| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.9 LAdmitted-Fee/PreQual/Technical/Finance | -0.20% | ₹2.9 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹2.9 L+₹582.43 (0.20%)Admitted-Fee/PreQual/Technical/Finance | +0.00% | ₹2.9 L+₹582.43 (0.20%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹2.9 L
EMD Value
₹5,824
Closing Date
24 Aug 2026, 6:00 pmClosed
Executive Engineer Rew Baramulla
REW BARAMULLA
I/O ROAD FROM MIRPORA TO TURKBATPORA P/H TURKBATPORA BLOCK WAILOO UNDER SCHEME ADP (PRI) FOR THE YEAR 2026-2027
2026_RDPR_321227_7
203Xen/Rew/Bla/2026-27 Dated 17/08/2026
Open Tender
Civil Works
Percentage
45 days
Baramulla
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Executive Engineer REW Baramulla
₹5,824
11 Sept 2026
17 Aug 2026
25 Aug 2026
17 Aug 2026
24 Aug 2026
17 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directedRate for a lead upto 1 meter from cutting Edge, alll kinds of soil | 4.67 | Cum | 256 | ₹1,195.52 |
| 2 | P/L of dry stone soling h/p under floors or foundations i/c Carriage by MT | 3.87 | Cum | 1,000 | ₹3,870 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm N. size) with 30% dust | 10.94 | Cum | 5,700 | ₹62,358 |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases of columns etc. | 33.92 | sqm | 286.35 | ₹9,712.99 |
| 5 | 12mm Cement plaster of mix:( 1 cement : 6 fine sand) | 33.92 | sqm | 266.2 | ₹9,029.5 |
| 6 | S/S/Laying of WBM Grade II with specified stone aggregate and binding material including , sorting, spreading to template and consolidate with P.R.R of 8- 10 tonne capacity etc. complete.(63-45) | 73.3 | cum | 1,900 | ₹1,39,270 |
| 7 | Supply/stacking & Laying of stone dust/Moorum as binding material Including consolidation . | 11.7 | Cum | 668.95 | ₹7,826.72 |
| 8 | Providing and laying reinforced cement concrete pipe (non-pressure) for pipe culverts/crossings in single/double row in proper gradient as directed by EIC including jointing, trench excavation by mechanical means and backfilling the exavating earth and disposal of surplus excavated earth as directed from site . (Complete Job)(300 mm dia ) | 4.88 | Rm | 2,008 | ₹9,799.04 |
| 9 | carriage of sand for a lead of 25 km from Mawer | 5.2 | cum | 344.49 | ₹1,791.35 |
| 10 | carriage of Agg for a lead of 12 km from shanu | 9.3 | Cum | 305.04 | ₹2,836.87 |
stage.html
html • 0.02 MB
finance_1071970.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.18 MB
BOQ_1071970.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .