Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 LAccepted-AOC | ₹1.4 L | L1 | Accepted-AOC L1 |
| 2 | L2₹1.4 LRejected-Finance | ₹1.4 L | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | JAFAR CHAVILAKADAN L2 | SHIHABUDHEEN I L1 |
|---|---|---|---|---|---|
| 1.00well | |||||
| 1.00 | OD451860/2025-2026:Supplying and filling with 6mm stone aggregates in trenches and embakments as per directiopn of site engineer-in charge. | 13.75 | cum | 3,264.74 ₹44,890.18 | 3,264.74 ₹44,890.18 |
| 1.00 | 50.2.25.1:Filling with contractor's own earth ( excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge | 3.44 | cum | 730.24 ₹2,509.1 | 730.24 ₹2,509.1 |
| 1.00 | OD451862/2025-2026:Engaging special Mazdoor for cleaning | 12 | Day | 976.11 ₹11,713.32 | 976.11 ₹11,713.32 |
| 1.00 | 50.5.7:Reinforced cement concrete work in well-staining excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1. 5:3 ( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) | 2.9 | cum | 9,859.03 ₹28,591.19 | 9,859.03 ₹28,591.19 |
| 1.00 | 5.9.12:Centering and shuttering including strutting, etc. and removal of form for:Well steining | 57.92 | sqm | 309.33 ₹17,916.39 | 309.33 ₹17,916.39 |
| 1.01 | 5.22A.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Thermo - Mechanically Treated bars of grade Fe-500D or more | 261 | kg | 115.8 ₹30,223.8 | 112.55 ₹29,375.55 |
| 1.01 | 50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete | 10 | hour | 345.94 ₹3,459.4 | 345.94 ₹3,459.4 |
Updated dates
Tender Value
₹1.3 L
EMD Value
₹3,176
Closing Date
3 Mar 2026, 2:00 pmClosed
ASSISTANT ENGINEER
THE ASSISTANT ENGINEER LID EW SECTION A R NAGAR GP 676305
ANNUAL PLAN ABDURAHIMAN GP PROJ NO 415 26 RENOVATION OF KOOMEN CHINA PANCHAYATH WELL WARD 19
2026_LSGD_839187_30
07/AE/ARNR/25-26
Open Tender
Civil Works - Others
270 days
A R NAGAR
Please refer Tender documents.
10 documents required · 10 mandatory
₹555
₹3,176
20 Jun 2026
23 Feb 2026
4 Mar 2026
23 Feb 2026
3 Mar 2026
23 Feb 2026
OD451860/2025-2026:Supplying and filling with 6mm stone aggregates in trenches and embakments as per directiopn of site engineer-in charge.
50.2.25.1:Filling with contractor's own earth ( excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge
OD451862/2025-2026:Engaging special Mazdoor for cleaning
50.5.7:Reinforced cement concrete work in well-staining excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1. 5:3 ( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
5.9.12:Centering and shuttering including strutting, etc. and removal of form for:Well steining
5.22A.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Thermo - Mechanically Treated bars of grade Fe-500D or more
50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1414120.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.29 MB
BOQ_1414120.xls
BOQ • 0.30 MB
2.pdf
Tender Documents • 0.05 MB
viewsbd.pdf
Other Document • 1.79 MB
Download all tender documents and submit your bid