| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹39.3 LAccepted-AOC LOWGANG SANTIR BAZAR SANTIRBAZAR SOUTH TRIPURA PIN 799144 | SOUTH TRIPURA | TRIPURA | 799144 | ₹39.3 L | L1 | Accepted-AOC Awarded the work as lowest bidder has quoted his rate thirty six point one one percent below |
| 2 | L2₹39.9 L+₹61,447 (1.57%)Rejected-AOC JAIL ASHRAM RD WARD NO 25 AGT MC WEST TRIPURA | ₹39.9 L+₹61,447 (1.57%) | L2 | Rejected-AOC Not awarded due to higher rate compare to lowest bidder |
| 3 | L3₹41.0 L+₹1.7 L (4.35%)Rejected-AOC | ₹41.0 L+₹1.7 L (4.35%) | L3 | Rejected-AOC Not awarded due to higher rate compare to lowest bidder |
| 4 | L4₹41.4 L+₹2.2 L (5.51%)Rejected-AOC JAIL ROAD BELONIA SOUTH TRIPURA | ₹41.4 L+₹2.2 L (5.51%) | L4 | Rejected-AOC Not awarded due to higher rate compare to lowest bidder |
| 5 | L5₹42.7 L+₹3.5 L (8.80%)Rejected-AOC O O THE RAJNAGAR RD BLOCK SOUTH TRIPURA | GOMATI | TRIPURA | 799125 | ₹42.7 L+₹3.5 L (8.80%) | L5 | Rejected-AOC Not awarded due to higher rate compare to lowest bidder |
Tender Value
₹61.4 L
EMD Value
₹1.2 L
Closing Date
15 Jun 2026, 3:00 pmClosed
Executive Engineer
O/O. the Executive Engineer, PWD(RandB) Belonia Division, South Tripura
Earthwork, PCC, RCC, Brickwork, Plastering, Painting and other allied works.
2026_CEPWD_73460_1
05/NIT/SE-III/B/PWDRandB/26-27
Open Tender
Civil Works - Building
Percentage
180 days
Belonia Municipal Council area
Please refer Tender documents.
6 documents required · 6 mandatory
₹4,000
₹1.2 L
27 Jul 2026
5 Jun 2026
15 Jun 2026
5 Jun 2026
15 Jun 2026
5 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth, 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto
1.5m, disposed earth to be levelled and neatly dressed
-All kinds of soil | - | Cum | 179.9 | - |
| 2 | Supplying and filling in plinth, under floor, foundations etc. with sand (fine) from local quarry with all lifts including spreading in horizontal layers, watering, grading to required slope, ramming, consolidating and compacting each layer by using plate compactor or by any suitable method complete. | 1 | Cum | 1,177.3 | ₹1,176.12 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering
i) 1:3:6 ( 1 Cement: 3 fine sand: 6 graded stone aggregate 40 mm nominal size) | 1 | Cum | 10,249.1 | ₹10,238.85 |
| 4 | First class brick work in foundation and plinth including cost of all materials as required complete:-
1) In cement mortar 1:4 ( 1 cement: 4 fine sand). | 1 | Cum | 9,845.2 | ₹9,835.35 |
| 5 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centering, shuttering, finishing and reinforcement-
i) 1:1 ½:3 (1 Cement: 1 ½ fine sand 3 graded stone aggregate 20 mm nominal size) | - | Cum | 12,073.8 | - |
| 6 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and skirting courses, fillets, columns, pillars, piers, abutments, posts and struts etc. upto floor five level excluding cost of centering, shuttering, finishing and reinforcement-
1) 1:1 ½:3 (1 Cement: 1 ½ fine sand 3 graded stone aggregate 20 mm nominal size) | - | Cum | 13,305.8 | - |
| 7 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15 landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto floor five level excluding the cost of centering, shuttering, finishing and reinforcement-
a) 1:1½:3 (1 Cement: l½ fine sand 3 graded stone aggregate 20 mm nominal size) | - | Cum | 13,584.5 | - |
| 8 | Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.
a) Thermo-Mechanically Treated bars of grade Fe-500D or more | 1 | Kg | 103.9 | ₹103.8 |
| 9 | Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level.
i) Thermo-Mechanically Treated bars of grade Fe-500D or more | 1 | Kg | 103.9 | ₹103.8 |
| 10Centering shuttering including struttings, propping etc. and removal of form work for: | |||||
stage.html
html • 0.06 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_74757.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.31 MB
DNIeT05.pdf
Tender Documents • 2.49 MB
BOQ_74757.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .