EXECUTIVE ENGINEER,NAU,NAVSARI
Construction of Boys Hostel for College of Agriculture at N.A.U., Waghai.
323534
NIT No.02 of 2026-27
Open
Civil Works - Buildings
Works
Navsari
14 documents required · 14 mandatory
₹6,000
D.D.O(DRAWING AND DISBURSHING OFFICER),Office of EE(Executive Engineer),NAU, Navsari
₹4.5 L
30 Jul 2026
30 Jul 2026
30 Jul 2026
19 Aug 2026
30 Jul 2026
120 days
NAVSARI AGRICULTURAL UNIVERSITY, NAVSARI.
NAME OF WORK: CONSTRUCTION OF BOYS HOSTEL FOR
COLLEGE OF AGRICULTURE AT, N.A.U., WAGHAI.
It. Quantity Rate Amount
Item Description Unit 1% L.C.
No Total (Rs.) (Rs.)
1 EXCAVATION for foundation UPTO 1.50m DEPTH 1922.10 Cu.m 159.30 160.89
including sorting out and stacking of useful materials
and disposing of the excavated stuff for all lead and lift
for Dense or hard soil… etc., complete as directed by
2 EXCAVATION for foundation FROM 1.50m to 3.00m 584.90 Cu.m 172.83 174.56
DEPTH including sorting out and stacking of useful
materials and disposing of the excavated stuff for all
lead and lift for Dense or Hard soil... etc., complete as
directed by E.I.C.
3 DEWATERING of water from excavated pit to have dry 300.00 Hour 175.00 176.75
surface for casting of concreting work of footing with
required HP motor and all other necessary pipes, tools
and plants, etc., complete as directed by E.I.C.
4 Providing and filling RUBBLES including hand packing 117.00 Cu.m 1090.80 1101.71
and filling interstices with quarry spalls for foundation
base including compacting etc. complete as directed by
5 Providing and laying LIME MORTAR 1:3 (1 lime putty / 39.00 Cu.m 1575.26 1591.01
equvalent dry hydrated lime : 1 coarse sand) and
curing consolidation with rammers complete to have
dry surface for PCC & footing … etc., complete as
directed by E.I.C.
6 PROVIDING AND FILLING SAND in plinth, foundation 158.40 Cu.m 484.44 489.28
and under floors including watering, ramming,
consolidating and dressing in layers not exceeding
20cms in thickness and in proper level and slope…
etc., complete by E.I.C.
7 Providing and laying CEMENT CONCRETE 1:3:6 (1 219.55 Cu.m 3075.91 3106.67
cement : 3 coarse sand : 6 hand broken stone
aggregates 40mm nominal size) and curing
consolidation with rammers complete excluding cost of
form work in Plinth … etc., complete as directed by
8 Providing & laying CONTROLLED CEMENT 142.55 Cu.m 4700.41 4747.41
CONCRETE M.250 including the cost of necessary
formwork, compacting with vibrator, curing & shuttering
in true line and level etc. but excluding cost of
reinforcement in RCC work for FOOTING for any type
of cross sectional area... etc., complete as directed by
It. Quantity Rate Amount
Item Description Unit 1% L.C.
No Total (Rs.) (Rs.)
9 Providing & laying CONTROLLED CEMENT 30.80 Cu.m 7986.87 8066.74
CONCRETE M.250 including the cost of necessary
formwork, compacting with vibrator, curing & shuttering
in true line and level etc. but excluding cost of
reinforcement in RCC work for COLUMN UPTO
PLINTH for any type of cross sectional area... etc.,
complete as directed by E.I.C.
10 Providing & laying CONTROLLED CEMENT 86.70 Cu.m 6474.27 6539.01
CONCRETE M.250 including the cost of necessary
formwork, compacting with vibrator, curing & shuttering
in true line and level etc. but excluding cost of
reinforcement in RCC work for GROUND BEAMS &
PLINTH BEAM for any type of cross sectional area...
etc., complete as directed by E.I.C.
11 Providing & laying CONTROLLED CEMENT 94.65 Cu.m 4706.91 4753.98
CONCRETE M.200 including the cost of necessary
formwork, compacting with vibrator, curing & shuttering
in true line and level etc. but excluding cost of
reinforcement in RCC work for PLINTH SLAB for any
thickness including making gissi in brick wall / column
for resting plinth protection's slab if required... etc.,
complete as directed by E.I.C.
12 Carrying out plinth treatment to post construction / 572.80 Sq.m 87.03 87.90
existing structure by spraying chemical solution for
TERMITE CONTROL TREATMENT including labour
and material consistent with I.S.I. specification. Using
Chlordene and Chiorpurfiles 20 EC. As per 6131_paret-
II Consentration weight one percent is recommended
i.e. one litre 20 EC chemical emulsion with 19 litre give
1% concrentration inclusive of one litre chemical
emulsion application at the rate of 5 Litre / Sq.m of
surface is recommended as per I.S. Etc. complete as
directed by EIC.
13 Providing and FILLING AVAILABLE EXCAVATED 1939.80 Cu.m 136.11 137.47
EARTH (excluding rock) in trenches of plinth, sides of
foundations… etc., in layers not exceeding 20cm in
depth consolidating each deposited layer by ramming
and watering… etc., complete as directed by E.I.C.
14 FILLING in plinth and foundation with MURRUM OR 820.10 Cu.m 301.58 304.60
SELECTED SOIL in layers not exceeding 20 cm in
depth consolidating each deposited layer by ramming,
watering and consolidating … etc., complete as
directed by E.I.C.
It. Quantity Rate Amount
Item Description Unit 1% L.C.
No Total (Rs.) (Rs.)
15 Providing and laying and constructing BRICK WORK 55.05 Cu.m 4237.60 4279.98
using common burnt CLAY building conventional brick
having crushing strength not less than 35 Kg/Sq.cm. IN
FOUNDATION AND PLINTH in cement mortar 1:6 (1
cement : 6 fine sand) in true line and level including
curing, scaffolding, rackingout the joints... etc.
complete as directed by E.I.C.
16 Providing & laying CONTROLLED CEMENT 24.85 Cu.m 7986.87 8066.74
A CONCRETE M.250 including the cost of necessary
formwork, compacting with vibrator, curing & shuttering
in true line and level etc. but excluding cost of
reinforcement in RCC work for COLUMNS for any type
of cross sectional area... etc., complete above plinth
level upto floor two level as directed by E.I.C.
16 Providing & laying CONTROLLED CEMENT 24.30 Cu.m 8028.23 8108.51
B CONCRETE M.250 including the cost of necessary
formwork, compacting with vibrator, curing & shuttering
in true line and level etc. but excluding cost of
reinforcement in RCC work for COLUMNS for any type
of cross sectional area... etc., complete from floor Two
level to Three level as directed by E.I.C.
16 Providing & laying CONTROLLED CEMENT 24.30 Cu.m 8069.59 8150.29
C CONCRETE M.250 including the cost of necessary
formwork, compacting with vibrator, curing & shuttering
in true line and level etc. but excluding cost of
reinforcement in RCC work for COLUMNS for any type
of cross sectional area... etc., complete from floor
Three level to Four level as directed by E.I.C.
16 Providing & laying CONTROLLED CEMENT 24.30 Cu.m 8110.95 8192.06
D CONCRETE M.250 including the cost of necessary
formwork, compacting with vibrator, curing & shuttering
in true line and level etc. but excluding cost of
reinforcement in RCC work for COLUMNS for any type
of cross sectional area... etc., complete from floor Four
level to Five level as directed by E.I.C.
16 Providing & laying CONTROLLED CEMENT 6.85 Cu.m 8152.31 8233.83
E CONCRETE M.250 including the cost of necessary
formwork, compacting with vibrator, curing & shuttering
in true line and level etc. but excluding cost of
reinforcement in RCC work for COLUMNS for any type
of cross sectional area... etc., complete from floor Five
level to Six level as directed by E.I.C.
It. Quantity Rate Amount
Item Description Unit 1% L.C.
No Total (Rs.) (Rs.)
16 Providing & laying CONTROLLED CEMENT 0.25 Cu.m 8193.67 8275.61
F CONCRETE M.250 including the cost of necessary
formwork, compacting with vibrator, curing & shuttering
in true line and level etc. but excluding cost of
reinforcement in RCC work for COLUMNS for any type
of cross sectional area... etc., complete from floor Six
level to Seven level as directed by E.I.C.
17 Providing & laying CONTROLLED CEMENT 50.05 Cu.m 6870.40 6939.10
A CONCRETE M.250 including the cost of necessary
formwork, compacting with vibrator, curing & shuttering
in true line and level etc. but excluding cost of
reinforcement in RCC work for BEAM AND LINTEL for
any type of cross sectional area... etc., complete above
Plinth level to floor Two level as directed by E.I.C.
17 Providing & laying CONTROLLED CEMENT 51.30 Cu.m 6911.76 6980.88
B CONCRETE M.250 including the cost of necessary
formwork, compacting with vibrator, curing & shuttering
in true line and level etc. but excluding cost of
reinforcement in RCC work for BEAM AND LINTEL for
any type of cross sectional area... etc., complete from
floor Two level to Three level as directed by E.I.C.
17 Providing & laying CONTROLLED CEMENT 51.30 Cu.m 6953.12 7022.65
C CONCRETE M.250 including the cost of necessary
formwork, compacting with vibrator, curing & shuttering
in true line and level etc. but excluding cost of
reinforcement in RCC work for BEAM AND LINTEL for
any type of cross sectional area... etc., complete from
floor Three level to Four level as directed by E.I.C.
17 Providing & laying CONTROLLED CEMENT 51.30 Cu.m 6994.48 7064.42
D CONCRETE M.250 including the cost of necessary
formwork, compacting with vibrator, curing & shuttering
in true line and level etc. but excluding cost of
reinforcement in RCC work for BEAM AND LINTEL for
any type of cross sectional area... etc., complete from
floor Four level to Five level as directed by E.I.C.
17 Providing & laying CONTROLLED CEMENT 4.00 Cu.m 7035.84 7106.20
E CONCRETE M.250 including the cost of necessary
formwork, compacting with vibrator, curing & shuttering
in true line and level etc. but excluding cost of
reinforcement in RCC work for BEAM AND LINTEL for
any type of cross sectional area... etc., complete from
floor Five level to Six level as directed by E.I.C.
It. Quantity Rate Amount
Item Description Unit 1% L.C.
No Total (Rs.) (Rs.)
18 Providing & laying CONTROLLED CEMENT 4.60 Cu.m 5296.45 5349.41
A CONCRETE M.250 including the cost of necessary
formwork, compacting with vibrator, curing & shuttering
in true line and level etc. but excluding cost of
reinforcement in RCC work for SILL for any type of
cross sectional area... etc., complete above Plinth level
to floor Two level as directed by E.I.C.
18 Providing & laying CONTROLLED CEMENT 6.70 Cu.m 5337.81 5391.19
B CONCRETE M.250 including the cost of necessary
formwork, compacting with vibrator, curing & shuttering
in true line and level etc. but excluding cost of
reinforcement in RCC work for SILL for any type of
cross sectional area... etc., complete from floor Two
level to Three level as directed by E.I.C.
18 Providing & laying CONTROLLED CEMENT 6.70 Cu.m 5379.17 5432.96
C CONCRETE M.250 including the cost of necessary
formwork, compacting with vibrator, curing & shuttering
in true line and level etc. but excluding cost of
reinforcement in RCC work for SILL for any type of
cross sectional area... etc., complete from floor Three
level to Four level as directed by E.I.C.
18 Providing & laying CONTROLLED CEMENT 6.70 Cu.m 5420.53 5474.74
D CONCRETE M.250 including the cost of necessary
formwork, compacting with vibrator, curing & shuttering
in true line and level etc. but excluding cost of
reinforcement in RCC work for SILL for any type of
cross sectional area... etc., complete from floor Four
level to Five level as directed by E.I.C.
18 Providing & laying CONTROLLED CEMENT 3.45 Cu.m 5461.89 5516.51
E CONCRETE M.250 including the cost of necessary
formwork, compacting with vibrator, curing & shuttering
in true line and level etc. but excluding cost of
reinforcement in RCC work for SILL for any type of
cross sectional area... etc., complete from floor Five
level to Six level as directed by E.I.C.
18 Providing & laying CONTROLLED CEMENT 0.50 Cu.m 5503.25 5558.28
F CONCRETE M.250 including the cost of necessary
formwork, compacting with vibrator, curing & shuttering
in true line and level etc. but excluding cost of
reinforcement in RCC work for SILL for any type of
cross sectional area... etc., complete from floor Six
level to Seven level as directed by E.I.C.
It. Quantity Rate Amount
Item Description Unit 1% L.C.
No Total (Rs.) (Rs.)
19 Providing & laying CONTROLLED CEMENT 66.30 Cu.m 6815.82 6883.98
A CONCRETE M.250 including the cost of necessary
formwork, compacting with vibrator, curing & shuttering
in true line and level etc. but excluding cost of
reinforcement in RCC work for SLAB AND CHHAJJA
for any thickness... etc., complete above Plinth level to
floor Two level as directed by E.I.C.
19 Providing & laying CONTROLLED CEMENT 68.90 Cu.m 6857.18 6925.75
B CONCRETE M.250 including the cost of necessary
formwork, compacting with vibrator, curing & shuttering
in true line and level etc. but excluding cost of
reinforcement in RCC work for SLAB AND CHHAJJA
for any thickness... etc., complete from floor Two level
to Three level as directed by E.I.C.
19 Providing & laying CONTROLLED CEMENT 68.90 Cu.m 6898.54 6967.53
C CONCRETE M.250 including the cost of necessary
formwork, compacting with vibrator, curing & shuttering
in true line and level etc. but excluding cost of
reinforcement in RCC work for SLAB AND CHHAJJA
for any thickness... etc., complete from floor Three
level to Four level as directed by E.I.C.
19 Providing & laying CONTROLLED CEMENT 68.90 Cu.m 6939.90 7009.30
D CONCRETE M.250 including the cost of necessary
formwork, compacting with vibrator, curing & shuttering
in true line and level etc. but excluding cost of
reinforcement in RCC work for SLAB AND CHHAJJA
for any thickness... etc., complete from floor Four level
to Five level as directed by E.I.C.
19 Providing & laying CONTROLLED CEMENT 4.00 Cu.m 6981.26 7051.07
E CONCRETE M.250 including the cost of necessary
formwork, compacting with vibrator, curing & shuttering
in true line and level etc. but excluding cost of
reinforcement in RCC work for SLAB AND CHHAJJA
for any thickness... etc., complete from floor Five level
to Six level as directed by E.I.C.
20 Providing & laying CONTROLLED CEMENT 2.45 Cu.m 7517.12 7592.29
A CONCRETE M.250 including the cost of necessary
formwork, compacting with vibrator, curing & shuttering
in true line and level etc. but excluding cost of
reinforcement in RCC work for STAIRCASE for any
thickness... etc., complete above Plinth level to floor
Two level as directed by E.I.C.
It. Quantity Rate Amount
Item Description Unit 1% L.C.
No Total (Rs.) (Rs.)
20 Providing & laying CONTROLLED CEMENT 2.45 Cu.m 7558.48 7634.06
B CONCRETE M.250 including the cost of necessary
formwork, compacting with vibrator, curing & shuttering
in true line and level etc. but excluding cost of
reinforcement in RCC work for STAIRCASE for any
thickness... etc., complete from floor Two level to
Three level as directed by E.I.C.
20 Providing & laying CONTROLLED CEMENT 2.45 Cu.m 7599.84 7675.84
C CONCRETE M.250 including the cost of necessary
formwork, compacting with vibrator, curing & shuttering
in true line and level etc. but excluding cost of
reinforcement in RCC work for STAIRCASE for any
thickness... etc., complete from floor Three level to
Four level as directed by E.I.C.
20 Providing & laying CONTROLLED CEMENT 2.45 Cu.m 7641.20 7717.61
D CONCRETE M.250 including the cost of necessary
formwork, compacting with vibrator, curing & shuttering
in true line and level etc. but excluding cost of
reinforcement in RCC work for STAIRCASE for any
thickness... etc., complete from floor Four level to Five
level as directed by E.I.C.
21 P/L I.S. mark T.M.T. FE 500 / 500D bar reinforcement 86176.00 Kg. 76.52 77.29
A for R.C.C. work including cutting, bending, binding with
binding wire and placing in position above Plinth level
to floor Two level etc complete as directed by EIC and
as per detail drawings.
21 P/L I.S. mark T.M.T. FE 500/500D bar reinforcement 25272.75 Kg. 77.58 78.36
B for R.C.C. work including cutting, bending, binding with
binding wire and placing in position from floor Two level
to floor Three level etc complete as directed by EIC
and as per detail drawings.
21 P/L I.S. mark T.M.T. FE 500/500D bar reinforcement 25272.75 Kg. 78.64 79.43
C for R.C.C. work including cutting, bending, binding with
binding wire and placing in position from floor Three
level to four Three level etc complete as directed by
EIC and as per detail drawings.
It. Quantity Rate Amount
Item Description Unit 1% L.C.
No Total (Rs.) (Rs.)
21 P/L I.S. mark T.M.T. FE 500/500D bar reinforcement 25272.75 Kg. 79.70 80.50
D for R.C.C. work including cutting, bending, binding with
binding wire and placing in position from floor Four
level to floor Five level etc complete as directed by EIC
and as per detail drawings.
21 P/L I.S. mark T.M.T. FE 500/500D bar reinforcement 3450.90 Kg. 80.76 81.57
E for R.C.C. work including cutting, bending, binding with
binding wire and placing in position from floor Five level
to floor Six level etc complete as directed by EIC and
as per detail drawings.
21 P/L I.S. mark T.M.T. FE 500/500D bar reinforcement 110.05 Kg. 81.82 82.64
F for R.C.C. work including cutting, bending, binding with
binding wire and placing in position from floor Six level
to floor Seven level etc complete as directed by EIC
and as per detail drawings.
22 Fixing the new reinforcement having 8 / 10 mm dia. 2466.00 No.s 145.00 146.45
with existing concreting with REBARING including
boring holes of appropriate dia. and a depth of 150mm
in concrete, cleaning the holes, fitting the reinforcement
in possition and fill up FISCHER chemical in the
remainng gap in proper manner etc. complete as
directed by EIC. (Reinforcement will be paid
23 Fixing the new reinforcement having 12mm dia. with 1348.00 No.s 174.00 175.74
existing concreting with REBARING including boring
holes of appropriate dia. and a depth of 150mm in
concrete, cleaning the holes, fitting the reinforcement in
possition and fill up FISCHER chemical in the
remainng gap in proper manner etc. complete as
directed by EIC. (Reinforcement will be paid
24 Providing and lyaing BRICK WORK using common 70.40 Cu.m 4530.27 4575.57
A burnt clay building conventional brick having crushing
strength not less than 35 Kg/Sq.cm. above Plinth level
to floor Two level in cement mortar 1:6 (1 cement :
fine sand) in true line and level including curing,
scaffolding, rackingout the joints... etc. complete as
directed by E.I.C.
It. Quantity Rate Amount
Item Description Unit 1% L.C.
No Total (Rs.) (Rs.)
24 Providing and lyaing BRICK WORK using common 80.90 Cu.m 4572.62 4618.35
B burnt clay building conventional brick having crushing
strength not less than 35 Kg/Sq.cm. from floor Two
level to floor Three level in cement mortar 1:6 (1
cement : 6 fine sand) in true line and level including
curing, scaffolding, rackingout the joints... etc.
complete as directed by E.I.C.
24 Providing and lyaing BRICK WORK using common 80.60 Cu.m 4614.97 4661.12
C burnt clay building conventional brick having crushing
strength not less than 35 Kg/Sq.cm. from floor Three
level to floor Four level in cement mortar 1:6 (1 cement
: 6 fine sand) in true line and level including curing,
scaffolding, rackingout the joints... etc. complete as
directed by E.I.C.
24 Providing and lyaing BRICK WORK using common 80.60 Cu.m 4657.32 4703.89
D burnt clay building conventional brick having crushing
strength not less than 35 Kg/Sq.cm. from floor Four
level to floor Five level in cement mortar 1:6 (1 cement
: 6 fine sand) in true line and level including curing,
scaffolding, rackingout the joints... etc. complete as
directed by E.I.C.
24 Providing and lyaing BRICK WORK using common 35.40 Cu.m 4699.67 4746.67
E burnt clay building conventional brick having crushing
strength not less than 35 Kg/Sq.cm. from floor Five
level to floor Six level in cement mortar 1:6 (1 cement :
6 fine sand) in true line and level including curing,
scaffolding, rackingout the joints... etc. complete as
directed by E.I.C.
It. Quantity Rate Amount
Item Description Unit 1% L.C.
No Total (Rs.) (Rs.)
24 Providing and lyaing BRICK WORK using common 1.80 Cu.m 4742.02 4789.44
F burnt clay building conventional brick having crushing
strength not less than 35 Kg/Sq.cm. from floor Six level
to floor Seven level in cement mortar 1:6 (1 cement :
fine sand) in true line and level including curing,
scaffolding, rackingout the joints... etc. complete as
directed by E.I.C.
25 Providing and lyaing HALF BRICK WORK using 98.35 Sq.m 691.02 697.93
A common burnt clay building conventional brick having
crushing strength not less than 35 Kg/Sq.cm. above
Plinth level to floor Two level in cement mortar 1:4 (1
cement : 4 fine sand) in true line and level including
curing, scaffolding, rackingout the joints... etc.
complete as directed by E.I.C.
25 Providing and lyaing HALF BRICK WORK using 213.10 Sq.m 697.36 704.33
B common burnt clay building conventional brick having
crushing strength not less than 35 Kg/Sq.cm. from floor
Two level to floor Three level in cement mortar 1:4 (1
cement : 4 fine sand) in true line and level including
curing, scaffolding, rackingout the joints... etc.
complete as directed by E.I.C.
25 Providing and lyaing HALF BRICK WORK using 213.10 Sq.m 703.70 710.74
C common burnt clay building conventional brick having
crushing strength not less than 35 Kg/Sq.cm. from floor
Three level to floor Four level in cement mortar 1:4 (1
cement : 4 fine sand) in true line and level including
curing, scaffolding, rackingout the joints... etc.
complete as directed by E.I.C.
It. Quantity Rate Amount
Item Description Unit 1% L.C.
No Total (Rs.) (Rs.)
25 Providing and lyaing HALF BRICK WORK using 227.05 Sq.m 710.04 717.14
D common burnt clay building conventional brick having
crushing strength not less than 35 Kg/Sq.cm. from floor
Four level to floor Five level in cement mortar 1:4 (1
cement : 4 fine sand) in true line and level including
curing, scaffolding, rackingout the joints... etc.
complete as directed by E.I.C.
26 Providing 20mm thick double coat MALA CEMENT 4176.00 Sq.m 316.33 319.49
PLASTER on interior brick / concrete work for
plastering on walls at all floor level comparising of base
coat of 12mm thick cement plaster in CM 1:4 (1
cement: 4 coarse sand) in rough finishing and 8mm
thick top coat of CM 1:2 (1 cement: 2 coarse sand)
finished with trovel including scaffolding, curing and
providing & fixing 150mm wide strip of chicken net at
vertical and horizontal joints of RCC and masonary...
etc., complete as directed by E.I.C.
27 INTERNAL PLASTER: 8.80 Sq.m 295.96 298.92
A Providing & applying 15mm THICK CEMENT
PLASTER in single coat on fair side of brick or
concrete wall for interior / exterior plastering from floor
Two level to floor Three level finished even and smooth
in CM 1:4 (1 Cement : 4 Sand) including finishing with
floating coat of neat cement slurry including necessary
curing, scaffolding in true line and level including
providing & fixing 100mm to 150mm wide strip of
chicken net at vertical and horizontal joints of RCC and
masonary... etc., complete as directed by E.I.C.
27 INTERNAL PLASTER: 157.50 Sq.m 385.72 389.58
B Providing & applying 15mm THICK CEMENT
PLASTER in single coat on fair side of brick or
concrete wall for interior / exterior plastering from floor
Five level to floor Six level finished even and smooth in
CM 1:4 (1 Cement : 4 Sand) including finishing with
floating coat of neat cement slurry including necessary
curing, scaffolding in true line and level including
providing & fixing 100mm to 150mm wide strip of
chicken net at vertical and horizontal joints of RCC and
masonary... etc., complete as directed by E.I.C.
It. Quantity Rate Amount
Item Description Unit 1% L.C.
No Total (Rs.) (Rs.)
27 INTERNAL PLASTER: 11.85 Sq.m 415.64 419.80
C Providing & applying 15mm THICK CEMENT
PLASTER in single coat on fair side of brick or
concrete wall for interior / exterior plastering from floor
Six level to floor Seven level finished even and smooth
in CM 1:4 (1 Cement : 4 Sand) including finishing with
floating coat of neat cement slurry including necessary
curing, scaffolding in true line and level including
providing & fixing 100mm to 150mm wide strip of
chicken net at vertical and horizontal joints of RCC and
masonary... etc., complete as directed by E.I.C.
28 Providing 20mm thick double coat MALA CEMENT 1979.55 Sq.m 287.84 290.72
PLASTER on interior brick / concrete work for
plastering on ceiling surfaces at all floor level
comparising of base coat of 12mm thick cement plaster
in CM 1:4 (1 cement: 4 coarse sand) in rough finishing
and 8mm thick top coat of CM 1:2 (1 cement: 2 coarse
sand) finished with trovel including scaffolding, curing...
etc., complete as directed by E.I.C.
29 Providing & applying 20mm THICK SAND FACED 1723.05 Sq.m 401.47 405.48
CEMENT PLASTER using wooden Gutki on wall upto
all height from ground level consisting of 12mm thick
backing coat of CM 1:3 (1 cement : 3 sand) and 8mm
thick finishing coat of CM 1:1 (1 cement : 1 sand)
including curing, necessary scaffolding in true line and
level including providing & fixing 100mm to 150mm
wide strip of chicken net at vertical and horizontal joints
of RCC and masonary… etc., complete as directed by
30 Providing and laying cement VATA (10cm x 10cm size) 348.05 Ru.m 24.04 24.28
quarter round in cement mortar 1:1 including neat
cement finishing, watering etc.. compete as directed by
31 Providing THROATING or plaster drip and moulding to 546.00 Ru.m 44.88 45.33
r.c.c. chajja's and plaster works in true line and level as
per detailed drawing and directed by E.I.C.
32 Providing, laying and fixing 8/10mm thick VITRIFIED 1360.20 Sq.m 1112.39 1123.51
TILES (600mm x 600mm) flooring (Vermora, Johnson,
Somany, Cera, Simpolo make) over 20mm (average)
base of Cement Mortar 1:6 (1 Cement, 6 coarse sand)
on new surface or fixing on existing flooring by
adhesive materials incluidng dismentalling of exiting
flooring and jointed with flush pointing & cleaning the
surface etc. complete.
It. Quantity Rate Amount
Item Description Unit 1% L.C.
No Total (Rs.) (Rs.)
33 Providing and laying 25mm thick GREEN POLISHED 89.75 Sq.m 1009.30 1019.39
KOTAH STONE slab having size (600mmx600mm)
Flooring over 20mm (average) thick base of cement
mortar 1:6 (1 cement : 6 course sand) laid over and
jointed with grey cement slurry including rubbing,
curing and polishing etc.. complete as directed by
34 Providing and laying 18mm thick POLISHED 136.75 Sq.m 2401.31 2425.32
GRANITE STONE slab Flooring of steps over 20mm
(average) thick base of cement mortar 1:6 (1 cement :
6 course sand) laid over and jointed with coloured
cement slurry including rubbing, curing, polishing and
half round moulding etc.. complete as per drawing and
as directed by E.I.C.
35 Providing, laying & fixing 6mm thick CERAMIC TILES 195.90 Sq.m 1007.23 1017.30
in flooring (Kajariya, Somany, Johnson, Cera, Simpolo
make) over 12mm (average) thick base of cement
mortar 1:3 (1 cement : 3 course sand) laid over and
finished with flush pointing in white cement slurry with
pigment to match the shade and colour of the tiles in
true line and level, curing... etc., complete as per
detailed drawing and directed by E.I.C.
36 Providing and laying CEMENT CONCRETE 66.75 Sq.m 296.30 299.26
FLOORING 1:2:4 (1-cement : 2-coarse sand : 4-
graded stone aggregate 20mm nominal size) laid in
one layer and finished with a floating coat of neat
cement. (A) 40mm thick.
37 Providing, laying and fixing 8/10mm thick VITRIFIED 119.45 Sq.m 1183.19 1195.02
TILES (600mm x 605mm) in skirting (Vermora,
Johnson, Somany, Cera, Simpolo make) over 10mm
(average) base of Cement Mortar 1:3 (1 Cement,
coarse sand) on new surface or fixing on existing
skerting by adhesive materials incluidng dismentalling
of exiting skerting and jointed with flush pointing &
cleaning the surface etc. complete.
38 Providing and laying 25mm thick GREEN POLISHED 4.05 Sq.m 1161.48 1173.09
KOTAH STONE slab having size (600mmx600mm) in
riser of steps, skirting, Dado laid over the base of
10mm th. of C.M. 1:3 (1 cement : 3 course sand) and
jointed with grey cement slurry including rubbing,
curing and polishing etc.. complete as per drawing and
as directed by E.I.C.
It. Quantity Rate Amount
Item Description Unit 1% L.C.
No Total (Rs.) (Rs.)
39 Providing and laying 18mm thick POLISHED 40.85 Sq.m 2310.63 2333.74
GRANITE STONE slab in riser of steps, skerting, Dado
laid over the base of 10mm th. of C.M. 1:3 (1 cement :
3 course sand) and jointed with coloured cement slurry
including rubbing, curing and polishing etc.. complete
as per drawing and as directed by E.I.C.
40 Providing and laying coloured glazed tiles of the size 999.75 Sq.m 1533.97 1549.31
in skirting, risers of steps and dedo on 10 mm. thick
cement plaster 1:3 (1 cement : 3 coarse sand) &
jointed with white cement slurry
41 Providing and fixing 25mm thick double polished 189.50 Sq.m 703.63 710.67
GREEN KOTAH STONE PARTITION for Cupboards /
Store racks including making gissi in brick wall and
filling gap with cement slurry and cement mortar
including half round moulding at visible edge etc.
complete in true line and level as per detailed drawing
and as directed by E.I.C.
42 Providing and laying PLATFORM for Kitchen / Pantry 7.95 Sq.m 4465.07 4509.72
made up from machine cut single side polished 18mm
thick Granite stone sandwhich type at top & at
horizontal facia and double side polished 40mm thick
Kotah stone at vertical support including making gissi
in brick wall, half round moulding, filling gap with
cement putty and cement mortar etc., complete, in true
line and level as per detailed drawing and directed by
43 Providing & fixing 18mm thick GRANITE STONE 600.35 Sq.m 2431.41 2455.72
single or sandwhich type at door / window sill, jams,
sofit, Urinal partition etc. fixing with CM 1:2 (1 cement:
2 coarse sand), including base plaster, Araldite and
screws if necessary including mirror polishing and
making quarter round moulding on both the sides,
making gissi in wall / RCC for resting and finishing with
colour cement etc. complete as directed by E.I.C.
(Measurement shall be done as per each & every
stone used with its length & width)
It. Quantity Rate Amount
Item Description Unit 1% L.C.
No Total (Rs.) (Rs.)
44 Providing and fixing 35mm thick Both Side Laminated 197.00 Sq.m 3598.03 3634.01
Water Proof FLUSH DOOR shutters of (As per make
list) including first class hardwood and cross band,
block board core with plywood face panels, 6mm thick
batten patti all around the shutter including 1mm thk.
laminate on both the side including S.S. ASIS
grade fixtures (As per make list) (1) S.S. Hinges
4x1"x1" - 4 no.s, (2) S.S. Stopper 20 Cm long - 1 no.s,
(3) S.S. Handle for Door 15 Cm size - 2 no.s, (4) S.S.
Aldrop 25 Cm long - 2 no.s with necessary screws
including providing and applying primer coat and two
coats of oil painting of (As per make list) to edges of
flush door shutter etc. complete as per detail drawings
and as directed by E.I.C.
45 Providing and fixing 28mm thick water proof WPC 83.50 Sq.m 3767.00 3804.67
SOLID PVC DOOR (plain digital printed) shutters
(single/double) having density of 0.55 to 0.70 kg/cu.m
molded sheet and must have composite section of
solid PVC of Akshar deep / Rajshri / as per make list
including S.S. ASIS 304 grade fixtures (As per make
list) (1) S.S. Hinges 4x1"x1" - 4 no.s, (2) S.S. Handle
for Door 15 Cm size - 2 no.s, (3) S.S. Aldrop 25 Cm
long - 2 no.s with necessary screws etc. complete as
per detail drawings and as directed by E.I.C.
46 Providing and fixing in possition COLLEPSIBLE 12.00 Sq.m 6370.65 6434.36
STEEL SHUTTERS with vertical chennals 20x10x2
mm braced with vertical chennals 20x5 mm size with
top and bottom rails of T-iron 40x40x6 mm with 38mm
dis steel pulleps complete with beist, nuts, locking
arragement, stoppers, handles including applying ready
mixed red lead priming coat and painting two coats of
enamel paint of (As per make list) etc., complete as per
detailed drawing and directed by E.I.C.
47 Providing, fabricating and fixing in walls / in kotah stone 230.40 Sq.m 2129.03 2150.32
frame M.S. C.R.C. Japan sheet of 16 gauge frame
inside inserted as per requirement on wall, floor,
ceilling all round and 18 gauge SHUTTER for
CUPBOARD as per drawing and design with chromium
plated fixtures & fastenings, locking arrangement
including applying red oxide priming coat and painting
coats of enamel paint of approved shade etc..
complete as directed by E.I.C.
It. Quantity Rate Amount
Item Description Unit 1% L.C.
No Total (Rs.) (Rs.)
48 Providing and fixing THREE TRACK SLIDING 158.55 Sq.m 1786.70 1804.57
WINDOW (2 shutters of Glass & 1 shutter of mosquito
net zali) having extruded aluminum Colour anodized
section frame main outer size 95mm x 24mm x
1.17mm @ wt.of 0.738 Kg/mt , horizontal Three track
member size 92mm x 31.75mm x 1.30mm,@ Wt.1.07
Kg/mt , vertical member of size 92mm x 31.75mm x
1.50mm @ Wt. 1.06 Kg/mt with sliding shutters of
horizontal member size 40 mmx18mm x1.29mm @
wt.of 0.456 Kg/mt, vertical member of size 40mm x
18mm x 1.29 mm @ wt.of 0.456Kg/mt/ with 5 mm thick
transparent bronze colour tinted float glass and SS 304-
15 mesh x27 gauge Mosquito net fixing with C channel
(3/4) (Alluminium) with powder coated aluminum fittings
and fixtures and transparent silicon sealant glass fixing
to frame as per details etc.
49 Providing and fixing standared extruded of alluminium 24.35 Sq.m 1163.92 1175.56
section of size 63mm x 38.10mm x 1.2mm @ Wt.
0.643 Kg/mt with colour anodized alluminium frame for
ventilation with 5 mm thick frosted glass as details etc
complete for Ventilation
50 Providing and fixing standared extruded of alluminium 24.35 Sq.m 1701.00 1718.01
section of size 63.50 x 38.10 x 1.95 mm,@ Wt 1.094Kg
/ Rmt with colour anodized alluminium frame with SS
304-15 mesh x27 gauge Mosquito net fixing with C
channel (3/4) (Alluminium) as details etc complete for
Fix Mosquito net jali.
51 Providing and fixing M.S. GRILL of required pattern at 3669.60 Kg. 125.23 126.48
balcony, in window frames, in RCC, in Masonry etc.
with M.S. flats at required spacing and frame all
around, square or round bars with round headed bolts
by nuts / screws at all heights including welding,
grinding, fixing in position, applying ready mixed red
lead priming coat and painting two coats of enamel
paint of (As per make list) etc., complete as per
detailed drawing and directed by E.I.C.
It. Quantity Rate Amount
Item Description Unit 1% L.C.
No Total (Rs.) (Rs.)
52 Providing, making and fixing STEEL WORK Welded in 5514.50 Kg 133.79 135.13
build up sections (ISA, C, T, I, Rectangular / circular
pipe, Bar, flats, plates etc.) in trusses and trussed
purlins including principal tie, rafters, struts & slings
members connected with Gusset plats, base plate,
bearing plate, cleat angles and the like and in railling /
openable gate with locking arrangement including
cutting, hoisting, fixing in possition, applying ready
mixed red lead priming coat and painting two coats of
Enamel paint of (As per make list) in true line and lvl.
as per detailed drawing etc. completed as directed by
53 Providing and fixing S.S. (16 Guage ASIS 304 grade) 39.65 Ru.m 4025.10 4065.35
PIPE RELLING of 0.90m height as pattern shown in
drawings at STAIRCASE with anchoring 0.075m in
RCC or masonry including 50mm dia. SS pipe as hand
rail, 32x32mm SS pipe as vertical support and 3 No.s -
16mm dia. SS pipe as intermediate horizontal member
including welding, grinding, fixing in position with
necessary fixtures and fastenings (25mm bracket,
base SS cap 50mm dia. hole, base SS cap 32x32mm
hole, SS pipe cap 16mm hole & 16mm long) and
polishing etc. complete as per detailed drawings &
directed by E.I.C.
54 Providing & Applying (two coats) of acrylic LAPY 4176.00 Sq.m 124.69 125.94
(PUTTY) and two coats of primer of approved brand
and manufacture and two coats of PLASTIC
EMULSION PAINT (5 years warranty) on internal wall
surafce of required shade approved by enginner
incharge and to give an even shade including
thoroughly brushing the suraface to remove all dirts,
dust & remains of loose powedered materials & mortar
durt and sand papered smooth including necessary
scaffolding, etc.. complete as directed by E.I.C. As per
make list. (The contractor must provide the colour
warranty certificate issued by the company authority)
55 Providing & Applying (two coats) of acrylic LAPY 1979.55 Sq.m 130.45 131.75
(PUTTY) and two coats of primer of approved brand
and manufacture and two coats of PLASTIC
EMULSION PAINT (5 years warranty) on internal
ceiling surafce of required shade approved by enginner
incharge and to give an even shade including
thoroughly brushing the suraface to remove all dirts,
dust & remains of loose powedered materials & mortar
durt and sand papered smooth including necessary
scaffolding, etc.. complete as directed by E.I.C. As per
make list. (The contractor must provide the colour
warranty certificate issued by the company authority)
It. Quantity Rate Amount
Item Description Unit 1% L.C.
No Total (Rs.) (Rs.)
56 Providing, applying and finishing wall with two coats of 2746.70 Sq.m 120.93 122.14
weather proof exterior emulsion paint (as per make
list) (5 years warranty) on exteranal wall surface of
required shade approved by engineer incharge and to
give an even shade one (base) coat of primer including
thoroughly brushing & brooming the suraface to
remove all dirts, dust & remains of loose powedered
materials & mortar durt including necessary
scaffolding, curing etc.. complete as directed by E.I.C.
(The contractor must provide the colour warranty
certificate issued by the company authority)
57 Providing and laying broken china mosaic flooring 462.95 Sq.m 771.98 779.70
for terrace using 12 mm to 20 mm broken pieces of
glazed tiles to be laid over cement mortar 1:3 to plain
or slope and to be tempered to bring mortar creme out
upto surface using white cement including rounding off
junctions and extending them upto 15 cm along the
wall,clearing with water and oxalic acid etc. as directed.
58 Providing & applying CHEMICAL WATER PROOFING 284.70 Sq.m 370.20 373.90
treatment to the terrace including Surface cleaning
All surface shall be thoroughly cleaned with mechanical
means or wire brush to remove dust dirt & all loose
portion from the surface of terrace & parapet wall &
wash with water. Surface preparing: All cracks will be
opened in V-shape & sealed wirh Dr Fixit Crack X
Paste & any patch work will be repaired with polymer
modified mortar, providing and applying two coat of
Dr.Fixit pidifine 2K on entire inside area of sunk. Two
coat of Dr.fixit pidifine 2K(10 kg Powder + 5 lit Liquid)
shall be applied on ready surface in vertically &
horizontally direction which is brsh applied
waterproofing coating & provides excellent
impermeable coating & flexible enough to take care of
minor cracks in concrete & plaster & good adhesion
with cementitious surfaces etc. completed by EIC.
It. Quantity Rate Amount
Item Description Unit 1% L.C.
No Total (Rs.) (Rs.)
59 Providing & applying CHEMICAL WATER PROOFING 609.60 Sq.m 455.83 460.39
treatment to the terrace / sunk slab including cleaning
the surface, opening the creaks in " V " grooves
pattened and filling the same water proof cement
mortar 1:1 (1 cement: 1 sand ) including brick bats as
directed to have proper slope over a layer of C.M. 1:1
(1 cement: 1 sand) including finishing the top surface
with 15mm thick water proof cement plaster in C.M.
(1:3) (1 cement: 3 sand) and finishing with a floating
coat of neat cement slurry using chemical water
proofing compound as per manufactures specifications
and standard specifications as per indian Water
proofing or equivalent including curing its with specified
period as directed and thickness to very between
mm x 150 mm to have proper slope and gradient
including vata of 100 mm x 100 mm size on with drip
mould inside periphery of the parapet / beam in C.M.
1:1 (1 cement: 1 sand ) etc. completed by EIC.
60 Providing & Laying CINDER FILLING in Sunk slab 41.80 Cu.m 1160.00 1171.60
including compacting manually with rammer and
finishing true line & level at all floor level etc.. complete
as directed by E.I.C.
61 Providing and laying CEMENT CONCRETE 1:3:6 (1 4.95 Cu.m 3158.63 3190.22
cement : 3 coarse sand : 6 hand broken stone
aggregates 40 mm nominal size) and curing
consolidation with rammers complete excluding cost of
form work from floor Two level to floor Three level etc.,
complete as directed by E.I.C.
62 Providing and laying CEMENT CONCRETE 1:3:6 (1 4.95 Cu.m 3199.99 3231.99
cement : 3 coarse sand : 6 hand broken stone
aggregates 40 mm nominal size) and curing
consolidation with rammers complete excluding cost of
form work from floor Three level to floor Four level etc.,
complete as directed by E.I.C.
63 Providing and laying CEMENT CONCRETE 1:3:6 (1 4.95 Cu.m 3241.35 3273.76
cement : 3 coarse sand : 6 hand broken stone
aggregates 40 mm nominal size) and curing
consolidation with rammers complete excluding cost of
form work from floor Four level to floor Five level etc.,
complete as directed by E.I.C.
64 Extra for additional height of PROPPING AND 24.55 Sq.m 403.71 407.75
CENTRING where the height of propping and centering
exceedes 4.0m between supporting floor to ceiling
including temporory brick or stone pillors for supporting
as required for the height more than 4.0m etc.
completed as directed by EIC.
It. Quantity Rate Amount
Item Description Unit 1% L.C.
No Total (Rs.) (Rs.)
65 Extra for additional height of PROPPING AND 5.15 Sq.m 707.77 714.85
CENTRING where the height of propping and centering
exceedes 4.0m between supporting floor to ceiling
including temporory brick or stone pillors for supporting
as required for the height more than 5.0m etc.
completed as directed by EIC.
66 Providing University Logo and Letter's Of different 2.00 Sq.m 18000.00 18180.00
sizes Engraved on Black Granite Stone, Painted with
Gold Foil on it. Making a Plaque and Fixing it on the
structure, Price with Labour
67 Demolition of P.C.C. work including disposal of 23.80 Cu.m 648.47 654.95
unserviceable materials with all lead and lift etc.
compeleted as directed by EIC.
68 Demolition of R.C.C. work including stacking of 24.95 Cu.m 1125.93 1137.19
serviceable materials and disposal of unserviceable
materials with all lead and lift etc. compeleted as
directed by EIC.
69 Demolition of Brick Work in cement mortar including 69.75 Cu.m 585.82 591.68
stacking of serviceable materials and disposal of
unserviceable materials with all lead and lift etc.
compeleted as directed by EIC.
70 Box cutting the road surface to proper slope and 264.35 Cu.m 110.91 112.02
camber for making a base for road work including
removing the excavated stuff and depositing on the
road side slope as directed upto 50Mt.lead.
71 Construction of Granular sub base in required layer 125.85 Cu.m 1860.35 1878.95
providing coarse graded material satisfying MOST
specification of grading including spreading in uniform
layer with motor grader on prepared surface mixing by
mix in place method with rotavator at OMC and
excluding compacting with vibratory roller etc.,
complete as directed by E.I.C.
72 Rolling and consolidation using vibratory road roller 419.35 Sq.m 18.47 18.65
8-10 tonne capasity (including watering) to
GRANULAR SUB BASE (layer not exceeding 150mm
thickness) etc. complete as directed by E.I.C.
73 Providing & laying CONTROLLED CEMENT 165.85 Cu.m 4134.61 4175.96
CONCRETE M.200 including the cost of necessary
formwork, compacting with vibrator, curing & shuttering
in true line and level etc. but excluding cost of
reinforcement in RCC work for ROAD for any
thickness... etc., complete as directed by E.I.C.
It. Quantity Rate Amount
Item Description Unit 1% L.C.
No Total (Rs.) (Rs.)
74 Extra for finishing the plinth slab with VACCUM 906.45 Sq.m 150.80 152.31
DEWATERING SYSTEM popularly known as TREMIX
consisting of mechanical trowel, vaccum dewatering
equipment and finishing with mechanical floater to give
even finish and smooth surface including groove
cutting for road and filling grooves with bitumin sand
mixer etc., complete as directed by E.I.C.
75 Providing and fixing pre-cast Rubber Dye / steel Dye 101.95 Sq.m 700.54 707.55
inter locking CONCRETE BLOCK 60mm thick with
grade of concrete M300 pnumatic compressed /
vibrated mechanically and as per approved design
Confirming to IS 15658 : 2006 including 35 mm Sand
layer for levelling and filling the joint with sand in proper
line and level as per guidlines of IRC : SP 63-2018 etc.
complete as directed by EIC.
76 Providing and fixing pre-cast concrete kerb stone of 115.80 Ru.m 371.21 374.92
gray cement based concrete block 30cm length, 30cm
height and 15cm thick of M250 grade concret as per
approved design and including excavation for fixing in
proper line level, filling the joints with C:M 1:3
(1cement:3fine sand) etc complete.
77 Appliying priming coat over new wood and wood 91.35 Sq.m 137.51 138.89
based surface or cementisious surface of kerbing
stone after and including preparing the surface by
throughly cleaning oil, grease, dirt and other foreign
matter, sand papering and knotting. (C) Ready mixed
paint brushing priming for enamel and Painting two
coats on new wood and wood based surface or
cementisious surface of kerbing stone with enamel
paint, interior to give an even shade including cleaning
the surface of all dirt, dust and other foreign matter
sand papering and stopping etc complete as directed
by EIC. As per make list.
78 BORING HOLES 3.50m depth in ordinary soil (Cast in 34.00 No.s 1545.73 1561.19
situ pipes) and getting out the soil & desposal of the
surplus excavated soil as directed within a lead of 50m,
the diameter of pile is 300mm… etc., complete as
directed by E.I.C.
It. Quantity Rate Amount
Item Description Unit 1% L.C.
No Total (Rs.) (Rs.)
79 Providing & laying CONTROLLED CEMENT 8.45 Cu.m 4752.97 4800.50
CONCRETE M.250 including compacting with vibrator,
curing etc. but excluding cost of formwork and
reinforcement in RCC work for AUGUR for any type of
cross sectional area... etc., complete as directed by
TOTAL COST OF CIVIL WORK
Executive Engineer,
N.A.U., Navsari.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
SECTION- 01-04.pdf
SECTION-05 (01).pdf
SECTION-05 (02) volume I Building-Specification Book.pdf
SECTION-05 (03). schedule for Testing Material.pdf
SECTION-05 (04). Specifications for Electric works.pdf
SECTION-05 (05). volume II CIVIL.pdf
SECTION-05 (06)Specification index.pdf
SECTION-06.pdf
SECTION-07 (01).pdf
SECTION-07 (02). GENERAL SUMMERY.pdf
SECTION-07 (03). SCHEDULE-B CIVIL.pdf
SECTION-07 (04). SCHEDULE-B PLUMBING.pdf
SECTION-07 (05). SCHEDULE-B (ELECTRIC).pdf
SECTION-07 (06). SCHEDULE-B (FIRE).pdf
SECTION-08.pdf
SECTION-09 (01).pdf
SECTION-09 (02)GROUND FLOOR PLAN.pdf
SECTION-09 (03) FIRST FLOOR PLAN.pdf
SECTION-09 (04)SECOND and THIRD FLOOR PLAN.pdf
SECTION-09 (05)TERRACE FLOOR PLAN.pdf
SECTION-09 (06)ELECTRIC LAYOUT PLAN AT GROUND FLOOR.pdf
SECTION-09 (07)ELECTRIC LAYOUT PLAN AT FIRST FLOOR.pdf
SECTION-09 (08)ELECTRIC LAYOUT PLAN AT SECOND and THIRD FLOOR.pdf
SECTION-09 (09)ELECTRIC LAYOUT PLAN AT TERRACE FLOOR.pdf
SECTION-09 (10)NORTH and SOUTH ELEVATION.pdf
SECTION-09 (11)EAST and WEST ELEVATION.pdf
SECTION-09 (12)SECTION AA and SECTION BB.pdf
SECTION-09 (13)-FIRE LAYOUT GROUND FLOOR PLAN.pdf
SECTION-09 (14)-FIRE LAYOUT FIRST FLOOR PLAN.pdf
SECTION-09 (15)-FIRE LAYOUT SECOND and THIRD FLOOR PLAN.pdf
SECTION-09 (16)-FIRE LAYOUT TERRACE.pdf
SECTION-09 (17)-FIRE SECTION.pdf
NIT-02 of 2026-27.pdf
Details of Tenderer or Bidders.pdf
General Terms and Conditions.pdf
Make List Civil Electric and Fire safety.pdf
ADDITIONAL TERMS and CONDITIONS FOR EXECUTION.pdf
List of Mandatory Documents.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .