President, PMKSY WDC -2.0 Samiti – Tarana,sampar,Madhapar,Jamsar Village: Meghpar, Jamsar, Ta. Jodiya,
Causeway Cum Checkdam Nos.-1, Chackdam-4,Protection Wall-2
284189
PMKSY WDC-2.0/Meghpar/Work/99/2025-26
Open
Miscellaneous Goods
Works
Jamnagar
5 documents required · 5 mandatory
₹1,500
Yes
“PROJECT DIRECTOR DWDU JAMNAGAR PROJECT FUND IWMP‐26" (Payable at Jamnagar)
₹26,626
Yes
9 Mar 2026
9 Mar 2026
9 Mar 2026
23 Mar 2026
9 Mar 2026
Name of Work: Causeway Cum Checkdam Nos.-1, Chackdam-4,Protection Wall-2
Downloading of tender documents
1 (Last Date and Time) Date. 23/3/2026, 16‐00 Hrs
Online submission of bid
(Last Date and Time)
Submission of EMD and tender fee
(Last Date and Time)
Technical Bid: Online verification of documents
(Date and Time)
5 Online opening of commercial bid (Date and Time) Date. 30/3/2026, 15‐00 Hrs
6 Estimated cost of work in RS. Rs.26,62,683/-
Demand draft of tender fee from any nationalised bank will be
7 in favour of “PROJECT DIRECTOR DWDU JAMNAGAR Rs.1500/-
PROJECT FUND IWMP‐26" (Payable at Jamnagar).
Demand draft /FDR E.M.D. from any nationalised bank will be in
8 favour of “PROJECT DIRECTOR DWDU JAMNAGAR PROJECT Rs.26,626/-
FUND IWMP‐26" (Payable at Jamnagar).
Tender Notice No: PMKSY WDC-2.0/Meghpar/Work/99/2025-26
Inviting Bids: District Level Office:
President, Project Director
PMKSY WDC -2.0 Samiti – Tarana,sampar,Madhapar,Jamsar District Watershed Development Unit
Village: Meghpar, Jamsar, Ta. Jodiya, Sardar Patel Bhavan,
District: Jamnagar Rameshwar Nagar, Jamnagar-361008.
Contact No: 9099052430 Telephone: 0288-2550525
email: [email protected]
Opening Authority: President PMKSY WDC -2.0 Samiti –Meghpar & Nodal Officer PIA – DWDU, Sardar Patel
Bhavan Near Rameshwar Nagar Jamnagar
President, PMKSY WDC‐2.0 Samiti – Meghpar, Jamnagar Signature Of Contractor
Important Details
Details of Committee
PMKSY WDC-2.0 (Meghpar Project) have been Sanctioned under New common Guideline-2021
and running under District Watershed Development unit, Jamnagar. In Meghpar, Jamsar Village, Village
Level committee has formed for implementation of this project. This committee has registered by charity
Commissionerate office, Jamnagar as a public trust and its registration no is F/1346-1347-1348-
1352/Jamnagar and also registered under Society act–1860, GUJ/1441-1442-1443-1447/Jamnagar
Dt.19/12/2022. This is called “PMKSY WDC‐2.0 Samiti‐ Meghpar, Shampar”.
Details of Reference:‐
Gujarat State Watershed Management Agency, Gandhinagar has instructed by letter No.
Z-11011/08/2008-PPC-PART(I) Date. 19/01/2022, President PMKSY WDC-2.0 Samiti – Meghpar, Jamsar
inviting tender documents from for implementation of various Civil & other work in Meghpar, Jamsar
village of PMKSY WDC-2.0 Samiti- Meghpar, Jamsar, Inviting Tender documents from Government
registered/approved contractor as prescribe terms and conditions given in tender document.
Mode of sending the tender:
To view tender notice, detailed time schedule, tender document for this tender and
subsequently purchase the tender document and its supporting documents, kindly visit following E-
tendering website of www.nprocure.com
The offer should be submitted online in the prescribed form as per TWO ENVELOPE
SYSTEM ONLY. Both the bids (Technical as well as Commercial) shall have to be submitted online and
documents for technical bid will also send by RPAD/Speed post only. Bids not submitted online will
not be entertained.
The offers of the bidders qualifying technically are only eligible for opening of envelope
no.2. Commercial bid (Envelope No.2) will be opened in the presence of bidder or their authorized
representative present at a date which will be notified as above.
President, PMKSY WDC‐2.0 Samiti – Meghpar, Jamnagar Signature Of Contractor
Details of security Deposit:‐
After opening of commercial bid, qualified bidder whose over all rates are lowest will
submit the security deposit within 7 days or the instruction given by the President, PMKSY WDC-2.0
Samiti – Meghpar, Jamsar (It is 10% of estimated cost and it is deposited in the form of
FDR (Nationalized Bank/ ICICI BANK/ HDFC BANK/ AXIS BANK) pledged in favour
of Project Director DWDU Jamnagar Project Fund IWMP‐26 Account.
Detail of Necessary Documents required for cover “A”:‐
(1) Government Registration Certificate of Approved Contractor (E2 and above)
(3) Demand Draft/FDR of E.M.D. (Exemption certificate of Authorize Department) & D.D. of tender fee
(Nationalized Bank/ICICI BANK/HDFC BANK/AXIS BANK) only.
(4) Income tax return three years. (A.Y. 2023-24, A.Y. 2024-25, A.Y. 2025-26)
(5) Experience Certificate of related works of Government department.
(6) Bank Account Detail passbook (Only Front Page) / Cheque.
(7) Self-Declaration Non-Blacklisted Firm on Notarized with Rs.300/- Stamp during BID date.
(8) Valid Recent Bank Solvency Certificate of Nationalized bank. (2.00 Lakhs and above)
(9) P.F. Number Certificate.
(10) G.S.T. Registration Certificate.
(11) Tender Form with Signature Copy of Contractor.
President, PMKSY WDC‐2.0 Samiti – Meghpar, Jamnagar Signature Of Contractor
President, PMKSY WDC‐2.0 Samiti – Meghpar, Jamnagar Signature Of Contractor
President, PMKSY WDC‐2.0 Samiti – Meghpar, Jamnagar Signature Of Contractor
President, PMKSY WDC‐2.0 Samiti – Meghpar, Jamnagar Signature Of Contractor
President, PMKSY WDC‐2.0 Samiti – Meghpar, Jamnagar Signature Of Contractor
President, PMKSY WDC‐2.0 Samiti – Meghpar, Jamnagar Signature Of Contractor
President, PMKSY WDC‐2.0 Samiti – Meghpar, Jamnagar Signature Of Contractor
President, PMKSY WDC‐2.0 Samiti – Meghpar, Jamnagar Signature Of Contractor
President, PMKSY WDC‐2.0 Samiti – Meghpar, Jamnagar Signature Of Contractor
President, PMKSY WDC‐2.0 Samiti – Meghpar, Jamnagar Signature Of Contractor
President, PMKSY WDC‐2.0 Samiti – Meghpar, Jamnagar Signature Of Contractor
President, PMKSY WDC‐2.0 Samiti – Meghpar, Jamnagar Signature Of Contractor
President, PMKSY WDC‐2.0 Samiti – Meghpar, Jamnagar Signature Of Contractor
President, PMKSY WDC‐2.0 Samiti – Meghpar, Jamnagar Signature Of Contractor
President, PMKSY WDC‐2.0 Samiti – Meghpar, Jamnagar Signature Of Contractor
1. V[S SZTF JW] SFDMGF\ S[;DF\ NZ[S SFD ;FY[ RF,] YFI T[J] VFIMHG .HFZNFZzLV[ UM9JJFG]\ ZC[X[P VF VFIMHG S[ UM9J6L DF8[ .HFZNFZzLG[
SM. DMAL,F.h[XG RFH" R]SJJFDF\ VFJX[ GCLP SM. 56 ;\HMUMDF\ V[J] H6FX[ S[ .HFZNFZzL SFDGF EFZ6G[ 5CM\RL XS[ T[D GYLP VF 5|;\U[
;lDlT £FZF SMg8=FS8ZGL XZTMG]\ 5F,G G YJF AN, T[DG]\ SFD ZN SZX[ VG[ ;LSIMZL8L 0L5MhL8 H%T SZFX[P VF SFD VgIG[ ;M\5TF H[ JWFZFGM
BR" YFI T[ SMg8=FS8Z 5F;[YL J;], SZJFGM ZC[X[P
2. SFDULZL 1FlTI]ST DF,]D 50[ VG[ HyYF S[ U]6JTFDF\ p65 VFJ[ T[JF VYJF VgI SM.56 ;\HMUMDF\ SFDULZLGF VFN[X ZN SZJFGL ;TF lH<<FF
H/:+FJ lJSF; ;lDlT TYF GF[0, VF[OL;ZzLGL ZC[X[P
3. SFDULZL NZdIFG BMNF6 T[DH Z:TF AGFJJF AFAT[ SM.56 HFTGF HFGDF,G[ S[ B[TZGF 5FSG[ G]SXFG YX[ T[GL HJFANFZL .HFZNFZGL
U6FX[P H[ DF8[ SM.56 5|SFZG]\ G]SXFGqJ/TZ H/:+FJ ;lDlT TYF GM0, VMOL;Z4 lH<<FF H/:+FJ lJSF; V[SD4 HFDGUZ NJFZF R]SJFX[
4. 8[g0Z AL0 s8[g0Z SJZf lGIT ;DI DIF"NFDF\ VMlO; ;ZGFD[ D?IF 5KL H V[Hg;L G[ 8[g0Z BM,JF DF8[ VFBZL DFgITF 5|F%T ZC[X[P
5. SFDULZLG]\ VFBZL AL, SFD ;\TMQFSFZS 5]6" YI[ R]SJJFDF\ VFJX[P SFDULZL DF8[ SM.56 5|SFZG]\ V[0JFg; R]SJFX[ GCLP
6. ,3]TD EFJJF/]\ 8[g0Z SFDGL V\NFHLT ZSDGF !5@ SZTF JW] GLR]\ CX[ sL1fVFJ[, 5F8L"zLV[ 8[g0Z 0MSI]D[g8GL ;FY[ ZH] SZ[, l;SIMlZ8L
0L5MhL8 p5ZF\T V[SZFZ GFDFDF\ NXF"J[, SF[Q8S D]HA ;LSIF[ZL8L 0L5F[hL8 ZH] SZJFGL ZC[X[P ZSD ! JQF" ;]WL ;lDlT 5F;[ HDF ZC[X[P T[
SFDULZL 5]6" SIF"YL ! JQF" ;]WLDF\ HM SM. GA/L SFDULZL DF,]D 50X[ TM T[ ZSDDF\YL ;NZC]\ SFDULZL ZL5[ZL\U SZFJJFDF\ VFJX[ T[DH
SFDULZLDF\ SM. ZL5[ZL\U SZJFG]\ G YT]\ CMI T[JF ;\HMUMDF\ Sd5,LXG ;8L"GF\ H[ TFZLB[ .:I] SIF"GF ! JQF" AFN 5ZT SZJFDF\ VFJX[P
7. ,3]TD EFJJF/]\ 8[g0Z SFDGL V\NFHLT ZSDGF !5@ SZTF JW] GLR]\ CX[ TM sL1fVFJ[, 5F8L"V[ 8[g0ZGF SFDMGF] Z[8 V[GF,L;L; SZL VF5JFG]\
8. sL1f V[Hg:FL D\H]Z YI[, EFJ[ SFD SZJF T{iFFZ GCL YFI TM H[vT[ V[Hg;LGL ;LSIMZL8L 0L5MhL8 H%T SZL lH<,F H/:+FJ lJSF; V[SD
C:TSGF TDFD 5|MH[S8MGL 8[g0Z 5|lS|IF DF8[ SF/L IFNLDF\ D]SJFDF\ VFJX[P H[YL V[Hg;L ElJQIDF\ lH<<FF H/:+FJ lJSF; V[SDGL 8[g0Z
5|lS|IFDF\ EFU ,. XSX[ GCL VG[ HM EFU ,[X[ TM T[ DFgI ZC[X[ GCLP tIFZAFN s L2f V[Hg;LG[ sL1f GF D\H]Z YI[, EFJ D]HA SFD SZJF
DF8[ 5|F[H[S8 0FIZ[S8ZzL4 lH<<FF H/:+FJ lJSF; V[SD4 HFDGUZ äFZF VFD\l+T SZJFGL ZC[X[P
9. 8[g0Z 5|lS|IF VgJI[ DF+ V[S H 8[g0Z D/[, CX[ TM H[vT[ 8[g0Z 5|lS|IF ZN SZJFDF\ VFJX[ TYF GJ[;ZYL OZLYL 8[g0ZL\U SZJFG]\ ZC[X[P
10. H[ .HFZNFZzLG]\ 8[g0Z D\H]Z YFI T[VMV[ H SFD SZJFG]\ ZC[X[P .HFZNFZzL SM.56 ;\HMUMDF\ 5[8F SMg8=FS8Z G[ SFD VF5L XSX[ GCLP HM 5[8F
SMg8=FS8 VF5JFDF\ VFJX[ TM T[G] D\H]Z YI[, 8[g0Z ZN SZJFDF\ VFJX[P SFDGF :Y/ 5Z .HFZNFZzLV[ 5MT[ VYJF 5MTFGF VlWS'T SZ[,
5|lTlGWL s>HG[Zf CFHZ ZCL XSX[P
11. ;ZSFZzL TZOYL VG]NFG p5,aW YI[YL SFDG]\ R]SJ6]\ SZJFDF\ VFJX[P VG]NFGGL DIF"NFDF\ H R]SJ6]\ SZJFDF\ VFJX[ VG[ VG]NFG DM0]\ D/[4
G D/[ T[JF lS:;FDF\ .HFZNFZ £FZF jIFHGL DF\U6L SZL XSFX[ GCLP
12. lJJFNGL AFATDF\ 5|F[H[S8 0FIZ[S8ZzL4 lH<,F H/:+FJ lJSF; V[SD4 HFDGUZ VG[ R[ZD[GzL,lH<,F H/:+FJ lJSF; V[SD4
HFDGUZvJvlH<,F lJSF; VlWSFZLzLGF[ lG6"I VFBZL U6FX[ TYF gIFI1F[+ HFDGUZ U6FX[P
13. .HG[Z wJFZF DFgI EFNZ VYJF EMUFJM Z[TL JF5ZJFGL ZC[X[P .HG[Z wJFZF VDFgI SZJFDF VFJ[, SM. 56 D8LZLI, ;F.8 5Z pTFZJFDF\
VFJX[ TM T[G[ .HG[ZGL CFHZLDF\ .HFZNFZ[ ;F.8 5ZYL :JvBR[" N]Z SZJFG]\ ZC[X[P S5RL4Z[TL4 5yYZ JU[Z[ DF, ;FDFGGL ZMI<8L
.HFZNFZzLV[ D[/JL ,. AL, ;FY[ ZH] SZJFGL ZC[X[P
14. ;F\3L ;LD[g84 SD/ ;LD[g84 V\A]HF ;LD[g84 V<8=F8[S ;LD[g8 v VF.PV[;PVF.P VMP5LP;LP 5# U|[0 ;LD[g8 JF5ZJFGL ZC[X[P
15. AF\WSFDGF DF,;FDFGGF SZJF5F+ 5ZL1F6F[ 5{SL (_@ 5ZL1F6F[ ;F.8 5Z4 !_@ 5ZL1F6F[ ;ZSFZ DFgI ,[AF[Z[8ZL VG[ !_@ 5ZL1F6F[ U[ZLq
;ZSFZL .HG[ZL SF[,[Hq ;ZSFZL 5F[l,8[SGLS SF[,[HDF\ SZJFGF\ ZC[X[P NZ[S DF,;FDFGG]\ VF[KFDF\ VF[K] V[S 5ZL1F6 U[ZL DF\ SZFJJFG]\ ZC[X[P
16. JS" VM0"Z D?IF AFN .HFZNFZzLV[ +6 lNJ;DF\ SFD X~ SZJFG]\ ZC[X[ VG[ JS" VM0"Z D?IFGF !5_ lNJ; ;]WLDF\ SFDULZL 5}]6" SZJFGF ZC[X[P
SFDULZL lGIT ;DI DIF"NFDF\ 5]6" G YFI TM V[Hg;L 5F;[YL 8[g0ZGL lS\DTGF V[S lNJ;GF _PZ@ ,[B[ ZSD N\0 TZLS[ J;], SZJFDF\ VFJX[P
p5ZMST ;DI DIF"NF 5KLGF !5 lNJ;DF\ 56 SFDULZL 5]6" GlC YJFGF lS:;FDF\ V[Hg;L 5F;[YL 8[g0Z lS\DTGF V[S lNJ;GF !@ ,[B[ ZSD
N\0 TZLS[ J;], SZJFDF\ VFJX[P
17. SMDG UF>0,F.G OMZ JM8ZX[04 VM5Z[XG, UF>0,F.G VG[ 8[SGLS, D[gI], D]HAGL ;]RGF TYF lGIDM A\WGSTF" ZC[X[P
18. 5[S[H 5{SLGF TDFD SFDM ;F.8 V[gHLGLIZGL ;]RGF T[DH 8[g0Z 0MSI]D[g8 D]HA 5]6" YIF AFN ;DU| 5[S[HG] \ V[S ;FY[ R]SJ6]\ SZJFDF\ VFJX[P
SFA] ACFZGF ;\HMUMDF SM.56 SFD :YULT SZJ]\ 50[ VYJF TM Y. G XS[ TM VG[ TM H 5[S[H 5{SLGF 5]6" YI[, SFDMG]\ R]SJ6]\ SZJFDF\ VFJX[P
VgIYF SM.56 ;\HMUMDF\ V\XTo R]SJ6]\ SZJFDF\ VFJX[ GCLP
President, PMKSY WDC‐2.0 Samiti – Meghpar, Jamnagar Signature Of Contractor
19. SZ[, SFDM V;FWFZ6 ;\HMUM H[JF S[ S]NZTL VFOTM4 JFJFhM0]4 VlT JZ;FN4 E]S\5 JU[Z[ ;LJFI4 GA/L U]6JTFG[ ,.G[ G]SXFG YFI TM SFD
5]6" YIFGF ! JQF" ;]WL DZFDTGL HJFANFZL .HFZNFZzLGL ZC[X[P
20. SFDULZLDF\ :Y/ l:YlT VG];FZ O[ZOFZ YJFGL XSITF CMI tIF\4 CJF,FGF .HG[ZzL4 JM8ZX[0 ;lDlT4 GM0, VMOL;Z TYF 5|MH[S8 0FIZ[S8ZGL
;]RGF D]HA SFDULZL SZJFGL ZC[X[P
21. XZTL 8[g0Z :JLSFZJFDF\ VFJX[ GCLP
22. SFD X~ SIF" 5C[,F4 RF,] SFDULZL NZdIFG T[DH 5]6" YI[, SFDGF TSTL ;FY[GF V[S H V[ \U,YL OM8MU|FOL SZJFGL ZC[X[P S,Z OF[8F[U|FO;GL
+6 GS, SZJFGL ZC[X[4 H[DF\ A[ GS, H/:+FJ lJSF; ;lDlTG[ VF5JFGL ZC[X[ VG[ V[S GS, AL, ;FY[ ZH] SZJFGL ZC[X[P H[DF\ JBTM JBTGL
OM8MU|FOL .HFZNFZzLV[ T[DGF BR"[ SZJFGL ZC[X[P
23. JCLJ8L4 S]NZTL4 VgI SFZ6M;Z SFDULZL VF5L G XSFI VYJF SFD G Y. XS[ T[JF ;\HMUMDF\ SM. lS:;FDF\ DXLGZL4 ;FWGM4 DH]ZM JU[Z[
VF.0, ZC[ T[JF lS:;FDF\ 56 SM. VF.0, RFH" R]SJJFDF\ VFJX[ GCLP
24. .HFZNFZzLV[ NZ[S 5|SFZGL DXLGZL DF8[ JLDM JU[Z[ SZFJL ,[JFGF\ ZC[X[P T[H ZLT[ VS:DFTGF\ ;\HMUMDF\ ;\5]6" HJFANFZL .HFZNFZzLGL
25. ;F.8 5Z SFD SZTF 0=F.JZ4 S,LGZ4 :SL, VG[ VG:SL<0 ZMHDNFZ4 DH]ZM4 RMSLNFZGF CFHZL5+S4 JLDFVM VG[ ,F.;g; JU[Z[ ;ZSFZzLGF
5|JT"DFG lGIDFG];FZ .HFZNFZzL V[ ,[JFGF ZC[X[P
26. EZ[,F EFJM TDFD 8[1F ;lCTGF ZC[X[ tYF ;ZSFZzLGF 5|JT"DFG GSTGF WFZFWMZ6MG[ wIFG[ ,. EFJ EZJFGF ZC[X[P
27. AL,GL ZSDDF\YL S5FT5F+ AGTL CX[4 T[ TDS, GST TYF ,[AZ ;[;GL ZSD AL,DF\YL S5FT SZJFDF\ VFJX[P H~Z H6FI TM l;SIMZL8L
0L5MhL8DF\YL 56 S5FT SZJFDF\ VFJX[P
28. SFD 5]6" YIF AFNGF DF5 SMg8=FS8Z[ .HG[ZzL TYF ;lDlTGF 5|D]B ;FY[ ZCL ,[JFGF\ ZC[X[P .HG[ZzL NJFZF ,[JFDF\ VFJ[, DF5M DFgI ZC[X[P
29. J5ZFI[, DF, ;FDFGGF BZLNLGF AL,M ;LD[g8 AL,4 ,F[B \0 AL,4 HLV[;8L ;FY[GF ZH] SZJFGF\ ZC[X[ T[DH 5tYZ4 S5RL4 Z[TLGL ZF[I<8L ZH]
SZJFGL ZC[X[ tIFZAFN D8LZLI<; TYF SI]A 8[:8L\U ZL5F[8" VFjIF AFN H R]SJ6]\ SZJFDF\ VFJX[ TYF D8LZLI<;GF HyYF DF8[ .HFZNFZzLV[
:8MS ZHL:8Z GLEFJJFG]\ ZC[X[P
30. SFDULZL DF8[ H[vT[ BFTFGF\ SOR ,[JFDF\ VFjIF K[4 T[ VF>8D DF8[ H[vT[ BFTFGF\ 8[SGLS, :5[;LlOS[XG T[ VF>8D DF8[ ,FU] 50X[P
31. U|Fg8GL p5,a3TF VG];FZ TYF SFDGL 5|FIMlZ8L D]HA JS" VM0"Z VF5JFDF\ VFJX[ VYJF 8[g0Z S[g;, SZJFDF\ VFJX[P
32. SFDMGL V\NFHLT ZSD SZTF\ p\RF EFJM DFgI ZC[X[ GCLP
33. SM.56 ;\HMUMDF\ 8[g0Z 5|lS|IF ZN SZJFGL4 8[g0Z GF D\H]Z SZJFGL TYF JS" VM0"Z ZN SZJFGL ;TF 5|F[H[S8 0FIZ[S8ZzL4 lH<<FF H/:+FJ
lJSF; V[SD4 HFDGUZGL ZC[X[P
34. V[:8LD[8 D]HA OZHLIFT56[ U]6FtDSqHyYFtDS SFDULZL 5]6" SZJFGL ZC[X[P HM T[D SZJFDF\ SM. R}S H6FI TM R]SJ6]\ SZJFDF\ VFJX[ GlCP
35. DF8L SFDDF\ H[ V[Hg;LG]\ 8[g0Z D\H]Z YFI T[DGF äFZF :JvBR[" 8F[8, :8[XG NJFZF SFD SIF" 5C[,FGF\ VG[ SFD 5]6" YIF 5KLGF :Y/ 5ZGF
,[J, ,. ;F.8 5ZGF .HG[ZG[ R[S SZFJLG[ A\G[ ,[J, JrR[GF TOFJTGF\ HyYF D]HA R]SJ6]\ SZJFDF\ VFJX[P
36. 8[g0Z AL0GF SJZ p5Z 8[g0Z ID G\AZ OZHLIFT ,BJMP
37. H/FXIGF\ 0L;L<8L\UYL GLS/TL DF8L .HFZNFZzLV[ SM. G[ J[RL VF5L XSX[ GlCP T[J] SZX[ TM H[8,L DF8L J[RL CX[ TM CJF,FGF .HG[Z GSSL
SZ[ T[8,L ZSD R]SJ6FDF\YL S5FT SZJFDF\ VFJX[P
38. 8[g0Z EZGFZ SMg8=FS8Z VYJF T[GL 5[-LqSd5GLGF\ EFULNFZ ;NZC] IMHGFGF\ SD"RFZL VYJF ;lDlTGF\ ;eIM VYJF T[GF ;UF ;A\WL ;lDlTGF\
39. H/FXIGF 0L;L<8L\UGF\ K[0[ J8L"S, S8 G ZFBTF IMuI -F/ ZFBL SFDULZL CJF,FGF\ .HG[ZGL ;]RGF 5|DF6[ SZJFGL ZC[X[P
40. SFDDF\ WFZF WMZ6 G H/JFI TM H/:+FJ ;lDlT VG[ 5|FIMHGF lGIFDSzL4 lH<,F H/:+FJ lJSF; V[S[DvHFDGUZ wJFZF H[ lG6"I ,[JFDF\
VFJX[ T[ DFgI ZFBJFGF\ ZC[X[P
President, PMKSY WDC‐2.0 Samiti – Meghpar, Jamnagar Signature Of Contractor
Technical Specification
ITEM NO. 1 & 2:- Excavation For deepening of pond/check dam including transporting and spreading the
excavated material for raising of embankment in uniform layer or as directed including
dressing, braking clods etc. for lead up to 1km and lift without rolling watering etc.
complete (Irri. sor 2023-24, che.no.5 p.no.20 I.no.1(A&B))
Excavation in all sort of strata and formation incl. depositing the unusual excavated stuff
as and where directed incl. sorting and stacking useful materials as directed upto 200 mt
lead and all lift etc. completed incl. dewatering
(A) IN OVERBURDEN INCL HARD MURRUM (B) Soft Rock
(Irri. sor 2023-24, che.no.5 p.no.20 I.no.1(A&B))
GENERAL: The site on which the structure is to be built shall be cleared and all obstructions, loose
stone, materials and rubbish of all kind, bush, wood and trees shall be removed as directed.
The un usefull materials so obtain shall be disposed of as directed incl. burning. The rate of
such site clearance shall be deemed to be incl. in the rate of the item of work. Any soil which
generally yields to the close application of pickaxes & shovels, phawaras, rakes or any such
ordinary excavating tools or organic soil, gravel, silt, sand clay/stiff clay, peat, soft to hard
murrum, rubber stone over burden etc. under this category. All specification for excavation
mentioned in general technical specification shall apply to this item also for classification of
strata, pay line, shoring and strutting, blasting, disposal of excavated stuff, etc.
SCOPE OF WORK: The work to be done under these specifications shall consist of furnishing all tools, plant and
labors and material required to carrying out excavation, conveyance and disposal of the
excavated stuff, maintaining the excavation slopes and trenches, preparing the foundations
as shown in the drawing or as directed in overburden including hard murrum strata.
Including dewatering.
WORKMANSHIP: Workmanship of the work under this item of work shall be as describe in general tech.
specification for excavation.
MODE OF MEASUREMENT AND PAYMENT:
Payment shall be made on volumetric basis per cubic meter No payment shall be made for
the unauthorized extra excavation. The measurement shall be taken as specified in general
Technical specification for excavation.
ITEM:-3 prov.& Laying in position "NOMINAL MIX" cement concrete using cement, sand and gravel by mass
and machine mix for RCC including necessary formworks compaction curing as directed with all
lead & lift etc. complete For foundation concrete /other general purpose. Concrete (1:2:4) Grade
size - 20mm to 40mm (cement level 313 kg/cum)
(Irrigation SOR 2023-24 CH-5 Page no-20, Item NO.4 (4C))
President, PMKSY WDC‐2.0 Samiti – Meghpar, Jamnagar Signature Of Contractor
i) CEMENT: Specification m-2 of material section shall apply. ii) WATER: Specification m-1 of material section
shall apply. iii) FINE AGGREGATE: Specification m-3 of material section shall apply. Iv) COARSE AGGREGATE:
Specification m-4 of material section shall apply.
General technical specifications for concrete works shall apply here also. Concrete mix shall be " nominal mix
" or design mix as decided by engineer in charge and is to be design by preliminary tests in the laboratory. The
proportions for ingredients shall be by mass on except for water. The grade of concrete shall be M-15 (1:2:4)
with M.S.A.- 40mm
SCOPE OF WORK. :
The scope of work under this item includes doing RCC at various work locations & compartments as classified
under the item including providing and supplying all materials labors and use of equipment machinery with
providing, erecting and dismantling of necessary formwork and centering. The scope of work also incl. laying
of concrete in position as directed by machinery or by manually with compaction by means of needle of surface
vibrator together with finishing the expose surface of concrete work to obtain dense and compact surface,
curing for a specified period etc.
Specifications for workmanship laid down in general technical specifications for concrete works shall apply
here also. The workability of the concrete mix shall be controlled by maintaining a w/c ratio, that is bound to
give a concrete mix which is just sufficiently wet to be placed and compacted without difficulty with the means
MODE OF MEASUREMENT AND PAYMENT :
The rate shall be for a unit of one cubic meter. The consolidated cubical contents of concrete work as specified
in item shall be measured. The concrete laid in excess of section shown on drawing or as directed shall not be
measured. No deduction shall be made for-
i) Ends of beams, girders, joist, steps, posts etc. of des-similar materials upto 500 sq. cms. in section ii) Opening
upto 0.1 sq.mt.in area.
The rate includes cost of all materials, labor, tools and plants required for mixing, placing in position, vibrating
and compacting, finishing, as directed, curing and other incidental expenses for producing concrete of
specified strength. The rate includes cost of formwork.
prov.& Laying in position cement concrete using cement, sand and crushed metal coarse aggregate
and machine mix for PCC/RCC including necessary formworks compaction by vibrator, curing as
directed with all lead & lift etc. complete (Excluding cost of steel) FOR BODY WALL, APRON, TRAINING
WALL, SIDE WALL, SPLAY WALL, KEY WALL, CUT OF WALL ETC. 4/C Concrete (1:2:4) and MSA-40mm
(cement level 313 kg/cum)
(Irrigation SOR 2023-24 CH-5 Page no-20, Item NO,4 (4C)
i) CEMENT : Specification m-2 of material section shall apply. ii) WATER :Specification m-1 of material section
shall apply. iii) FINE AGGREGATE : Specification m-3 of material section shall apply. Iv) COARSE AGGREGATE
: Specification m-4 of material section shall apply.
President, PMKSY WDC‐2.0 Samiti – Meghpar, Jamnagar Signature Of Contractor
General technical specifications for concrete works shall apply here also .Concrete mix shall be " Machine mix
" or design mix as decided by E.I.C,. and is to be design by preliminary tests in the laboratory. The proportions
for ingredients shall be by mass only except for water. The grade of concrete shall be M-15 (1:2:4) with size
of aggregate MSA-40mm
SCOPE OF WORK. :
The scope of work under this item includes doing .R.C.C. at various work locations and compartments as
classified under the item including providing and supplying all materials labors and use of equipment
machinery with providing, erecting and dismantling of necessary formwork and centering. The scope of work
also incl. laying of concrete in position as directed by machinery or by manually with compaction by means of
needle of surface vibrator together with finishing the expose surface of concrete work to obtain dense and
compact surface, curing for a specified period of 28 days.
Specifications for workmanship laid down in general technical specifications for concrete works shall apply
here also. The workability of the concrete mix shall be controlled by maintaining a w/c ratio that is bound to
give a concrete mix which is just sufficiently wet to be placed and compacted without difficulty with the means
MODE OF MEASUREMENT AND PAYMENT :
The rate shall be for a unit of one cubic meter. The consolidated cubical contents of concrete work as specified
in item shall be measured. The concrete laid in excess of section shown on drawing or as directed shall not be
The rate includes cost of all materials, labor, tools and plants required for mixing, placing in position, vibrating
and compacting, finishing, as directed, curing and other incidental expenses for producing concrete of
specified strength. The rate includes cost of formwork.
Back filling with selected earth brought from outside borrow area excavated useful material including
watering ramming, consolidation by hand temping all lead and lift etc. complete.
( Irri. SOR 2023-24, Cha.No. 6, Page No.23, Item No.4)
Selected earth obtain from outside the borrow area/pits or useful excavated materials other than I.P. material.
GENERAL : SCOPE OF WORK :WORKMANSHIP :
The item includes excavation from borrow area/pits & conveying the same to the site of work, stacking and
spreading in uniform layers of thickness ( loose ) not exceeding 25 cm or as directed & shall be well compacted.
No back filling shall be done behind masonry/concrete which is steel fresh. Consolidation near the structure
shall have to be done by suitable pneumatic tampers/hammers, or plate vibrators, or light rollers etc as
directed by engineer in charge with watering. Back filling shall be done simultaneously with raising of the
structure. The scope of work includes excavation, carting, loading/unloading, stacking, spreading the material
with rolling and watering with all machineries and labors required with a lead of 1.0 km and all lift. Work shall
be done with all care so that there shall not be any damage to the structure. Finished earth fill shall be of
required density.
MODE OF MEASUREMENT AND PAYMENT :
The item shall be paid on cubic meter basis based upon cross section of work done. The rate is inclusive of
rolling and watering and lead of 1.0 km or as specified in the item and all lift.
President, PMKSY WDC‐2.0 Samiti – Meghpar, Jamnagar Signature Of Contractor
Providing and laying 15cm thick STONE SOLING below apron using stone weighing not less than 20 Kg
or as specified as per design and drawing including hand packing etc. complete with all lead and lift.
(Irri. SOR 2023-24, Cha. No.8, Page No.41, Item No.24).
This item includes providing and laying rubble for soling base to concrete provided on causeway top as per
drawing or as specified by engineering charge.
The material required for this work like rubble shall be of good quality as specified in general specification.
The weight of stone shall not be less than as specified. Voids shall be packed by small stone or boulders and hammered
by hand to fix tightly in voids.
Before starting the work, the base ground or earth work shall be well dressed and in proper gradient.
All material equipment and labor required for providing and laying rubble talus shall be supplied by the
contractor. The stones shall be laid carefully true to line and grades as directed by Engineer-in-Charge. The voids
between stones shall be filled by small stones and packed firmly. The top of talus shall be well in proper gradient.
The measurement of work shall be in cubic meter basis of work actually done. The rate shall be including cost
of materials and labors for completed item. The rate shall be paid for cubic meter basis of completed item.
Item NO.7 Prov. &Laying in position-controlled cement concrete using cement, sand and crushed aggregate by
mass and machine mix for R.C.C./CC work including necessary formworks, centering, scaffolding,
compaction by vibrator, curing as directed with all lead & lift etc. complete. Excluding cost of
reinforcement FOR PLINTH COURSE & COPING (A) Concrete grade m-15 and MSA-20 mm
Irrigation SOR 2023-24 .Che.no.5 p.no.20 I.no.4(4C)
i) CEMENT : Specification m-2 of material section shall apply.
ii) WATER : Specification m-1 of material section shall apply.
iii) FINE AGGREGATE : Specification m-3 of material section shall apply.
iv) COARSE AGGREGATE : Specification m-4 of material section shall apply.
General technical specifications for concrete works shall apply here also .Concrete mix shall be " nominal
mix " or design mix as decided by engineer in charge, and is to be design by preliminary tests in the
laboratory. The proportions for ingredients shall be by mass only except for water. The grade of concrete
shall be M-15 (1:2:4) with M.S.A.- 20 mm
SCOPE OF WORK. :
The scope of work under this item includes doing RCC at various work locations & compartments as
classified under the item including providing and supplying all materials labors and use of equipment's
machinery with providing, erecting and dismantling of necessary formwork and centering. The scope of
work also incl. laying of concrete in position as directed by machinery or by manually with compaction
by means of needle of surface vibrator together with finishing the expose surface of concrete work to
obtain dense and compact surface, curing for a specified period etc.
President, PMKSY WDC‐2.0 Samiti – Meghpar, Jamnagar Signature Of Contractor
Specifications for workmanship laid down in general technical specifications for concrete works shall
apply here also. The workability of the concrete mix shall be controlled by maintaining a w/c ratio, that is
bound to give a concrete mix which is just sufficiently wet to be placed and compacted without difficulty
with the means specified.
MODE OF MEASUREMENT AND PAYMENT:
The rate shall be for a unit of one cubic meter. The consolidated cubical contents of concrete work as
specified in item shall be measured. The concrete laid in excess of section shown on drawing or as directed
shall not be measured. No deduction shall be made for-
i) Ends of beams, girders, joist, steps, posts, etc. of des-similar materials upto 500 sq. cms. in section..
ii) Opening upto 0.1 sq.mt.in area.
The rate includes cost of all materials, labor, tools and plants required for mixing, placing in position,
vibrating and compacting, finishing, as directed, curing and other incidental expenses for producing
concrete of specified strength. The rate includes cost of formwork.
ITEM NO. 8 Earthwork for embankment from borrow pit in all sort of soil and soft murrum or
other suitable strata as directed including braking clods and dressing to the design
sec with lead as under and all lift incl. site clearance etc. complete. For all Canal
capacity & without rolling and watering 0 to 30 mt lead.
(Irrigation SOR 2023-24, Chapter No.5, Item No.4, Page No.23 )
GENERAL : Specifications and requirement laid down in general technical specification for EARTH
WORK shall apply.
SCOPE OF WORK: The scope of this item of work includes back filling by quarrying, transporting the suitable
materials from borrow areas or suitable excavated stuff with a all lead all lift and laying,
spreading in specified layer with necessary dressing, finishing, ramming and consolidation
by hand tamping etc. complete.
WORKMANSHIP: Specifications laid down in general technical specification for EARTH WORK shall apply.
Suitable materials shall be stacked in piles and same shall only be spread after approval of
department. Spreading in specified layer can be performed by suitable machinery or by
manually. Embankment material shall be free from all perishable or unsuitable material; if
found shall be removed during embankment operation and embankment shall be cleaned.
The bond between old and new earth work / embankment shall be carried out by loosened
the old embankment surface by means plough, ripper or other suitable method or providing
steps as per site condition.
The work shall have to carry out with best workmanship manner with the use of modern
earth work machineries as specified in general technical specifications.
MEASUREMENT AND PAYMENT:
The payment of this item shall be made on cubic meter basis of the completed work in all
respect. The mode of arriving at quantities payable under this item shall be governed as
mention in general technical specification for earth work.
President, PMKSY WDC‐2.0 Samiti – Meghpar, Jamnagar Signature Of Contractor
ITEM NO. 9 Providing and fixing in position white marble plate of size 45x45x1.8 cm incl. engraving the
letters as drawing/as directed etc. complete.
Irrigation SOR 2023-24 Chapter No.5, Item No.17, Page No.22
MARBLE PLATE : Marble shall be of good quality white of fine grain.
GENERAL: SCOPE OF WORK: WORKMANSHIP:
The scope of item includes providing, engraving letters and fixing marble plate of size 45 X
45x1.80 cms. as and where directed with all lead & lift. The work shall be carried out with
best workman like manner. The marble shall be of good quality, fine grained, hard, uniform
and homogeneous in texture. The marble shall have crystalline grain and free from any
defects and cracks. The front face shall be of machine polished one and rear side shall be
rough to provide good bond to cement mortar. The letters of required size, font and lipi shall
be engraved by best artisan as directed by engineer in charge.
The wall surface shall be covered with 10mm thick rough cement mortar 1:3 plaster and
allowed to harden. If it is to be fixed on already plastered surface, than, plaster shall be
roughened by chisel. The rates are inclusive of cement plaster & cement mortar / slurry. The
back of marble plate shall be floated with cement slurry and fixed to the surface by gentle
tapping with wooden hammer. All the four edges shall be flushed with vata. The work shall be kept
wet for seven days.
MODE OF MEASUREMENT AND PAYMENT :
The work shall be paid on number basis of completed work.
President, PMKSY WDC‐2.0 Samiti – Meghpar, Jamnagar Signature Of Contractor
1 8[g0Z OMD"DF\ NXF"jIFD]HAGL SFDULZL SZJF DF8[ C]\ ;CDT K]\P H[ DF8[ 8[g0Z OMD"DF\
NXF"J[, TDFD XZTM TYF lGIDM D[ JFR[, K[P VG[ T[ DG[ SA], D\HZ] K[P
2 SFDULZL DF8[GL ;F.8 V\NFH 5+ TYF :5[XLlOS[XG JU[Z[ D[ HFT[ RSF;[, K[P
3 8[g0Z OMD"GF ;L0I], AL DF\ VDFZF äFZF EZ[,F EFJ[ SFDULZL SZJF T{IFZ K\]P
4 8[SGLS, :8FO TYF ;lDlTäFZF VF5JFDF\ VFJTL ;]RGFVM TYF DFU"NX"G DFgI ZC[X[P
5 p5ZF\T SFDULZL V\U[ ;ZSFZzL TZOYL ;CFIS VG]NFG D/JFDF\ lJ,\A YJFGF SFZ6[4
H[ SZ[,F SFDM V\U[ R]SJ6\] SZJFDF\ lJ,\A YFI TM T[ R]SJ6\] lJ,\AYL ,[JFDF\ VDFZL
6 U|Fg8GF VEFJ[ VYJF VgI SFZ6M;Z4 8[g0Z D\H]Z YJF KTF\ 56 JS"VM0"Z G VF5JFDF\
VFJ[4 tIF ;]WL 8[g0Z D\HZ] YI] CMJF KTF\ 56 SFDULZL X~ SZJFGL ZCX[ GCL4 T[ DG[
7 8[g0Z D]HA SZJFGF YTF SFDM 5}6" SZ[, SFDGL Sd%,LXG TFZLB YL !vJQF" ;]3L AWFH
SFDGF ;DFZSFDqDZFDTGL HJFANFZL .HFZNFZzL GL ZC[X[P H[ DG[ SA], D\HZ] K[P
SMg8=FS8ZzLGL ;CL VG[ ;LSSM
President, PMKSY WDC‐2.0 Samiti – Meghpar, Jamnagar Signature Of Contractor
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
TENDER MEGHPAR-7-3-26.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .