| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.4 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹7.8 L+₹39,067.82 (5.25%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹8.0 L+₹60,224.45 (8.10%)Rejected-AOC | L3 | Rejected-AOC L3 | |
| 4 | L4₹8.5 L+₹1.0 L (13.8%)Rejected-AOC | L4 | Rejected-AOC L4 | |
| 5 | Not Admitted-Fee/PreQual/Technical/Finance | - | Not Admitted-Fee/PreQual/Technical/Finance EMD exemption certificate not valid |
Tender Value
Refer Docs
EMD Value
₹21,161
Closing Date
10 Oct 2022, 5:00 pmClosed
ASSISTANT ENGINEER
MUNICIPAL OFFICE ALAPPUZHA
Annual Plan-SO392/Maintainance of Compoundwall Govt UPS Poonthope-Maintainance of Compoundwall Govt UPS Poonthope-General Civil Work
2022_LSGD_511893_1
392/22-23
Open Tender
Civil Works - Others
Item Rate
180 days
ALAPPUZHA
Please refer Tender documents.
6 documents required · 6 mandatory
₹2,206
Yes
₹21,161
Yes
3 Jan 2023
30 Sept 2022
12 Oct 2022
30 Sept 2022
10 Oct 2022
30 Sept 2022
Amount
School Compound wall Maintenance
15.7.3:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In lime mortar
15.9.1:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In Lime Mortar
7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand)
5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
50.6.2.2:Solid masonry using pre cast solid blocks (factory made) of size 30x20x15cm or nearest available size confirming to IS 2185 part I of 1979 for super structure up to floor two level with thickness 15cm in : CM 1:6 ( 1 cement : 6 coarse sand) etc complete
13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand)
50.6.3.2:Solid block masonry using pre cast solid blocks (Factory made) of size 40x20x10 cm or nearest available size confirming to IS 2185 part I of 1979 for super structure up to floor two level for 10 cm thick wall in : CM 1:6 ( 1 cement : 6 coarse sand) including cost of scaffolding complete
UNNI.S
Shaiju M P
Bidder Name
Shaiju M P
UNNI.S
JOSHY GEORGE
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_733337.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .