Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 2 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹17.2 L
EMD Value
₹34,500
Closing Date
20 Jul 2026, 5:00 pmClosed
Chairman, Temple Trust Shri Naina Devi Ji
Office of the Temple Trust Shri Naina Devi Ji
Renovation of main Temple Complex (Geeta Bhawan ) Northern side for Temple Trust Shri Naina Devi ji,Distt. Bilaspur (H.P.) Phase -2nd
2026_NDTT_138897_1
No.TTSND.Cons (T)-15-(21)-40/2026-3564 to 3576 Dated 01.07.2026
Open Tender
Civil Works
Item Rate
Shri Naina Devi Ji
Please refer Tender documents.
9 documents required · 9 mandatory
₹500
Yes
Chairman, Temple Trust Shri Naina Devi Ji
₹34,500
Yes
22 Jul 2026
13 Jul 2026
22 Jul 2026
13 Jul 2026
20 Jul 2026
13 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material upto all leads & lifts complete in all respect as per direction and best satisfaction of Engineer-in-charge. | 34.22 | Cum | 1.25 | ₹42.78 |
| 2 | Demolishing stone rubble masonry manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material upto all leads & lifts ,complete in all respect or as per the direction of Engineer-in-charge. :- In cement mortar. | 20.78 | cum | 2.25 | ₹46.76 |
| 3 | Carriage of material upto dumping site by manual / mules upto 300 metres leads ,complete in all respect as per direction and best satisfaction of Engineer-in-charge. | 112.31 | Cums | 3.25 | ₹365.01 |
| 4 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, complete in all respect as per direction and best satisfaction of Engineer-in-charge. | 57.32 | Cum | 4.25 | ₹243.61 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : -1:4:8 (1 cement : 4 fine sand : 8 graded
stone aggregate 40 mm nominal size) upto all leads & lifts ,complete in all respect or as per the direction of Engineer-in-charge. | 8.47 | Cum | 5.25 | ₹44.47 |
| 6 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : -- 1:1.5:3 (1 cement : 1.5 coarse sand): 3 graded stone aggregate 20 mm nominal size. upto all leads & lifts ,complete in all respect as per direction and best satisfaction of Engineer-in-charge. | 16.35 | Cum | 6.25 | ₹102.19 |
| 7 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement :- 1:1.5:3 (1 cement : 1.5 coarse sand) : 3 graded stone aggregate 20 mm nominal
size upto all leads & lifts ,complete in all respect as per direction and best satisfaction of Engineer-in-charge. | 13.65 | Cum | 7.25 | ₹98.96 |
| 8 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand) : 3 graded stone aggregate 20 mm nominal size) upto all leads & lifts complete in all respect as per direction and best satisfaction of Engineer-in-charge. | 47.65 | Cum | 8.25 | ₹393.11 |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form for :- Foundations, footings, bases of columns, etc. for mass concrete upto all leads & lifts complete in all respect as per direction and best satisfaction of Engineer-in-charge. | 42.01 | Sqm | 9.25 | ₹388.59 |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form for :- Columns, Pillars, Piers, Abutments, Posts and Struts upto all leads & lifts complete in all respect as per direction and best satisfaction of Engineer-in-charge. | 138.44 | Sqm | 10.25 | ₹1,419.01 |
stage.html
html • 0.02 MB
tech_bid_open.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.76 MB
SBD.pdf
Tender Documents • 2.05 MB
BOQ_205719.xls
BOQ • 0.29 MB
GST.pdf
Additional Documents • 0.84 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .