| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹21.8 LAdmitted-Finance | ₹21.8 L | L1 | Admitted-Finance |
| 2 | L2₹35.0 LAdmitted-Finance | ₹35.0 L | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | KP Nazar L2 | INFLUX ENGINEERING L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5m in width as well as 10 sqm on plan including disposal of excavated earth up to 50 m and lift up to 1.5 m, disposed soil to be levelled and neatly dressed:
2.1.1 All Kinds of soil | 88 | Sq.M | 430 ₹37,840 | 145 ₹12,760 |
| 2.00 | Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge. | 35.2 | Cu.M | 2,900 ₹1.0 L | 2,500 ₹88,000 |
| 3.00 | DR PACKING Under foundation - Dry stone packing under foundation with good quality blasted rubble including conveyance of material and labour charges etc. complete as per direction of direction of Engineer -in-Charge. | 25.89 | Cu.M | 7,200 ₹1.9 L | 5,000 ₹1.3 L |
| 4.00 | Providing, driving and installing driven cast-in-situ reinforced cement concrete piles of grade M-30 of specified diameter and length below the pile cap, to carry safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of shoe and the length of pile to be embedded in the pile cap etc. all complete. (Length of pile for payment shall be measured from top of shoe to the bottom of pile cap):
500 mm dia piles | 232.23 | M | 9,350 ₹21.7 L | 4,500 ₹10.5 L |
| 5.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:3:6 ( 1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) | 7.33 | Cu.M | 7,100 ₹52,014.60 | 7,500 ₹54,945 |
| 6.00 | Providing and laying in position machine batched and machine mixed design mix M-30
grade cement concrete for reinforced cement concrete work, using cement content as per approved design
mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing
and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard
setting of concrete, improve workability without impairing strength and durability as per direction of
Engineer - in-charge. Note:- Cement content considered in this item is @ 350 kg/ cum. Excess o | 26.66 | Cu.M | 14,450 ₹3.9 L | 9,700 ₹2.6 L |
| 7.00 | Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Thermo - Mechanically Treated bars of grade Fe-500D or more | 5,636.75 | kg | 90 ₹5.1 L | 95 ₹5.4 L |
| 8.00 | Centering and shuttering including strutting, etc. and removal of form for: Foundations, footings, bases of columns, etc for mass concrete | 22 | Sq.M | 650 ₹14,300.65 | 500 ₹11,000.50 |
| 9.00 | Engaging following labourers for executing miscellaneous items of work at all locations and elevations, including all labour charges, ESI, PF, KCWWF contributions and all other benefits payable, hire for tools and plants, all safety precautions etc., complete.(Rate based on PRICE) | 25 | No. | 1,800 ₹45,000 | 1,800 ₹45,000 |
Tender Value
Refer Docs
EMD Value
₹50,500
Closing Date
4 Mar 2026, 2:00 pmClosed
DGMPJ
DGM PJ TCC LTD UDYOGAMANDAL PO ERNAKULAM
Construction of 90TPD HCL synthesis plant building as per the drawing
2026_TCCL_839854_1
TCCL/PROJ/90TPD/C01/F/2026
Open Tender
Civil Works - Buildings
60 days
The Travancore Cochin Chemicas Ltd
Bidder should have experience in civil works activity(Pile foundation and Pre engineered building Constructions) for value not less than 20 lakhs during the last 5 years.
6 documents required · 6 mandatory
₹2,500
Yes
₹50,500
Yes
6 Mar 2026
24 Feb 2026
5 Mar 2026
24 Feb 2026
4 Mar 2026
24 Feb 2026
Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5m in width as well as 10 sqm on plan including disposal of excavated earth up to 50 m and lift up to 1.5 m, disposed soil to be levelled and neatly dressed: 2.1.1 All Kinds of soil
Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge.
DR PACKING Under foundation - Dry stone packing under foundation with good quality blasted rubble including conveyance of material and labour charges etc. complete as per direction of direction of Engineer -in-Charge.
Providing, driving and installing driven cast-in-situ reinforced cement concrete piles of grade M-30 of specified diameter and length below the pile cap, to carry safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of shoe and the length of pile to be embedded in the pile cap etc. all complete. (Length of pile for payment shall be measured from top of shoe to the bottom of pile cap): 500 mm dia piles
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:3:6 ( 1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size)
Providing and laying in position machine batched and machine mixed design mix M-30 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Note:- Cement content considered in this item is @ 350 kg/ cum. Excess o
Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Thermo - Mechanically Treated bars of grade Fe-500D or more
Centering and shuttering including strutting, etc. and removal of form for: Foundations, footings, bases of columns, etc for mass concrete
Engaging following labourers for executing miscellaneous items of work at all locations and elevations, including all labour charges, ESI, PF, KCWWF contributions and all other benefits payable, hire for tools and plants, all safety precautions etc., complete.(Rate based on PRICE)
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.36 MB
90TPDHCL.pdf
Tender Documents • 0.43 MB
drawing.pdf
Other Document • 0.78 MB
BOQ_1415488.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid