Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹16.3 LAccepted-AOC | 1 | Accepted-AOC Single Tender |
Tender Value
₹15.2 L
EMD Value
₹38,111
Closing Date
8 Apr 2025, 5:00 pmClosed
Executive Engineer
Executive Engineer, PWD Buildings Division Alappuzha
GENERAL-Construction of drain - at W and C hospital Alappuzha-General Civil Work(IInd Re Tender 42a)
2025_PWD_737622_3
PWD/BLDG/TR/3215/2024_5_1_1/1
Open Tender
Civil Works - Buildings
Item Wise
180 days
Alappuzha
Please refer Tender documents.
8 documents required · 8 mandatory
₹2,760
Yes
₹38,111
Yes
25 Jun 2025
1 Apr 2025
11 Apr 2025
1 Apr 2025
8 Apr 2025
1 Apr 2025
Amount
Appendix - A Construction of drain
15.2.2:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 leaner mix ( including equivalent design mix)
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
4.3.2:Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc.
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
OD244927/2023-2024:Engaging labour for lifting and placing cover slab as per the direction of Engineer in charge.
Bidder Name
safeer mon a
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1230617.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .