Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.9 LAccepted-AOC 67 AVANAKINVILAI CHENKAL VLATTANKARA | ₹7.9 L | L1 | Accepted-AOC Lowest rate quoted at estimate rate including GST |
Tender Value
₹6.7 L
EMD Value
₹16,745
Closing Date
12 May 2026, 5:00 pmClosed
Executive Engineer,PMU ,Kattakada.
O/o Executive Engineer,PMU,Kattakada
Construction of 1km 11KV ABC Line from ITI Junction to Pongumpotta under Electrical Section, Udiyankulangara of Electrical Division, Neyyattinkara under Electrical Circle, Kattakada
2026_KSEB_849188_1
EE/PMU(KTDA)/ET-04/2026-27 dated 02.05.2026
Open Tender
Electrical Works
Percentage
120 days
Udiyankulangara
6 documents required · 6 mandatory
₹1,652
₹16,745
17 Sept 2026
2 May 2026
16 May 2026
2 May 2026
12 May 2026
2 May 2026
2 May 2026 - 9 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Labour charges for loading HT A type pole from the stacking place and unloading the same at work site (transportation by any vehicle). | 13 | No | 906.41 | ₹11,783.33 |
| 2 | Labour charges for loading HT PSC pole from the stacking place and unloading the same at work site (transportation by any vehicle). | 30 | No | 762.14 | ₹22,864.2 |
| 3 | Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 numbers of poles excluding loading& unloading charges. | 11 | Trip | 3,142.26 | ₹34,564.86 |
| 4 | Erecting one HT "A" type Pole in position incl digging & back filling pit, drawing earth leads etc (without fitting cross arm) | 11 | E | 3,661.19 | ₹40,273.09 |
| 5 | Erecting one HT PSC Pole in position incl digging & back filling pit, drawing earth leads etc (without fitting cross arm) | 30 | E | 2,792.41 | ₹83,772.3 |
| 6 | Fitting and erecting one HT Double Pole Structure using A type pole in position including fitting 2 No. channel cross arm, digging and back filling pit in ordinary soil, drawing sufficient length of GI earthing leads through all cross arms to the ground for earthing (excluding provision of earthing). | 1 | No | 10,473.36 | ₹10,473.36 |
| 7 | Providing concrete muffing of size 0.45x0. 45x1.5m (0.5m above GL and 1m below GL). Excavation 0.45x0.45x1m, concrete (1:3:6, 20mm) 0.45x0.45x1.5m, Plastering (1:3) 12mm 0.45x0.45mx5sides. | 13 | No | 4,028.29 | ₹52,367.77 |
| 8 | Additional rate for excavation of Pit for A type pole in Laterite. | 10 | No | 651.32 | ₹6,513.2 |
| 9 | Additional rate for excavation of one Pit for HT Pole/HT Stay in Laterite. | 20 | No | 434.91 | ₹8,698.2 |
| 10 | Fitting one Additional 75x40mm, 1.8m Channel cross arm in existing single pole including conveyance of materials. | 6 | No | 481.95 | ₹2,891.7 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1434969.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.06 MB
BOQ_1434969.xls
BOQ • 0.37 MB
BID04.pdf
Tender Documents • 0.35 MB
Corrigendum04.pdf
PDF • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .