
slope and thickness of the concrete road leveling of placed concrete with surface vibrator
and finishing with power floater and trowel light booming the surface and cutting
Expansions joints by machine as directed by The Engineer in charge and finishing as per
direction of the Engineer-in-charge, curing and all other incidental expenses for producing
concrete of specified strength to complete the structure or its components as shown on
the drawings and according to these specifications. They shall also include the cost of
making, fixing and removing of all centering and forms required for the work.
11.5 The concrete shall be measured for its length breadth limiting dimensions to those
specified on plan or as directed.
11.6 The rate shall be for a unit of One Cum.
12.0 The contractor must bring mix design for M40 grade concrete before commencing the
Item No.: ૧૧ Bitumen Filler Material and Contraction Joint as per direction :
The bitumen shall be paving bitumen of viscocity grade complying with Indian Standard specifications
for „paving bitumen‟ I.S.: 73:2006.Guidance on the selection of an appropriate grade of bitumen is given
in the manual for construction and supervision of bituminous works.
Providing & Fixing Bitumen filler of 25mm thick as Expansion Joint.& Contraction Joint as per direction
by Engineer In Charge.
High Yield Strength Steel Deformed Bars.
8.1. High yield strength steel deformed bars shall be either cold twisted or rolled and shall conform to
I.S. 1786-1966 and I.S. 1139-1966 respectively. And ISI Mark is compulsory .
The, Tmt. steel reinforcement to be used in the structures shall be tested according to the
standard specifications and test results shall have to be submitted. The diameters and the
length of the bars shall be according to the design and shall be free from any rust or color on
it. The item includes cutting , bending, binding and tying using binding wires after arranging
as shown in the drawing. The reinforcement shall be got approved from the Engineer in
The rate shall be per Kilogram weight of reinforcement.
The mild steel, Tor steel reinforcement to be used in the structures shall be tested according to the
standard specifications. The diameters and the length of the bars shall be according to the design
and shall be free from any rust or colour on it. The bars shall be cut to sizes, and tied using binding
wires after arranging as shown in the drawing. The reinforcement shall be got approved from the
Engineer in charge.
2 Specification for TMT bars reinforcement
Scope of work :
The scope of work consists of providing and laying mild steel reinforcement and TMT FE-500D
reinforcement for RCC works of various components of the structure. This may be approved
manufacturer branch and confirming to IS – 1786 approved by the Engineer-in-charge. This
includes cuttings, bending, binding, placing, with all equipments and labour required for the work as
directed by the Engineer-in-charge and all operations covered within the intent and purpose of the
Bending of Reinforcement :
Reinforcing steel shall conform accurately to the dimensions shown on relevant drawings and
conforming to the relevant IS codes (latest revision)
Bars shall be bent cold to the specified shape and dimensions or as directed by the Engineer-in-
charge using a proper bar bender, operated by hand or power to attain proper radii of bends.
Bars shall not be bent or strainghened in a manner that will cause injury to the material.
Bars bent during transport or handling shall be straightened before being used on work; they shall not be
heated to facilitate bending.
The bending of the TMT FE-500D bars shall be carried out as per the following :
Sr. No. Operation Size TMT FE-500D
1 Bend Upto 22 mm dia. 3d
Over 22 mm dia. 4d
2 Rebend Upto 10 mm dia. 4d
Over 10 mm dia. 5d
Placing of Reinforcement :
All reinforcing bars shall be accurately placed in the exact position shown on the drawings, and shall be
securely held in position during placing of concrete by annealed binding wire not less than 1 mm. in size and
conforming to IS : 280 and by using stays blocks or metal chairs, spacer, metal hangers, supporting wires or other
approved devices at sufficiently close intervals. Bars will not be allowed to sag between supports nor displaced
during concreting or any other operation over the work. All devices used for positioning shall be of noncorrodible
material. Wooden and metal supports will not extend to the surface of concrete, except where shown on the
drawings, Placing bars on layers of freshly laid concrete as the work progresses for adjusting bar spacing will not
be allowed. Pieces of broken stone, brick or wooden blocks shall not be used. Layers of bars shall be separated by
spacer bars, precast mortar blocks or other approved devices.
Reinforcement after being placed in position shall be maintained in a clean condition untill completely embedded
in concrete. Special care shall be exercised to prevent any displacement of reinforcement in concrete already
To protect reinforcement from corrosion, concrete cover shall be provided as indicated on the drawings. All bars
protruding from concrete to which other bars are to be spliced and which are likely to be exposed for an indefinite
period shall be protected by a thick coat of neat cement grout.
In the case of columns and walls, vertical bars shall be kept in normal position with timber templates having slots
accurately cut in for bar position. Such templates shall be removed after the concreting has progressed upto a level
just below them.
Bars crossing each other, where required, shall be secured by binding wire (annealed) of size not less than 1 mm
and conforming to IS : 280 in such a manner that they do not slip over each other at the time of fixing and
concreting. As far as possible, bars of full length shall be used. In case this is not possible, overlapping of bars shall
be done as directed by the Engineer-in-charge. When practicable, overlapping bars shall not touch each other, but
be kept apart by 25 mm or 1 1/4 times the maximum size of the coarse aggregates whichever is greater, by concrete
between them. Where this is not feasible, overlapping bars shall be bound with annealed steel wire, not less than
1mm thickness twisted tight in eight shape around the lapped bars. The overlaps shall be staggered for different
bars and located at fixed locations only along the span where neither shear nor bending moment is maximum.
Welding of Bars
Welding of TMT bars can be permitted if specified on the drawings, joints of reinforcement bars shall be
butt welded so as to transmit their full strength. Welded joints shall preferably be located at points where steel will
not be subject to more than 75 percent of the maximum permissible stresses and welds so staggered that at any one
section, not more than 33 per cent of the rods are welded. No pre-warming or post heat treatment is necessary.
Interpass temperature should be limited to 200oC with low heat input and equivalent strength low hydrogen type
electrode. Suitable means shall be provided for holding the bars securely in position during welding. It must be
ensured that no voids are left in welding and when welding is done in 2 or 3 stages, previous surface shall be
cleaned property. Ends of the bars shall be cleaned of all loose scale, rust. grease, paint and other foreign matter
before welding. Only competent welders shall be employed on the work. Welded pieces of reinforcement shall be
tested. Specimens shall be taken from the actual site and their number and frequency of tests shall be as directed by
the VADODARA MAHANAGARPALIKA Engineer in charge.
The TMT FE-500D bars shall be tested for any or all of the following tests as directed by the
Engineer-in-charge.
(i) Alternate immersion test
(ii) Salt spray test
(iii) Atmospheric exposure test
(iv) Sulphur dioxide test
(v) Potentio dynamic test
Measurements for payment
Reinforcement shall be measured in lengths separately for different diameters as actually used in the work
including overlaps/ From the length so measured the weight of reinforcements shall be calculated
in tonnes as per IS : 1732 lengths shall include hooks at ends, wastage, avoidable overlaps,
couplis and welded joints, spaced bars and annealed steel wire for binding shall not be measured
and cost of these items shall be deemed to be included in the rates for reinforcement
Rate for reinforcement shall include cost of all steel including procurement, cost of bending, placing,
binding and fixing in position as shown on the drawings and as directed by the Engineer in charge. It shall also
include cost of all devices for keeping reinforcement in approved position, cost of jointing as per approved method,
and all wastage, overlaps and spacer bars.
Note: Mild steel/tor steel reinforcement to be tested in compression (chemical and physical test)
which shall not be paid extra and has to be included in the tender by the contractor.
The rates shall be in Kilogram weight of reinforcement.
કોંરાક્ટય દ્વાયા સ્થે યથી નીક્ે ર MANHOLE COVER AND FRAME લડોદયા
Dismantling and demolition of RCC / PCC / Brick Work
The contractor shall have to dismantle existing RCC/ PCC/ Brick work according to requirement and
instruction of engineer- in-charge. The removed stuff shall be transported and placed without
affecting the work and general peoples according to instruction of engineer-in-charge.
Excavation for laying of Ductile Iron Pipe / RCC Pipe / Construction of Channel / Manholes &
Excavation in all types of soils, soft and hard up to 1.5 m. depth and from 1.5 m. to 9.0 m. depth
(keeping the clear cover of soil on the top of the pipe 1.2 m ). Line out along the alignment of the
pipe or channel using lime or suitable colour, getting it approved from the deputy engineer, breaking
the surface and excavating up to the required depth. The contractor shall provide at his own cost,
red light and a watchman during the night hours, and provide fencing using ropes on both the edges
of the trench before starting of work. The contractor shall keep a sign board with "Road closed -
Work in Progress" written on it. Along the alignment of pipe, breaking of the road surface,
removing stone paving carefully and also removing the rubbles, metal, bricks and stones and
dumping the excavated materialsviz; metal, brickbats, etc. 1.0 m. away from the trench and
protecting the excavated material till the work is complete. Excavation will be allowed to be carried
out up to maximum 100 m. length. Further excavation shall be permitted after laying of the pipe line
is complete in the excavated trench.
The work shall be executed in such a way that the water connections, drainage connection,
telephone, electric cables, etc., met during excavation are not damaged. If required these cables and
poles shall be supported properly, even then these lines and cables are damaged, the
contractor shall be held responsible. In case of damage to the water and drainage lines, electric
poles etc., during excavation the contractor shall repair the same at his own cost immediately. In
case such repair work is not attended immediately, it will be executed through other agency or
department and the entire repair expenditure shall be deducted from his bill or from the
amount payable to him.
Any diversion required in existing service lines/House connections coming in the line of work shall
have to be diverted by the contractor at his cost & risk, as per the instructions & directions of
Engineer-in-charge. Excavation shall be carried out in all types of soil, dry, moist or water logged.
If required the contractor shall procure his own pump and carry out the de-watering. The
places where the soil is soft or made-up (refilled), the contractor shall provide wooden
planks and supporting structure to the trench, to avoid any mishap or accident.
The excavated stuff shall be dumped at about 2 m. away from the trench (within 90 meter lead),
properly in the line and approach shall be provided across the trench at a suitable interval for the
public to cross over. The contractor's rate shall include excavation in all types of roads including
breaking brickwork, concrete, etc. No extra rate shall be payable for this work.
The rate shall be per cubic meter.
ITEM : Refilling :
After the pipes are laid and jointed / Storm Water Drains are constructed, the trenches shall be
refilled keeping the joints on both the sides open, in layers of 15 cm., watering, compacting /
ramming and refilling the balance trench after successful testing of pipe. The top 23 cm. layer in
the trench shall be refille with metal, brickbats and the broken pieces of asphalt road surface and
compacting the same using rammer.
The excess excavated material shall be carried and disposed off properly by the contractor
within VMC limits at the place shown by the department. In case extra earth is required for
refilling of the trench the contractor shall bring the earth at his own cost and satisfactorily
complete the refilling.
Rate shall be per cubic meter.
Rubble Filling :
Rubble filling shall be done using black trap stone rubbles of average size of 230 mm. The
interstices shall have to be filled with quarry spalls as directed by Engineer-in-Charge. The
item includes Loading, Transportation, Un-loading, Spreading, Laying, etc. comp.
Rubbles fulfilling the qualities as per provision in MORTH like water absorption, impact
value, uniform size/shape, etc. shall be used. The rate shall be per Cu.m.
Providing and Laying Plain Cement Concrete
Good quality of cement, sand, gravel, shall be supplied for the work of plain cement concrete
1:2:4 / 1:3:6 / 1:4:8. The sand and the gravel shall be actually measured and mixed with cement in
the mixture machine to make uniform consistent concrete and this concrete shall only be used.
Whenever concrete is required to be mixed manually the same shall be mixed on the
concrete / steel platform using 10% more cement, which shall not be paid extra. When the
concrete is to be manually mixed, it shall be thoroughly mixed twice before the water is added
and twice after the water is added and when the concrete is of uniform color then only it can be
used. The concrete left unused for more than 20 minutes will not be allowed to be use. The form
work for the cement concrete work shall be strong and of very good quality. Oil shall be applied on
it before the concreting. The item shall include the rate of providing form work, centering nails,
labour for removing form work, etc., and no separate charge shall be paid for it. The concrete work
shall be kept wet by watering at least 3 times a day and cured for 15 days. The entire work shall be
carried out using good quality material and form work and employing skilled masons. The rate shall
be per cubic meter of concrete.
આઈટભ :- ૧૮ Providing & supplying in standard length ISI mark rigid unplasticised PVC
pipes suitable for potable water with ringfit joint including cost of rings, as per IS specification
no. 4985/1988 including all local and central taes, transportatoin, freight charges, inspection
charges, loading, unloading b,conveyance to the departmental stores and includinng cost of
jointing materials etc. complete.6 kg/cm2
આઈટભ :- 19 Lowering, laying and jointing PVC pipes of following diameters including cost
of conveyance form store to site of works including cost of labour, material, cement solvent,
giving satisfactory hydraulic testing as per ISI code
આઈટભ :- 20 Dewatering By Pumping Set Of Required Capacity inclu. Temparary Platform
Carting Pumping at Site and Fixing The Same In Position Inclu All Accessories And Fuel And
Labour etc.Complete
Brickwork shall be done in bond as per design and with frog upwards necessary to make the bond.
The bricks shall be well burnt, free from crack, flows, stone, efflorescence, regular in shape and size
and shall have sharp and square sides and parallel faces to ensure uniformity of thickness of the
course of brickwork. Any random brick chosen as sample shall have a clear ringing sound
when struck with might hammer. Bricks shall not break when thrown over a height of 75cm. The
work of brickwork shall proceed in horizontal layers preferably for the complete length. All
courses shall be truly horizontal. This thickness of the mortar joint shall not exceed 12mm. There
shall be only 7 courses in a height of 60 cm.
Before being used in the work all bricks must be thoroughly soaked in water for atlas 4 hours. The
water absorption shall not be more than 18% of its own weight.
Racking of joints
In ordinary work and in all work to be covered up, the mortar in each joint shall be struck as the work
proceeds. When the brickwork is to be pointed or plastered the joints shall be racked clear of mortar
to a sufficient depth not less than 20mm while the mortar is still soft.
Watering the work
The work is to be kept well watered complete work is to be kept wetted for a period of 15 days.
The mortar shall be of Cement mortar proportions 1:6/ 1:3 as specified shall conform the
specifications of the mortar. The proportion shall be by volume All joints horizontal and vertical shall
be thoroughly and firmly filled in with mortar. The prepared mortar shall be used within 30 minutes
of adding water. So only such quantity of mortar shall be prepared which can be used within
minutes. The rate shall be per cum. Half brick wall masonry shall be paid on square meter basis.
Materials : Cement aggregates and water provided by the contractor for the item
shall confirm to the specifications of the materials in this tender and IS : 456 of
Smooth surface of concrete shall be suitably roughened to provide necessary bond, while in
masonry work, joints shall be racked out when mortar is green, all dirt, soot, oil or any other
material that might interfere with satisfactory bond shall be removed. The surface shall be
screened and scrubbed with fresh water and kept wet for six hours prior to plastering, it shall be
kept damp during the progress of work.
Patches of plaster 150mm x 150mm shall be put on about 3 meters apart as gauges to ensure
even plastering in one plane. In all plaster work, the mortar shall be applied with some what
more than the required thickness and well pressed into the joints, and the surface scrubber
and leveled with a flat wooden rule to give required thickness. Long straight edges shall be
freely used to ensure perfectly plane and even surface. All corners shall be finished to their true
angles or rounded as directed by the Engineer-in-charge. Plastering shall be done from top to
downwards. All exposed angles and junctions shall be carefully finished. The finished thickness
shall not be less than in any place. Finishing coat shall be provided to the plaster as specified. A
coat of cement and fine sand mortar or neeru (about 12mm thick) shall be applied to the surface
with a trovel to provide uniform texture while the base coat is still plastic. All plaster work shall
be kept damp continuously for 7 days. The rate shall be per square meter.
તેલા wearing layer લાા સયે યાળ ૬% લધ Water Absorption ન હોમ . રુંફાઇ તથા હાઇભાું
બ્રોક (M-40) ગ્રેડના રાલલાના યશેળે. Conforming to IS-15658:2006
૬૦.૦ ભી.ભી જાડાઇના M 40 ગ્રેડના ડીઝાઇનના લાયલાના યશેળે.CONFORMING IS. જેની
કોમ્પ્રેળીલ સ્રેન્થ નીચે જણાવ્મા મુજફની યશેળે. (AS PER DOC: CED)6064/ November
of Bureau of Indian Standards.
d. Compressive Strength requirements of concrete paver blocks.
e. (Clauses 6.2.5.2 and 9.1.4 of Ref.Doc.)
Sr.NO Grade of Paver Minimum Average 28 days Minimum Compressive
Block Compressive Strength Strength of Individiual
(N/mm2) Paver Block (N/mm 2)
(AS PER DOC: CEDS (6064) NOVEMBER-2003 Of Bureau of Indian Standards Clause 8.2 & 8.5)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender Doc west Zone 20 cr.RCC_compressed.pdf
1.0 Standard Bidding Document.pdf
Amendment RCC West ZONE 20CR.pdf
CORRIGENDUM
City Engineer Paripatra.pdf
CORRIGENDUM
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .