Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹53.7 LAccepted-AOC | ₹53.7 L | L1 | Accepted-AOC L1 |
| 2 | L2₹56.4 LRejected-AOC | ₹56.4 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | ALBERT CHERIAN L1 | JINU GEORGE L2 |
|---|---|---|---|---|---|
| 1.00Reactive Maintenance(Initial Rectification Work) | |||||
| 1.00 | OD102913/2025-2026:Additional routine inspection may be required in response to reports or complaints from the police ,other authorities and the public as a result of major incidents,typhoon or flooding damages etc.and are not measurable /payable.A prepotion of the RI should be carried out either during or immediately following a period of wet weather. | 188.28 | km | 50 ₹9,414 | 55 ₹10,355.4 |
| 1.00 | OD227162/2023-2024:Providing and fixing RC work board with non reflectorized vinyl sign with 1 year warranty manufactured vinyl printed sheeting fixed over aluminium sheeting 2mm thick/ aluminium composite material 4mm thick with area not exceeding 0.9 sqm, with suitable back supporting frame of MS angle 40x40x6 and supported on GI pipe pole 50mm NB confirming to IS 1239 firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete with min size 45cmX45cmX60cm, 60 cm below ground level including painting all exposed surface with 2 coats of epoxy paint over epoxy primer and as per approved drawing and clause 801 including lettering symbols etc | 3.6 | sqm | 7,000 ₹25,200 | 7,000 ₹25,200 |
| 2.00Pre monsoon works | |||||
| 2.00 | 2.3.2.A:Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness In area of light jungle - By Mechanical Means | 0.16 | Hectare | 50,000 ₹8,000 | 50,000 ₹8,000 |
| 2.00 | 2.1.2:Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 metres and earth filling in the depression/pit. Girth from 600 mm to 900 mm | 20 | each | 1,300 ₹26,000 | 1,200 ₹24,000 |
| 2.00 | OD227165/2023-2024:Engaging labour for cleaning existing drain and existing chocked culverts | 24 | Day | 1,050 ₹25,200 | 1,150 ₹27,600 |
| 2.00 | OD227166/2023-2024:Hire charges of JCB | 8 | Day | 10,000 ₹80,000 | 10,500 ₹84,000 |
| 2.00 | OD227167/2023-2024:Hire charges for Tipper for removing the materials to the dumping place | 28 | hour | 400 ₹11,200 | 400 ₹11,200 |
| 2.01 | 55.15:Refurbishment of existing signboardsRefurbishment of existing signboards of all size except gantry mounted ones to their original reflectivity & position by removing obstructions like overgrowth vegitation etc ,if any,washing the signboards with water & soap solution to remove all dirt, oil etc. , correcting any dislocations including minor repairs, replacement of lost nut and bolts etc complete. | 70 | no | 200 ₹14,000 | 200 ₹14,000 |
Tender Value
₹50.8 L
EMD Value
₹50,000
Closing Date
5 Sept 2025, 5:30 pmClosed
Executive Engineer PWD Roads Division Muvattupuzha
O/o Executive Engineer PWD Roads Division Muvattupuzha
The estimate includes item for Routine inspection and installation of RC board Necessary premonsoon items anticipatory item Emergency provisions
2025_PWD_790457_1
PWD/RB/TR/1962/2024_5_1_1/1
Open Tender
Civil Works - Roads
365 days
Ernakulam
Please refer Tender documents.
8 documents required · 8 mandatory
₹2,760
₹50,000
Yes
3 Jul 2026
23 Aug 2025
8 Sept 2025
23 Aug 2025
5 Sept 2025
23 Aug 2025
Amount
Reactive Maintenance(Initial Rectification Work)
OD102913/2025-2026:Additional routine inspection may be required in response to reports or complaints from the police ,other authorities and the public as a result of major incidents,typhoon or flooding damages etc.and are not measurable /payable.A prepotion of the RI should be carried out either during or immediately following a period of wet weather.
OD227162/2023-2024:Providing and fixing RC work board with non reflectorized vinyl sign with 1 year warranty manufactured vinyl printed sheeting fixed over aluminium sheeting 2mm thick/ aluminium composite material 4mm thick with area not exceeding 0.9 sqm, with suitable back supporting frame of MS angle 40x40x6 and supported on GI pipe pole 50mm NB confirming to IS 1239 firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete with min size 45cmX45cmX60cm, 60 cm below ground level including painting all exposed surface with 2 coats of epoxy paint over epoxy primer and as per approved drawing and clause 801 including lettering symbols etc
Pre monsoon works
2.3.2.A:Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness In area of light jungle - By Mechanical Means
2.1.2:Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 metres and earth filling in the depression/pit. Girth from 600 mm to 900 mm
OD227165/2023-2024:Engaging labour for cleaning existing drain and existing chocked culverts
OD227166/2023-2024:Hire charges of JCB
OD227167/2023-2024:Hire charges for Tipper for removing the materials to the dumping place
55.15:Refurbishment of existing signboardsRefurbishment of existing signboards of all size except gantry mounted ones to their original reflectivity & position by removing obstructions like overgrowth vegitation etc ,if any,washing the signboards with water & soap solution to remove all dirt, oil etc. , correcting any dislocations including minor repairs, replacement of lost nut and bolts etc complete.
Proactive / preventive maintenance
55.4:Supplying and stacking 36mm size hard broken stone in standard heaps for measurement.
55.8.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface.
5.2.a:Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
5.6.2.a:Providing and laying bituminous concrete with 80-100 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with a bituminous binder( NRMB) @ 5.4 percent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level, and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects For Grading - II (13.2 mm Nominal Size)
OD35428/2025-2026:Filling up potholes with bituminous ready mix compound (25 kg bag) and compacting by ramming to get a compact surface after applying bituminous priming coat measured seperately including cost of material, laying charges, transportation to site etc. complete rate is arrived for a bag of 25 kg
12.4:Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
12.8.1.C:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer - (Without formwork)
12.8.A.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. PCC Grade M15
12.40:Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications
8.13:Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads on Bituminous Surface @ 250 gms per sqm area, the thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35. The finished surface to be level, uniform, and free from streaks and holes.
Emergency Works
OD227172/2023-2024:Hire charges of JCB for clearing water stagnation, deposited sols from road portion etc
OD227173/2023-2024:Hire charges for Tipper for removing the materials to the dumping place
OD35432/2025-2026:Engaging manmazdoor
JINU GEORGE (BID ID -2324413)
Bidder Name
JINU GEORGE
ALBERT CHERIAN
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1302653.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid