Tender Value
₹1.4 Cr
EMD Value
₹1.4 L
Closing Date
28 Oct 2026, 6:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Executive Engineer, Panchayat Road and Building Division, Morbi
Construction of Jalida to Vasundhara Road (Non Plan) Km. 0/0 to 3/80. Taluka: Wankaner, Dist: Morbi (Under MMGSY (BUJ) Yojna Year 2022-23) (Remaining Work)
354768
85/2026
Open
Civil - All
Works
Morbi
12 documents required · 12 mandatory
₹3,600
Executive Engineer, Panchayat Road and Building Division, MORBI
₹1.4 L
13 Oct 2026
13 Oct 2026
13 Oct 2026
28 Oct 2026
13 Oct 2026
Name of Work :- Construction of Jalida to Vasundhara Road (Non Plan) Km. 0/0 to 3/80.
Taluka: Wankaner, Dist: Morbi (Under MMGSY (BUJ) Yojna Year 2022-
23) (Remaining Work)
Memorandum showing items of works to be carried out
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
No. but may be more or according to
less. In Figure In Words. estimated
Rs. Ps quantieis.
1 0.032 Hect Clearing and Grubbing road length 32361.26 Rupees Thirty One
including uprooting wild vegetation, Two Thousand
grass bushes, shrubs, saplings and Sixty One and
trees girth up to 300 mm removal of Paise Twenty Six
stumps of trees cut earlier and only
disposal of unserviceable materials
and stacking of serviceable
materials to be use of ouctioned
upto all lead. including removal and
disposal of top organic soil for all
thickness. (c) By Mechanical means
in area of light Jungle.
2 25.180 Cum Earthwork for embankment 160.25 Rupees One One
including breaking clods, dressing Hundred Sixty
and Paise Twenty
etc complete with all lead and lift Five only metre
(Excluding watering and
consolidation) (A) From Borrow
Area with in all lead and lift.
3 2753.880 Cum Earthwork in cutting in all sorts of 85.38 Rupees One
soil and soft murrum including Eighty Five and
Paise Thirty Eight
conveying and spreading the stuff, only metre
embankment as and where directed
within all lead from the end of the
cutting with all required lead and
4 25.180 Cum Rolling and consolidation using 39.05 Rupees One
Vibratory Road Roller 8 - 10 tonne Thirty Nine and
Paise Five only
capacity (including Watering) (A) metre
Earthwork (Layer not exceeding
200mm thickness)
5 0.700 Cum Box Cutting the road surface to 69.36 Rupees Sixty One
proper slope and camber for making Nine and Paise
Thirty Six only
a base for road work including metre
removing the excavated stuff and
depositing on the road side slope as
directed upto all lead
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
No. but may be more or according to
less. In Figure In Words. estimated
Rs. Ps quantieis.
6 887.500 Cum Providing and Laying granular sub- 367.64 Rupees Three One
base Grade-l C.B.R. not less than Hundred Sixty
Seven and Paise
30% by providing coarse graded Sixty Four only metre
matrerial, consisting of B.T.
crushed stone aggregates 53 mm to
mm @ 20%,2.36 mm to below @
30% coarse sand combination and
stone dust/grit spreading in uniform
layers with motor grader on
prepared surface, mixing by mix in
Place method with rotovator at
O.M.C. to required dry density
including filling the depressions
which occred during the process
using vibratory roller 8-T to 10-T
complete as pef Clause-401
7 2484.430 Cum Providing, laying, spreading and 707.65 Rupees Seven One
compacting stone aggregates of 40 Hundred Seven
and Paise Sixty
to 63mm size with all lead to water Five only metre
bound macadam (W.B.M.)
specification including spreading in
uniform thickness, hand packing,
rolling with smooth wheel roller 80-
100 kN in stages to proper grade
and camber applying and broming,
stone screening/binding materials to
fill up to interstices of course
aggregate, watering and compacting
to the required density grading as
per Technical Specification Clause
405. By Menual Means
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
No. but may be more or according to
less. In Figure In Words. estimated
Rs. Ps quantieis.
8 2386.000 MT providing and laying bitumeneous 1903.39 Rupees One One
grout Base Course 75.00 mm thick Thousand Nine
using Emulsion RS-1 for tack coat and Paise Thirty Ton
at the rate of 4.00Kg/10 Sqmt on Nine only
using B.T. chips of required
gradation with asphalt of VG-30
Grade at the rate of 1.99% i.e.
Kg /MT by weight of mix including
heating and mixing in drum mix
plant transporting mix plant
transporting the mix and spreading
the same by paver finisher and
consolidation as per MOST
specification including cost of all
materials, fuel, labbours, tools, and
plants etc. using contractor's own
drum mix plant etc complete.
9 1313.000 MT Providing and laying & rolling 2713.90 Rupees Two One
37.50mm compacted thick Thousand Seven
Hundred Thirteen
Bituminous Macadam (BM) in one and Paise Ninety Ton
layer with B.T. Aggregateas as per only
MORTH specified and using
Emulsion RS1 for tack coat at the
rate of 2.5 Kg /10 Sqmt and using
bitumen (VG-30) for mixing with
aggregate at the rate of 3.50% i.e.
35.00 Kg /MT of total mix
including heating and mixing in
drum mix plant and spreading the
same with paver finisher and
consolidation with power roller
including necessary firewood, oil,
lubricants, labour charges et using
contractor's own drum mix plant
and equipment tool etc completed in
accordance with the requirement of
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
No. but may be more or according to
less. In Figure In Words. estimated
Rs. Ps quantieis.
10 732.000 MT Providing and laying and rolling of 3531.01 Rupees Three One
surfacing compacted 20mm thick Thousand Five
mix seal surface with B.T. One and Paise Ton
aggregate as specified using One only
aggregates at the rate of 5.10% i.e.
51Kg/ MT of Total mix of bitumen
using per MT of Mix including
heating and mixing in drum mix
plant and spreading the same with
paver finisher and consolidation
with vibratory roller including
necessary firewood, oil, lubricants,
labour charges using contractor's
own drum mix plant machineries
and equipment, tools etc complete
in accordance with the requirement
of specification
11 0.000 Cum Dismentaling the existing structure 0.00 Rupees and One
dismentelled materials as and where metre
directed for R.C.C. work.
12 27.350 Cum Excavation for foundation up to all 161.20 Rupees One One
Depth including sorting out and Hundred Sixty
stacking of useful materials and Twenty only metre
disposing of the excavated stuff up
to all lead in Dense or hard soil.
13 22.030 Cum Excavation for foundation up to all 274.67 Rupees Two One
Depth including sorting out and Hundred Seventy
stacking of useful materials and Sixty Seven only metre
disposing of the excavated stuff up
to all lead in Hard murrum.
14 8.170 Cum Providing and filling in foundation 2216.45 Rupees Two One
with ordinary cement concrete M- Thousand Two
Hundred Sixteen
100 mix and providing necessary and Paise Forty metre
vertical pin headers incl. Formwork, Five only
vibrating, ramming and curing
complete as directed.
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
No. but may be more or according to
less. In Figure In Words. estimated
Rs. Ps quantieis.
15 89.540 Cum Providing and casting in situ 2890.49 Rupees Two One
ordinary cement concrete M-15 mix Thousand Eight
and providing necessary pin headers and Paise Forty metre
including shuttering, scaffolding, Nine only
laying, vibrating, curing and
finishing complete without V-
Groves (A) All Height
16 23.000 Cum Providing and casting in situ 3159.23 Rupees Three One
Ordinary cement concrete M-200 Thousand One
for average 150mm thick wearing Nine and Paise metre
coat laid as directed including Twenty Three only
tamping ,vibrating, finishing, curing
and filling in joints with bitumen
17 0.130 Cum Providing and casting in situ 4791.38 Rupees Four One
controlled trimix cement concrete M- Thousand Seven
300 for avg. 200mm thick road One and Paise metre
work laid as directed included Thirty Eight only
providing and laying MS side rail of
road thickness with necessary nut
bolts pistes fixing as per width
applying plate vibrator (Electric or
Diesel) on channel compressor with
vacume dewatering system by using
all necessary equipments and
materials and machinery such as
running creed vibrator on prepaid
M.S. Channel for levelling, Vacume
pump floating and power trovelling
etc with filling the joints with
bitumen as directed etc complete
18 0.897 MT Providing and fixing in position FE 70645.65 Rupees Seventy One
500/500D TMT bar reinforcement Thousand Six
including cutting, bending and tying Five and Paise Ton
complete as per detailed drawings Sixty Five only
(A) RCC Kerb (B) RCC Footpath
(C) RCCApproach Slab (D)
Wearing coat (E) Pier (F) Abutment
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
No. but may be more or according to
less. In Figure In Words. estimated
Rs. Ps quantieis.
19 15.000 Rm Supplying and fixing reinforced 6267.87 Rupees Six One
concrete heavy duty non-pressure Thousand Two
pipes with collars for culverts Seven and Paise metre
carrying heavy traffic as per IS 458- Eighty Seven only
1991 specifications including
setting the pipes in C.M. 1:2
watering and laying (to level or
slopes) of class NP3 of internal
daimeters 1200 mm dia.with all lead
and lift as directed.
20 702.380 Cum Filling available excavated earth 125.16 Rupees One One
(excluding rock) in side shoulder Hundred Twenty
including spreading, rolling. Sixteen only metre
consolidating each deposited layer
by ramming and watering
21 2.000 No Providing and Fixing Flood Guage 2956.27 Rupees Two One
Post conferming to IRC 67-2001 Thousand Nine
Hundred Fifty Six
using Engineering grade retro and Paise Twenty
relective sheeting including lettering Seven only
and border as directed for new
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
No. but may be more or according to
less. In Figure In Words. estimated
Rs. Ps quantieis.
22 716.000 Sqm Road marking with hot applied 299.36 Rupees Two One
thermoplastic paints with Hundred Ninety
reflectorising glass beads on Thirty Six only metre
bitumin surface providing and
laying a hot applied thermoplastic
compound 2.5 mm thick including
reflectorising glass beads @
250gms per sqm area, thickness of
2.5mm is excluding of surface
applied glass beds as per IRC:35-
2015. The finished surface to be
level, uniform and free from streaks
and holes, zebra patta /bump patta
lane/center line/ edge line/cut patta.
The white color marking should
provide liminance coefficinet on
cemend road shalllbe min
mcd/m2/lux and Asphalt road
shallbe min 100 mcd/m2/lux during
the service life during the day time.
The marking should meet the
performance criteria for night time
reflectivity, wet reflectivity and skid
resistance as mentioned in the
section-15 of IRC 35-
Warranty for the Retro reflectivity
should be two years.
23 19.000 No Providing and fixing Hectometer as 295.88 Rupees Two One
per I.R.C. type design including Hundred Ninety
painting lettering elc complete (ii) Eighty Eight only
fixing in Cement concrete 1:5:10
24 70.000 No Providing and fixing guard stone as 231.19 Rupees Two One
pen I.R.C. type design including Hundred Thirty
white wasins etc. complete (1) Ninteen only
Fixing in C.C. 1:5:10
25 4.000 No Providing and fixing ordinary 515.40 Rupees Five One
Kilometer stone of precast C.C. Hundred Fifteen
and Paise Forty
1:2:4 including necessary only
reinforcement as per IRC type
design in C.C. 1:4:8 including
painting lettering etc complete
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
No. but may be more or according to
less. In Figure In Words. estimated
Rs. Ps quantieis.
26 95.000 No Providing and Fixing indicator 115.59 Rupees One One
stone of approved stone as per IRC Hundred Fifteen
and Paise Fifty
type design in CC 1:4:8 including Nine only
white washing etc. complete (i)
Fixing in Earth.
27 1.000 No Supplying and fixing Junction 5453.09 Rupees Five One
Board of MS plates and angles as Thousand Four
per IRC design 150cm x 120 cm Three and Paise
IRC Design including fixing in Nine only
C.C.1:4:8, with necessary
excavation, painting, figuring and
lettering on board etc. complete.
28 2.000 No Providing and fixing Village Name 3773.26 Rupees Three One
board as per Standard IRC type Thousand Seven
Hundred Seventy
design of steel plate including Three and Paise
painting,lettering etc. complete with Twenty Six only
fixing in C.C. 1:4:8 block with
necessary excavation
29 35.000 No Supplying and fixing road sign 3255.48 Rupees Three One
board of M.S.plates and angle iron Thousand Two
including painting, lettering etc. Five and Paise
complete including fixing in CC Forty Eight only
1:4:8 with necessary excavation etc.
complete as per I.R.C. type design.
(ii) Reflective type.
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
No. but may be more or according to
less. In Figure In Words. estimated
Rs. Ps quantieis.
30 2.000 No Cautionary Warning Sign :-Providing 3341.64 Rupees Three One
and fixing sing boards made out of Thousand Three
2mm aluminium sheet; size 90 x 90 x
90 cms. equilateral triangle as per
Sixty Four only
design of IRC-67-1977. Pre treated
with phospheting process & acid
etching; coated with one coat of epoxy
primer and two coats of best quality
epoxy paint ;reflectorised with retro
refiectivesheeting as per latest
M.O.S.T.Specifications; 3.1m long
stand postand frame fabricated from
suitable sizeiron angle of 35 x 35 x
3mm, 75 x 75 x 6mm as required;
painted with best quality epoxy
coatings in black and white bends. The
details of symbol foreach board shall
be as per the instruction of engineer in
charge. The fixing at site shall be in
1:2:4 CC blockof size 45 x 45 x
Cms. for each leg.including excavation,
curing etc.complete under the
supervision of engineer in charge.(A)
31 2.000 No Citizen's information board - Providing 8678.93 Rupees Eight One
and fixing of typical MMGSY Thousand Six
Hundred Seventy
information board as per instruction
Eight and Paise
TWO MS plates of 1.6mm thick of
Ninety Three only
mm x 750mm size fixed at top &
bottom duly welded with MS angles of
25 x 25 x 5mm thick to 75mm x 75mm
of 12 SWG square tubes posts duly
embendded in cement concrete M-15
grade blocks of 600mm x 600mm x
750mm. below ground level. painting
New letters and figure of any shade
with ready mixed synthetic enamale
paint of superior quality in required
shade and colour. All sections of
framed posts and steel tube will be
painted with primer and two coats of
epoxy paints as perdrawing clause
1701 and annexure 1700.1 (A) Class-B
High intensity Grade Retro Reflective
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
Item Quanties Estimated Item of work Estimated Rates Unit Total amount
No. but may be more or according to
less. In Figure In Words. estimated
Rs. Ps quantieis.
0 0.000 No 0 0.00 Rupees and One
Rupees One Crore Forty Lakh Twenty Seven Thousand Two Hundred Four and Paise
I \ We am \ are willing to carry out the work at ……………………… % above \ bellow percent ( Should be
written in figures and words ) of the estimated rate mentioned above. Amount of My \ Our tender works put as
* Estimated Amount * Estimated Amount
Put to tender Rs…………………… Put to tender Rs……………………
Deduct……..……..% Belowe Rs…………..….……Add……..……..% Above Rs….….…….
In words………………….……………… In words………………….………………
Note : 1 All work shall be carried out as per Public Works Department Handbook and other specifications of
Division or as directed.
GM\Wv! AW]\ H SFD AF\WSFD lJEFUGL 5]l:TSF VG[ l0JLhGGL ALHL BF; lJUT D]HA VYJF ;}RGF 5|DF6[ SZL VF5JFG]\ ZC[X[P
Note : 2 All the columns is Schedule should be filled in ink and the total of the entries in the last column should
be struck by the contractor under this signature.
GM\W o Z VG];}lRDF\ AWF BFGFGL lJUTM ;CLYL EZJL VG[ K[<,F BFGFGL GM\WMGM ;ZJF/M SZL SMg8=FS8Z[ 5MTFGL ;CL SZJLP
Note : 3 Rates quoted include clearance of site (prior commencement of work and at its close) in all respects and
hold good for work under all conditions, site, moisture, weather etc.
GM\Wv# o 8F\S[,F NZDF\4 :Y/GL sSFDGF VFZ\E[ VG[ 5}~ YFI T[ JBT[fNZ[S ZLT[ ;FO;}OL SZJFGM\ ;DFJ[X YFI K[4 VG[ T[ NZ TDFD 5lZl:YlT4 :Y/4
E[H4 CJFDFG JU[Z[ C[9/ SFD VD,DF\ ZC[X[P
Note : 4 To be continued on additional sheets, if found necessary.
GM\Wv$ o H~Z H6FI JWFZFGF SFU/M HM0L RF,]\ ZFBJ]\P
Signature of Contractor
Deputy Executive Engineer Executive Engineer
Panchayat R.& B. Sub Division Panchayat R.& B. Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1 B-1 Jalida to Vasundhara Road Remaining Work.pdf
2 specification jalida to vasundhara road compress.pdf
3 Cement Consumpation.pdf
4 Ashpahalt Consumpation.pdf
5 Circular compress.pdf
6 Sch-B.pdf
7 Qty sheet.pdf
8 Test.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .